Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Philippines

Philippines, Manila - ph/11

Metro

Proposed 250 km scheme with 80 stations under review for possible BOT concession with JK International. Five stages of building, with first stage connecting Aquino International airport with North Fairview in Quezon City taking six/seven years. March 1998.Manila Department of Transportation and Communications has signed memorandum of understanding with Italian contractors Fincosit and SELI for a 10 km tunnel from Fort Bonifacio to Greenhills to be operational by 2004. Engineering studies are complete, and $700 million finance is being arranged. Legislation for land use for the tunnel is under discussion with the Metro Manila Development Authority. December 2000.



Permalink


Philippines’ Department of Transportation (DOTr) awarded to Mitsubishi Corporation (MC) the EUR1.10 bn (YEN140 bn) contract to deliver the integrated railway systems and trackwork for the Metro Manila Subway stretch extending from East Valenzuela Station in northern Manila to Terminal 3 station, which is connected to Ninoy-Aquino International Airport Terminal 3 in the south of the capital city and to Bicutan Station. The completion of the project is estimated for 2028. The subway is expected to make this journey more than an hour quicker than it currently takes by car. MC is responsible for designing, manufacturing, installing and delivering of all the systems for what will be the Philippines’ first subway line between the northern city of Valenzuela and the southern city of Parañaque. Visit https://www.mitsubishicorp.com. 07/22. 

 



Permalink


The consortium between Colas Rail (76%, leader), Thales (16%) and Egis (8%) has been awarded a EUR1billion subcontract by Mitsubishi Corporation (MC) to design and build E&M systems and trackworks for the 35-km long Metro Manila Subway Project (MMSP), entirely underground with 15 stations, linking East Valenzuela in northern Manila to Terminal 3 of Ninoy-Aquino International Airport in the south of the capital city. Visit https://www.colas.com, https://www.thalesgroup.com and https://www.egis-group.com.  10/22. 



Permalink


During a ceremony in Manila on 05/05/2022 the Department of Transportation (DOTr) officially awarded to the TTM Joint Venture, composed of Tokyu Construction Co Ltd (Japan), Tobishima Corporation (Japan) and Megawide Construction Corporation (Philippine-based) the PHP17.75 bn (EUR 321,23 million/USD340 million) Contract Package 104 (CP104) as part of the Metro Manila Subway Project (MMSP) Phase1. The contract involves the construction of two underground stations and tunnels at Ortigas North and South. Construction will start work in July with the completion date set for January 2028.

The network will span 17 stations over 27.5 km, connecting the northern part of the metropolitan area to Ninoy Aquino International Airport. This subway will reduce travel time between Quezon City and the Ninoy Aquino International Airport (NAIA) from 70 minutes to only 35 minutes, and revitalize the Philippine economy by easing traffic congestion in Metro Manila.

Tokyu's contract will apply to the roughly 3.4 km remaining for the first phase of the project. The joint venture will handle engineering work, tunnel construction and equipment installation, including that of an air conditioning and ventilation system.

To date, the Japanese Government, through the Japan International Cooperation Agency (JICA), has provided assistance amounting to YEN104 bn (EUR 768,35 million or USD 812.55 million) in the 1st part and YEN253bn (EUR1.87 bn or USD1.98 bn) in the 2nd part.

Visit https://www.pna.gov.ph and https://www.ph.emb-japan.go.jp. 20/22. 



Permalink

Poland

Poland, Subcarpathian - pl/33

Expressway


The consortium Gulermak SA (leader)/ Budimex SA from Warsaw secured  the EUR455.69 million (PLN1.91 bn) contract, excluding VAT, for the design and construction of the 5.25 km Jawornik - Lutcza section of the S19 expressway. The section includes the T-2 road tunnel (a 3km bitube tunnel). Contact  GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Rzeszow, tel +48 17 853-40-71, email sekretariatrzeszow@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/718670-2024. Ref.n. O.RZ.D-3.2410.5.2022. 48/24.



Permalink


The consortium INKO Consulting Sp. z o.o. (leader)/ MP Consulting Sp. z o.o. from Krakow secured  the EUR 6.67 million (PLN27.97 million) contract, excluding VAT, for supervision during design and construction of the S19 expressway on the 5.25 km Jawornik - Lutcza section, including the T-2 road tunnel (a 3km bitube tunnel). Contact  GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Rzeszow, tel +48 17 853-40-71, email sekretariatrzeszow@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/790932-2024. Ref.n. O/RZ.D-3.2410.7.2022. 52/24.



