Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Bosnia and Herzegovina

Bosnia and Herzegovina, Zenica Doboj - ba/12

Motorway

Prequalification notice, deadline 22.06.2009, for construction of 3.1 km-long subsection Gorica-Biljesevo of the 15.4 km-long Drivusa-Kakanj section of Pan European Corridor 5c motorway including 2.95 km-long Vijenac twin tube tunnel. This is known as contract No 2, code 5938-PRE-38716, financed by EBRD loan. Prequalification documents, cost EUR200, from Sanela Kosovac at Federal Traffic Department in Sarajevo, tel +387 33 562-700 and -694, fax -690, e-mail h.sanela@feda.ba. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=1329936-2009 20/09.Invitation for expressions of interest in provision of consulting services for construction supervision of 3.56 km-long full profile motorway including 2.95 km-long, twin-tube Vijenac tunnel. Contract commencement around August, 2009. This is known as lot 2, code FEDA-74-E34-09, financed by EBRD loan. Further information from Sanela Kosovac at Federal Traffic Department in Sarajevo, tel +387 33 562-694 and -700, fax -690, e-mail h.sanela@feda.ba. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=132937-2009 20/09.



Permalink

The Bosnia and Herzegovina public company Autoceste Federacije BIH, the local road network manage, awarded to the consortium IPSA Institute Sarajevo (leader)/IGH Zagreb/TZI Sarajevo the main design for Corridor 5c motorway section Tar?in-Konjic from km 11+050 to km 22+150, lot 2, including 13 tunnels, click here. Contract value EUR3.5 million including VAT. Visit www.jpautoceste.ba. 04/11.



Permalink

Slovenian engineering company Primorje in consortium with the local companies Euroasfalt, ZGP and Hidrogradnja signed a EUR62.08 million contract for the construction of the Gorica-Biljesevo section on the V-c corridor, including the Vijennac tunnel. For project information visit tunnelbuilder archive ba/12 and www.jpautoceste.ba/text.php. 19/11.



Permalink

Open invitation to tender, deadline 27.04.2012, for design and construction of 36.6 km-long section Prnjavor-Doboj of the Banja Luka-Doboj section of Pan European Corridor 5c, 2+2-lane motorway including tunnels and works to 20 km of local roads. Contract code 6602-IFT-41370, financed by EBRD loan. Tender documents, cost EUR500, from Dusan Topic at ARS in Banja Luka, tel +387 51 233-670, fax –700, e-mail dtopic@autoputevirs.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=074243-2012. 10/12.



Permalink

Open invitation to tender expressions of interest, deadline 28.09.2012, for main design of 11 km-long Pocitelj-Zvirovici subsection of the 21.4 km-long Pocitelj-Bijaka section of Pan European Corridor 5c, 2+2-lane motorway including tunnels and works to local roads. Contract code JPAC 347-A62-12, financed by EIB grant. Further information from Adnan Zoranic z.adnan@jpautoceste.ba or Mirza Resic r.mirza@jpautoceste.ba in Sarajevo, tel +387 332779-22, fax –01. Office hours weekdays 09.00-16.00. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262775-2012. 34/12.



Permalink

Prior information notice that bidding for construction of inner secondary lining and completion of all other external works of 2.95 km-long Vijenac twin tube tunnel will commence Q4/2012. This is known as contract code 6962-GPN-38716, financed by EBRD loan. Further information from Mirza Resic in Sarajevo, tel +387 33 277-910, fax –901, e-mail r.mirza@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381148-2012. 48/12.



Permalink

Open invitation to tender, deadline 15.02.2012, for design and construction of 35.3 km-long Banja Luka-Prnjavor section of Banja Luka-Doboj motorway, part of Pan European Corridor 5c 2+2-lane motorway, including tunnels and works to 23.755 km of local roads. Tender no RS/EIB-2012/W, financed by EBRD loan. Tender documents, cost EUR500, from Dusan Topic at ARS in Banja Luka, tel +387 51 233-670, fax –700, e-mail dtopic@autoputevirs.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389183-2012. 50/12.



Permalink

Open invitation to bid, deadline 14.02.2013, for construction of inner secondary lining and completion of all other external works of 2.95 km-long Vijenac twin tube tunnel. This is now known as contract JPAC 365-B48-12, financed by EBRD loan. Contract duration 12 months. Further information from Mirza Resic in Sarajevo, tel +387 33 277-910, fax –901, e-mail r.mirza@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412913-2012. 01/13.



