Invitation for Prequalification, deadline 27/04/20, for Planning, Design,
Engineering, Procurement, Construction and Commissioning of 2 Twin Double Lanes
Standard Expressway Tunnels at Dhedre (1.630 m, 1.596 m) and at Lanedanda
(1.430 m, 1.446 m), 5 Bridges and Expressway Works on Engineering Procurement
Construction (EPC), from Dhedrekhola Ch. 30+695 to Lanedanda Ch. 35+316. A
total construction period of 42 months including design period of 6 months is
envisaged for construction of the Tunnel and bridges. Invitations to tender will
be made in August, 2020. For further information http://www.bolpatra.gov.np where
application have to be submitted. Contact Nepali Army, Kathmandu, tel 00 977 1
4267060, email ft-procmgmt@nepalarmy.mil.np.
Visit ttps://bolpatra.gov.np/egp/searchOpportunity.
Ref.n. KTFT/ICB/PQ/TUNNEL/2076/077-2. 16/20.