Permalink

Poland, West Pomeranian - pl/32

Highway

Closing Date: 04.02.2022 (Tender Closed)


Open invitation to tender, deadline 04/02/2022, for the preparation of design documentation for the construction of the S6 highway - Szczecin Western Bypass divided into two lots:

• Lot 1: Section 1 Kołbaskowo - Dołuje from km 1+900 to km 15+484.04 and section 2 - Dołuje - Police from km 15+484.04 to km 27+400.00, Będargowo intersection;

• Lot 2: Section 3 -Police - Goleniow from km 27+400.00 to km 50+810.20, including a double-tube tunnel.

For bid documents click here. Value of contract EUR10.42 million (PLN44.51 million), excluding VAT. Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), attn Iwona Gabska, Szczecin, tel +48 914325320, email igabska@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/38954-2022https://ted.europa.eu/en/notice/-/detail/24867-2022 and https://ted.europa.eu/en/notice/-/detail/641063-2021. Ref.n. O.Sz.D-3.2413.51.2021. 04/22.



Permalink


Awarded the contracts for the preparation of design documentation for the construction of the S6 highway - Szczecin Western Bypass divided into two lots:
  • Consortium DATABOUT Sp. z o.o. – Lider - TPF Sp. z o.o. from Warsaw secured the EUR2.84 million contract (PLN12.15 million), excluding VAT, for Lot 1: Section 1 Kołbaskowo - Dołuje from km 1+900 to km 15+484.04 and section 2 - Dołuje - Police from km 15+484.04 to km 27+400.00, Będargowo intersection;
• Voessing Polska Sp. z o.o. from Bydgoszcz secured the EUR7.57 milion contract (PLN32.36 million), excluding VAT, for Lot 2: Section 3 -Police - Goleniow from km 27+400.00 to km 50+810.20, including a double-tube tunnel. Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), attn Iwona Gabska, Szczecin, tel +48 914325320, email igabska@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/678372-2022. Ref.n. O.Sz.D-3.2413.51.2021. 49/22.



Permalink


Open invitation to tender, deadline 01/04/2025, for the technical design, the executive design and the construction of the S6 Western road bypass of Szczecin - Section 3 Police - Goleniow (from km 27+403 to km 50+810.20), including a bi-tube tunnel. Click here for bid documents and where tenders must be sent. Contact GDDKiA (Generalna Dyrekcja Drog Krajowych i Autostrad), attn Iwona Gabska, Szczecin, tel +48 914325320, email igabska@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/777782-2024. Ref.n. OSz.D-3.2410.11.2024. 51/24.



Permalink

Postponed to 09/05/2025 the deadline of the open invitation to tender for the technical design, the executive design and the construction of the S6 Western road bypass of Szczecin - Section 3 Police - Goleniow (from km 27+403 to km 50+810.20), including a bi-tube tunnel. Click here for bid documents and where tenders must be sent. Contact GDDKiA (Generalna Dyrekcja Drog Krajowych i Autostrad), attn Iwona Gabska, Szczecin, tel +48 914325320, email igabska@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/202427-2025. Ref.n. OSz.D-3.2410.11.2024. 14/25 



Permalink


Postponed to 30/05/2025 the deadline of the open invitation to tender for the technical design, the executive design and the construction of the S6 Western road bypass of Szczecin - Section 3 Police - Goleniow (from km 27+403 to km 50+810.20), including a bi-tube tunnel. Click here for bid/tender documents and where tenders must be sent. Contact GDDKiA (Generalna Dyrekcja Drog Krajowych i Autostrad), attn Iwona Gabska, Szczecin, tel +48 914325320, email igabska@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/312010-2025 and https://ted.europa.eu/en/notice/-/detail/279789-2025. Ref.n. OSz.D-3.2410.11.2024. 21/25.



Permalink

Poland, Lesser Poland - pl/31

Expressway


Voltar System Sp. z o.o. from Tychy and Wasko S.A. from Gliwice secured the 6 months contract for maintenance of safety systems and tunnel service devices along the national road S7 Myslenice - Rabka Zdroj near Lubon Mały, together with the associated infrastructure and service of the Tunnel Management Center at the Expressway Maintenance District Skomielna Biała. The section includes the 2058 m Maria and Lech Kaczynski tunnel. Contact Generalna Dyrekcja Drog Krajowych i Autostrad, Krakow, tel +48124172500 48124172179, fax +48124110118, email sekretariat_krakow@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/563741-2024. Ref.n. O.KR.D-3.2421.25.2024. 40/24.