Permalink

General Procurement notices for the Corridor Vc Phase 3 Project. The State of Bosnia and Herzegovina intends using the proceeds of a loan from the EBRD (European Bank for Reconstruction and Development) of EUR 120 million and a loan from the EIB (European Investment Bank) for the
amount of EUR 90 million to finance the construction of priority motorway sections along the international transport Corridor Vc. The Corridor Vc Phase 3 Project, which has a total estimated cost of EUR 235 million, will require the procurement for construction and supervision services of the 2
km Ivan tunnel (Lot 2) on the 16.8 km Tarcin-Ivan subsection, Tarcin-Konjic motorway section and of the 5.1km Poprikuse-Nemila motorway section. Tendering for the above contracts is expected to begin in the second half of 2018. Contact PC Motorways of the Federation of Bosnia and
Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://www.ebrd.com/work-with-us/procurement/p-pn-180511a.html  and
http://www.jpautoceste.ba/wp-content/uploads/2018/05/GPN-Tarcin-Ivan-Poprikuse-Nemila.pdf.
Ref.n. 9088-GPN-49058. 20/18.



Permalink

Invitation for Expressions of Interest, deadline  04.10.2018, for supervision of works on the construction of motorway Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin Ivan, Lot 2 Tunnel Ivan. The contract is expected to start on 18.2.2019 and last about 30 months + 24 months DNP. Further information from https://ecepp.ebrd.com/respond/T53J7Q2676. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369490-2018.

Contract n. JPAC 986-E504-18, Tender n. 7536239. 34/18.



Permalink

Invitation for Expressions of Interest, deadline 04.10.2018, for the consulting services for technical assistance to the PIU  (Project Implementation Unit) of the Public company Motorways of the Federation of Bosnia and Herzegovina Ltd. This is for the project on Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin Ivan, Lot 2 Tunnel Ivan. The contract is expected to start on 24.12.2018 and last about 33 months + 24 months DNP. Further information from https://ecepp.ebrd.com/respond/3828J93F89. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369489-2018.

 Contract n. JPAC 987-E505-18, Tender n. 7536595. 34/18.



Permalink

Invitation for Expressions of Interest, deadline 04.10.2018, for the construction of a new approx. 2.0 km long motorway section including the 1,76 km long twin Ivan tunnel and the 700 m temporary connection with the M17, part of  the project on Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin-Ivan. The contract is expected to start on 18.02.2019 and last about 33 months. Further information from https://ecepp.ebrd.com/respond/64W72892Z8. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369486-2018.

 Tender n. 7535808. 34/18.



Permalink

Invitation for expressions of interest, deadline 16.01.2019, for  a Lender’s Monitoring Advisor (LMA, the Consultant) to assist the EBRD (European Bank for Reconstruction and Development) in monitoring the implementation of the Project (the assignment) involving the construction of the three new sections of Corridor Vc: tunnel Ivan and two motorway sections (Poprikusa - Nemila and Mostar South Interchange - Tunnel Kvanj) 15.8km total length. The EUR 125,000 assignment, excluding VAT, has an estimated overall duration of 36 months. Any clarification question must be submitted by 02.01.2018 to Viv Lewis-Headlam, EBRD, London, email lewishev@ebrd.com. For further information visit http://www.ebrd.com/documents/procurement/tors-76443.docx and https://www.ebrd.com/work-with-us/procurement/pn-76443.html. 01/19.



Permalink

China State Construction Engineering Corporation Ltd from Beijing secured the EUR56.52 million contract, excluding VAT, for construction of motorway on corridor Vc, Lot 1: Interchange Pocitelj – beginning of bridge Pocitelj and end of bridge Pocitelj –interchange Zvirovici (from km 0+000,00 to km 3+425,00 and from 4+404,00 to km 11+075,00). The contract is divided in two sections  and the construction includes the tunnel Pocitelj tunnel (1163 m, right/1192 m, left). Contact Motorways of the Federation of Bosnia & Herzegovina, attn Tarik Durakovia and Sigra Sanela Kosovac, tel

+387 33 277 966-921, fax +387 33 277 901-942, email  +d.tarik@jpautoceste.ba

 e k.sanela@jpautoceste.ba. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=297633-2019.

Ref.n. JPAC 975-B96-18.26/19.



Permalink

IRD Engineering Srl from Rome secured the EUR1.85 million contract,excluding VAT,  for consulting services for supervision of works on the construction of  the motorway on Corridor Vc, section Tarcin-Konjic, subsection Tarcin-Ivan, Ivan tunnel (Lot 2). Duration of the contract is 57 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba. Visit https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=9219971 . Ref.n. 7536239. 44/19.



