Sri Lanka

Sri Lanka, Aragon - lk/156

Road

Closing Date: 13.03.2019 (Tender Closed)

Postponed from 06.03.2019 to 13.03.2019 the deadline of the open invitation to tender for the refurbishment, maintenance and operation of 3.07 km-long Bielsa-Aragnouet tunnel on A138 and its access roads from 2019 to 2022. Estimated contract value EUR6.79 million, excluding VAT, duration 36 months. For bid documents  https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=SFKzcov8m3Uuf4aBO%2BvQlQ%3D%3D.

Contact Consorcio para la gestion, Conservacion y Explotacion del Tunel de Bielsa-Aragnouet y sus Accesos, Parzan, email mlorenzo@bielsa-aragnouet.org. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=072734-2019.

Ref.n. (A02010378)-A1/2019. 07/19.



Permalink

Sri Lanka, Central Province - lk/15

Hydropower

The contract for the main civil works (lot 2) for the second phase of Upper Kotmale hydro power project that amounts to Rs10.7 billion was signed between the Ceylon Electricity Board and Maeda of Japan. The contract will cover the construction of a 35.5 m-high dam at Talawakelle Town, and underground works including a 12,890 m-long headrace tunnel; circular shape, 4.5 m-5.2 m in diameter; a 98 m-high 12 m-diameter upstream surge tank; a 791 m-long underground inclined penstock shaft, 4.5 m-1.45 m in diameter; a 78 m-long draft tunnel, 3 m in diameter; a 58 m-high downstream surge chamber, 8 m in diameter; a 459 m-long tailrace tunnel, 4.5 m in diameter; a 18.8 m-wide, 36.5 m-high and 66.3 m-long underground powerhouse complex; a 451 m-long access tunnel, 5 m wide and 5. m high; a 469 m-long cable tunnel, 4 m wide and 3 m high. Construction of the second phase will be inaugurated by President Mahinda Rajapaksa in January next year. When commissioned, the Upper Kotmale hydro power plant will add 150 MW to the national grid. The total cost is being funded by the Japanese Bank for International Cooperation (JBIC). The project is expected to be completed by 2010. Read E-News Weely 27/2005. Visit www.ukhp.lk and and www.maeda.co.jp 51-52/06.



Permalink

Sri Lanka, Moragahakanda - lk/14

Irrigation

Lahmeyer International to prepare feasibility study for multipurpose water resources development scheme in north-central Sri Lanka to include 1,050 m-wide dam, 60 m high on Amban Ganga tributary which will provide increased water supplies and may also drive a 10 MW power station. Visit www.lif.de for more details. May 2000.



Permalink

Sri Lanka, Baduraliya - lk/13

Kukule Ganga Hydro

$200 million job for Ceylon Electricity Board funded mainly by Japan OECF soft loan and involving an underground power station with 5 km-long, 5 m-diameter headrace tunnel presently under construction by contractor SIEC. Consortium of Kajima Kumagai and Hazama is building the dam. February 2000.



Permalink

Sri Lanka, Colombo - lk/12

Pipejack Flood Control

2.8 m internal diameter outfall for Sri Lanka Land Reclamation and Development Corporation as part of Greater Colombo flood control scheme. December 1999.



Permalink

Sri Lanka, Colombo - lk/11

Hydro

80 MW station with two Francis turbines in 50 m-long cavern. 7 km-long pressure tunnel. Six year project for Electricity Board. Finance from Overseas Economic Corporation Fund in Tokyo. April 1998.



Permalink

Swaziland

Swaziland, Lubombo District - sz/11

Irrigation

The Swaziland Water and Agricultural Development Entreprise (SWADE) signed a EUR22 million contract agreement with CMC of Italy, the company that will construct a 21.4 km feeder canal under the LUSIP (Lower Usuthu Smallholder Irrigation Project). The scheme, which is financed by the Arab Bank for Economic Development in Africa (BADEA) and the Swaziland government, includes a 1.2 km-long 3.3 m-diameter tunnel, partly lined with reinforced concrete. Work is planned to last 30 months. Visit www.cmc.coop and swade.co.sz 29/06.