Permalink


Open invitation to tender, deadline 27/11/2024, for the maintenance of safety systems and tunnel operation devices in Naprawa under Lubon Mały along the national road S7 Naprawa - Skomielna Biała, together with the associated infrastructure and service of the Tunnel Management Center Click here for bid/tender documents and where tenders must be sent. Duration of contract will be 36 months. Contact Generalna Dyrekcja Drog Krajowych i Autostrad, Krakow, tel +48124172500 48124172179, fax +48124110118, email sekretariat_krakow@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/681444-2024https://ted.europa.eu/en/notice/-/detail/657488-2024https://ted.europa.eu/en/notice/-/detail/607370-2024 and https://ted.europa.eu/en/notice/-/detail/550887-2024. Ref.n. O.KR.D-3.2421.23.2024. 45/24.



Permalink


WASKO S.A from Gliwice have secured the EUR 3.92 million (PLN16.77 million) contract, excluding VAT, for the maintenance of safety systems and tunnel operation devices in Naprawa under Lubon Mały along the national road S7 Naprawa - Skomielna Biała, together with the associated infrastructure and services, for the Tunnel Management Center. Contact Generalna Dyrekcja Drog Krajowych i Autostrad, Krakow, tel +48124172500-48124172179, fax +48124110118, email sekretariat_krakow@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/485438-2025. Ref.n. O.KR.D-3.2421.23.2024. 31/25.



Permalink

Poland, Lesser Poland - pl/30

Railway

The consortium composed of Budimex SA (leader), Gulermak Agir Sanayi Insaat ve Taahhut AS (partner) and Gulermak Sp. z o.o. (partner) have secured the EUR 447,28 million (PLN1.93 bn) contract, excluding VAT, for the demolition, reconstruction, widening and construction of section D from km 48+600 to km 61+220 and for technical infrastructure in the section from km 48+600 to km 61+581 as part of the project to modernise railway line n. 104 Chabowka - Nowy Sacz. The contract includes construction of two tunnels totalling 7.5 km: the main tunnel - external diameter 10.6 m - will be excavated by TBM. 

Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 22 47 32 464, fax +48 22 47 32 399, email katarzyna.mikulska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/181766-2024. 16/24. 



Permalink


Open invitation to tender, deadline 15/10/2024, for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/530403-2024https://www.podleze-piekielko.pl and https://www.gov.pl/.  Ref.n. 9090/IRZR1/14771/03784/24/P. 36/24.

 




Permalink

Postponed to 21/10/2024 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/586552-2024 and https://ted.europa.eu/en/notice/-/detail/530403-2024.  Ref.n. 9090/IRZR1/14771/03784/24/P. 40/24.



Permalink


Postponed to 16/12/2024 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/734659-2024https://ted.europa.eu/en/notice/-/detail/710587-2024https://ted.europa.eu/en/notice/-/detail/695603-2024https://ted.europa.eu/en/notice/-/detail/663863-2024 and https://ted.europa.eu/en/notice/-/detail/622275-2024. Ref.n. 9090/IRZR1/14771/03784/24/P. 49/24.



Permalink


Postponed to 05/03/2025 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/81036-2025, https://ted.europa.eu/en/notice/-/detail/18036-2025, and https://ted.europa.eu/en/notice/-/detail/756630-2024. Ref.n. 9090/IRZR1/14771/03784/24/P. 06/25.



Permalink

Postponed to 15/04/2025 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/201151-2025https://ted.europa.eu/en/notice/-/detail/165432-2025, and https://ted.europa.eu/en/notice/-/detail/132875-2025. Ref.n. 9090/IRZR1/14771/03784/24/P. 14/25. 



Permalink

Open invitation to tender, deadline 23/04/2025, for the design and construction works of the C1 Tymbark -Limanowa section on the railway line n. 104, part of project including the new railway line n.622 Podleze - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabowka - Nowy Sacz - Stage II. In total 14 km of new tracks will be built with a new 2 km tunnel between Tymbark and Koszary. Click here for bid/tender documents and where tenders must be sent. Duration of contract 44 months. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 224732488, email agata.biskupska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/186055-2025 and https://ted.europa.eu/en/notice/-/detail/104726-2025https://www.podleze-piekielko.pl. Ref.n. 090/IRZR1/00635/00375/25/P. 16/25. 



Permalink

Open invitation to tender, deadline 14/05/2025, for supervision during the construction of C1 Limanowa -Tymbark section on the railway line n. 104 and of section H Szczyrzyc - Tymbark on railway line n. 622, part of including the new railway line n.622 Podleze - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabowka - Nowy Sacz - Stage II. Click here for bid/tender documents and where tenders must be sent. Duration of contract 57 months. Contact PKP Polskie Linie Kolejowe SA, attn Justyna Leczkowska, Warsaw, tel +48 224733029, fax +48 224732399, email justyna.leczkowska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/226736-2025 and https://www.podleze-piekielko.pl. Ref.n. 9090/IRZU/01587/01276/25/P. 16/25. 