Permalink

The Joint Venture composed of Civil Engineering institute IG from Banja Luka (leader, BA) and KREBS+KIEFER Eastern Europe GmbH from Darmstadt (DE) secured the EUR687,600 contract, excluding VAT, for the consulting services for technical assistance to the PIU  (Project Implementation Unit) of the Public company Motorways of the Federation of Bosnia and Herzegovina Ltd. This is for the project on Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin Ivan, Lot 2 Tunnel Ivan. Duration of the contract is 57 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit  https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=9219880 .


Contract n. JPAC 987-E505-18, Tender n. 7536595. 44/19.



Permalink

Euro-Asphalt from Sarajevo secured the EUR57.63 million contract, excluding VAT,  for the construction of a new 2.0 km long Tarcin-Konjic motorway section including  the twin tube Ivan tunnel, 1,76 km long, and a temporary 700 m connection with road M17. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba. Visit  http://www.jpautoceste.ba/potpisan-ugovor-o-izgradnji-dionice-tarcin-konjic-poddionica-tarcin-ivan-lot-2-tunel-ivan/


and https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=9710545 .

Ref.n. 7535808. 44/19.



Permalink

Invitation for tender, deadline 24/02/2020, for civil works and consulting services for the motorway section Tunnel Kvanj-Buna from km 9 + 125 to km 14 + 380, including the Kvanj twin tube tunnel: right tube length 2 645 m and left tube, length 2 720 m. The contract includes also the reconstruction of regional Buna – Domanovici road. Duration of the contract is 36 months. Contact Public company Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Lejla Hodzic and Jasmina Olovcic, Sarajevo, tel +387 33 277 922- 966, fax +387 33 277 901, email  h.lejla@jpautoceste.ba and o.jasmina@jpautoceste.ba. For tender documents please click here Contract Ref. n. JPAC 1133-B110-19. 02/20.



Permalink


Technital SpA from Verona secured the EUR 699,380 contract, excluding VAT, for technical Assistance to the Project Implementation Unit (PIU)  for Projects on the Corridor Vc Motorway: Tunnel Kvanj-Buna and Tarcn -Entrance to Tunnel Ivan. Contact Public company Motorways of the Federation of Bosnia and Herzegovina Ltd, Monstar, tel +387 36512300, fax +387 36512301, email   info@jpautoceste.ba. For tender documents please click here Contract Ref. n. JPAC 1079-E566-19. 21/21. 

 




Permalink


The procurement procedure for civil works and consulting services for the motorway section Tunnel Kvanj-Buna from km 9 + 125 to km 14 + 380, including the Kvanj twin tube tunnel was annulled by the Procuring Entity due to long passage of time since the invitation to tender. Contact Public company Motorways of the Federation of Bosnia and Herzegovina Ltd, Mostar, tel +387 36512300, fax +387 36512301, email  info@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=191012-2022.  Ref. n. JPAC 1133-B110-19. 15/22.



Permalink


Restricted invitation to tender, deadline 10/10/2022, for the construction of motorway on Corridor Vc, 5.25km section tunnel Kvanj-Buna, including the Kvanj tunnel (2645 m, 2720 m), Viaduct Rotimski potok and overpass Rujevice. Value of the contract is EUR150 million, excluding VAT. Duration of the contract is 24 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Lejla Hodzic,  Sarajevo, tel +387 33277922, fax +387 33277901, email h.lejla@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=433582-2022. Ref. n. EIB-GtP/20150773-05. 36/22. 



Permalink


The restricted invitation to tender, deadline 10/10/2022, for the construction of motorway on Corridor Vc, 5.25km section tunnel Kvanj-Buna, including the Kvanj tunnel (2645 m, 2720 m), Viaduct Rotimski potok and overpass Rujevice has been discontinued. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, Mostar,  tel +387 36512300, fax +387 36512301, email  info@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=793536-2023. Ref. n. EIB-GtP/20150773-05. 02/24. 



Permalink


Restricted invitation to tender, deadline 02/04/2024, for the construction of motorway on Corridor Vc, 5.25km section tunnel Kvanj-Buna, including the Kvanj tunnel (2645 m, 2720 m), Viaduct Rotimski potok and overpass Rujevice. Value of the contract is EUR150 million, excluding VAT. Duration of the contract is 30 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Nemanja Kulina,  Sarajevo, tel +387 033277971, fax +387 033277901, email k.nemanja@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=031851-2024. Ref. n. EIB-GtP/20150773-08. 04/24. 



Permalink