Afghanistan, Farah Province - af/14

Water Diversion

Closing Date: 02.02.2019 (Tender Closed)

Invitation for bids, deadline 02.02.2019, for the construction of a Diversion Tunnel for Farah’ Bakhshabad Dam. A pre-bid meeting will be held on the 09.01.2019 at 10.00 am (Local Time) at MEW, Procurement Directorate  4floor, Darul Aman Road, Kabul, attn. Mr. Ramin Noori, tel +93-074-9569070, email ramin.noori123@gmail.com. Contact National  Procurement Authority (NPA), Kabul, Afghanistan, attn Shekiba Hajizada, Procurement Specialist, tel +93-020-2147557 or +93-079-1045627, email   Shekiba.hajizada@aop.gov.af.  Visit

http://mew.gov.af/en/tender/invitation-for-bids-construction-of-diversion-tunnel-of-farah-bakhshabad-dam.

Ref.n. NPA/MEW/97/W-2350/ICB. 02/19.



Permalink

Afghanistan, Parwan - af/13

Highway

Closing Date: 05.09.2012 (Tender Closed)

Solicitation no W5J9JE12R0144 by USACE District Kabul, deadline 05.09.2012, for improvements to Salang tunnel, Salang Pass, Parwan Province including design, construction, improvement and reconstruction of pavement and drainage systems, power plant and fuel storage for lighting and ventilation refurbishment, and camera monitoring system. More from Vincent Daniels in Kabul, tel +540 662 4538, and visit https://acquisition.army.mil/asfi/solicitation_view. 32/12.



Permalink

Afghanistan, Salang - af/11

Highway

  No tunnelling activity being monitored at present. However, 2.7 km-long Salang tunnel was the site of the worst recorded road accident in a tunnel when two Russian military fuel tankers collided and exploded killing and maiming over 700 troops. Sept 1999.



Permalink

Request for Information (RFI) from capable and reliable sources concerning construction related to Kajaki Dam – Irrigation Works Tunnel project located on Helmand river, 90 km northwest of Kandahar. Work includes removal and replacement of three 84-inch Roto valves and three 84-inch Jet valves with ancillary equipment and replacement of actuation and control systems. Solicitation number W5J9LE-12-SS-0001. Point of contact Mark Jones in Kandahar, tel +1 540 667 6867, e-mail mark.t.jones@usace.army.mil. RFI replies to Nicholas.P.Emanuel@usace.army.mil with courtesy copy to TAS.Contracting@usace.army.mil. Note: RFP under NAICS (237990 heavy and civil engineering construction) planned for 15.02.2012. 04/12.



Permalink

Request for Proposal (RFP), deadline 13.08.2012, for construction work at Kajaki Dam – Irrigation Works Tunnel project located on Helmand river, 90 km northwest of Kandahar. RFP issued under NAICS 237990 heavy and civil engineering construction. Contract requires removal and replacement of three 84-inch Roto valves and three 84-inch Jet valves with ancillary equipment and replacement of actuation and control systems, and condition survey of unlined tunnels and similar associated works. Solicitation number W5J9LE-12-R0036, contract duration 720 days, value EUR20-80 million (USD25-100 million). Point of contact Nicholas Emanuel in Kandahar, tel +1 540 667 6581. Send bids by e-mail to Nicholas.P.Emanuel@usace.army.mil with courtesy copy to TAS.Contracting@usace.army.mil. 22/12



Permalink