Permalink

Sweden

Sweden, Orebro County - se/100

Railway

Closing Date: 21.04.2025 (Tender Closed)

Competitive procedure with negotiation, deadline 21/04/2025, for inspection organization for the contracts within the Hallsberg–Degeron phase, including a major civil works contract for earthworks, bridges, and a tunnel, a contract concerning the BEST systems (Track, Power, Signaling, Telecommunications), and two contracts for railway switch installations. Click here for bid documents. Duration of the contract is from 01/09/2025 to 01/09/2026. Value of contract EUR 900,843.01 (SEK10 million), excluding VAT. Contact Trafikverket Myndighet, Borlange, attn Johan Sundin, tel +46 73-701 55 76, email johan.sundin@trafikverket.se. Visit https://ted.europa.eu/en/notice/-/detail/218768-2025, GU S 067. Rif.n. KOM-417554. 15/25. 



Permalink

Competitive procedure with negotiation, deadline 01/04/2024, for the construction of the new 14 km railway section between Hallsberg and Stenkumla, including 12 bridges and a 2.4 km long bi-tube single track tunnel. For bid documents, please click here. Duration of contract from 01/01/2025 to 30/06/2030. Value of contract EUR270.25 million (SEK3 bn), excluding VAT. Contact Trafikverket Myndighet, Borlange, attn Johan Sundin, tel +46 73-701 55 76, email johan.sundin@trafikverket.se. Visit https://ted.europa.eu/en/notice/-/detail/80151-2024. Rif.n. KOM-409030. 06/24. 



Permalink

Infrakraft Sverige AB from Karlstand secured the EUR247.61 million (SEK2.75 bn) contract, excluding VAT, for the construction of the new 14 km railway section between Hallsberg and Stenkumla, including 12 bridges and a 2.4 km long bi-tube single track tunnel. Contact Trafikverket Myndighet, Borlange, attn Johan Sundin, tel +46 73-701 55 76, email johan.sundin@trafikverket.se. Visit https://ted.europa.eu/en/notice/-/detail/85011-2025. Rif.n. KOM-409030. 06/25. 



Permalink

Sweden, Scania County - se/99

Railway


WSP Sverige AB from Stockholm-Globen secured EUR7.78 million (SEK90 million) contract, excluding VAT, for the preparation of consultation documents and consultation documents, for the selection of Maria-Helsingborg double track extension location alternatives  in Helsingborg Municipality. : The stretch between Maria station and Helsingborg C is a 4.5km long single-track railway that goes through a tunnel. In the early 1990s, it was decided that the West Coast Railway's long-term standard should be double-track. When Angelholm-Maria and Varbergstunnel are completed, only the Maria-Helsingborg section does not meet this requirement. Contact Trafikverket Myndighet,  attn Malin Isaksson, Borlange, tel +46-70-724 52 48, email  malin.isaksson@trafikverket.se. Visit https://ted.europa.eu/en/notice/-/detail/697499-2024. Ref.n. KOM-413177. 46/24.



Permalink

Sweden, Halland &Vastra Goetaland counties - se/98

Road

Closing Date: 17.04.2023 (Tender Closed)


Open invitation to tender, deadline 17/04/2023, for a consultant supporting experts on road tunnels safety, region West. Click here for tender documents and where tenders must be sent. Value of the contract is EUR446,443.07 (SEK5.2 million), excluding VAT. Duration of the contract is from 01/09/2023 to 31/08/2028. Contact Trafikverket Myndighet, attn Anna Dansund, Borlange, email anna.dansund@trafikverket.se. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=166005-2023. Ref.n. KOM-412499. 12/23. 




Permalink


TREJO Consulting AB from Goteborg secured the contract for expert support for road tunnel safety in the west of Sweden. Contact Trafikverket Myndighet, attn Anna Dansund, Borlange, email anna.dansund@trafikverket.se. Visit https://upphandling.trafikverket.se/Notice/AwardNotice/NoticeDetails.aspx?ProcurementId=8270. Ref.n. KOM-412499. 46/23. 



Permalink