Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Nepal

Nepal, Far-Western Development Region - np/22

Expressway

Closing Date: 27.04.2020 (Tender Closed)

Invitation for prequalification, deadline 27/04/20, for Planning, Design, Engineering, Procurement, Construction and Commissioning of a Twin Double Lane Standard Highway Tunnel (3355 m, 3329 m). Also, four bridges and expressway works on Engineering Procurement Construction (EPC) for the Kathmandu-Terrai/ Madhesh Fast Track (KTFT) Expressway/Road Project from Chhokredanda Ch. 26+350 to Dhedrekhola Ch. 30+695. There will be a total construction period of 42 months, including design period of 6 months is envisaged for construction of Tunnel and bridges. Invitations to tender will be made in August, 2020. For further information http://www.bolpatra.gov.np where applications have to be submitted. Contact Nepali Army, Kathmandu, tel 00 977 1 4267060, email ft-procmgmt@nepalarmy.mil.np. Visit https://bolpatra.gov.np/egp/searchOpportunity. Ref.n. KTFT/ICB/PQ/TUNNEL/2076/077- 1. 16/20.



Permalink

Invitation for Prequalification, deadline 27/04/20, for Planning, Design, Engineering, Procurement, Construction and Commissioning of 2 Twin Double Lanes Standard Expressway Tunnels at Dhedre (1.630 m, 1.596 m) and at Lanedanda (1.430 m, 1.446 m), 5 Bridges and Expressway Works on Engineering Procurement Construction (EPC), from Dhedrekhola Ch. 30+695 to Lanedanda Ch. 35+316. A total construction period of 42 months including design period of 6 months is envisaged for construction of the Tunnel and bridges. Invitations to tender will be made in August, 2020. For further information http://www.bolpatra.gov.np where application have to be submitted. Contact Nepali Army, Kathmandu, tel 00 977 1 4267060, email ft-procmgmt@nepalarmy.mil.np. Visit  ttps://bolpatra.gov.np/egp/searchOpportunity. Ref.n. KTFT/ICB/PQ/TUNNEL/2076/077-2. 16/20.



Permalink


Postponed to the 16/09/20 the deadline of the invitation for Prequalification for Planning, Design, Engineering, Procurement, Construction, and Commissioning of Twin Double Lane Standard Expressway Tunnel, Bridges and Expressway Works on Engineering Procurement Construction (EPC).  Contract basis all complete (Chhokredanda Ch. 26+350 to Dhedrekhola Ch. 30+695) of Kathmandu-Terai/Madhesh Fast Track (Expressway). The section will include the tunnels at Mahadev Danda (3355 m, 3329 m) in the Makwanpur district.  For further information on the tender please click here and np/22. Ref.n. KTFT/ICB/PQ/TUNNEL/ 076/077- 1. 31/20.





Permalink


Postponed to 16/09/20 the deadline of the invitation for Prequalification for Planning, Design, Engineering, Procurement, Construction, and Commissioning of Twin Double Lane Standard Expressway Tunnels, Bridges and Expressway Works on Engineering Procurement Construction (EPC). Contract basis all complete (Dhedrekhola Ch. 30+695 to Lanedanda Ch. 35+316) of Kathmandu-Terai/Madhesh Fast Track (Expressway). The section will include the tunnels at Dhedre (1.630 m, 1.596 m) and at Lanedanda (1.430 m, 1.446 m) in the Makwanpur district. Pre submission meeting will be held at 13h00 on 06/08/2020 in KTFT project, Nepali Army, Kathmandu, Nepal. For further on the tender click here and np/22. Ref.n. KTFT/ICB/PQ/TUNNEL/076/077-2. 31/20.





Permalink