Permalink

Postponed to 24/04/2025 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/227884-2025. Ref.n. 9090/IRZR1/14771/03784/24/P. 16/25. 



Permalink


Postponed to 30/05/2025 the deadline of the open invitation to tender for the design and construction works of the C1 Tymbark -Limanowa section on the railway line n. 104, part of project including the new railway line n.622 Podleze - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabowka - Nowy Sacz - Stage II. In total 14 km of new tracks will be built with a new 2 km tunnel between Tymbark and Koszary. Click here for bid/tender documents and where tenders must be sent. Duration of contract 44 months. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 224732488, email agata.biskupska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/286728-2025 and https://ted.europa.eu/en/notice/-/detail/251558-2025. Ref.n. 090/IRZR1/00635/00375/25/P. 19/25.



Permalink

Poland, Masovia - pl/29

Expressway


Open invitation to tender, deadline 06/12/2023 for the design of the new 12.9 km S7 expressway section between Kiełpin and the Armii Krajowej Route (S8) in Warsaw. The new route - the northern exit and entry to Warsaw - will have a dual carriageway with three lanes. Two tunnels will be designed in Bielany (approx. 1,000 m) and Bemowo (approx. 1,100 m) and four junctions: Łomianki, Warszawa Wólka Węglowa, Warszawa Chomiczówka, Warszawa Północ (connection with the Armii Krajowej Route S8). Click here for tender/bid documents and where tenders must be sent. Value of contract EUR 10 million, excluding VAT. Duration of contract 41 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=716068-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=687771-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=632326-2023. Ref.n. O/WA.D-3.2411.33.2023. 48/23. 

 




Permalink


Open invitation to tender, deadline 06/12/2023 for the design of the new 12.9 km S7 expressway section between Kiełpin and the Armii Krajowej Route (S8) in Warsaw. The new route - the northern exit and entry to Warsaw - will have a dual carriageway with three lanes. Two tunnels will be designed in Bielany (approx. 1,000 m) and Bemowo (approx. 1,100 m) and four junctions: Łomianki, Warszawa Wólka Węglowa, Warszawa Chomiczówka, Warszawa Północ (connection with the Armii Krajowej Route S8). Click here for tender/bid documents and where tenders must be sent. Value of contract EUR 10 million, excluding VAT. Duration of contract 41 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=716068-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=687771-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=632326-2023. Ref.n. O/WA.D-3.2411.33.2023. 48/23. 




Permalink


Transprojekt Gdanski Społka from Gdansk secured the EUR 12.72 million (PLN54.24 million) contract, excluding VAT, for the design of the new 12.9 km S7 expressway section between Kiełpin and the Armii Krajowej Route (S8) in Warsaw. The new route - the northern exit and entry to Warsaw - will have a dual carriageway with three lanes, including two tunnels in Bielany (approx. 1,000 m) and Bemowo (approx. 1,100 m) and four junctions: Łomianki, Warszawa Wólka Węglowa, Warszawa Chomiczówka, Warszawa Północ (connection with the Armii Krajowej Route S8). Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Warsaw, tel +48 222092391, email mbakula@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/665949-2024. Ref.n. O/WA.D-3.2411.33.2023. 49/24.



Permalink


Open invitation to tender, deadline 14/01/2025, for scientific and technical supervision with elements of investor control for the project involving the construction of the S7 expressway between Kiełpin and Trasa Armii Krajowej in Warsaw, including two tunnels, under Bielany (1000 m) and under Bemowo (1100 m). Click here for tender/bid documents and where tenders must be sent. Duration of contract 48 months. Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Warsaw, tel +48 222092391, email mbogusz@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/744243-2024. Ref.n. O/WA.D-3.2411.24.2024. 49/24.



Permalink


Postponed to 07/02/2025 the deadline of the open invitation to tender for scientific and technical supervision with elements of investor control for the project involving the construction of the S7 expressway between Kiełpin and Trasa Armii Krajowej in Warsaw, including two tunnels, under Bielany (1000 m) and under Bemowo (1100 m). Click here for tender/bid documents and where tenders must be sent. Duration of contract 48 months. Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Warsaw, tel +48 222092391, email mbogusz@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/48056-2025https://ted.europa.eu/en/notice/-/detail/43605-2025 and https://ted.europa.eu/en/notice/-/detail/14227-2025. Ref.n. O/WA.D-3.2411.24.2024. 04/25.



Permalink

Poland, Subcarpathia - pl/28

Expressway

Closing Date: 17.12.2019 (Tender Closed)


Open invitation to tender, deadline 17/12/2019, for the design and construction of the 10.3km section from the Rzeszow Południe junction (not included) to the Babica junction (included) of the S19 expressway, including a 2 km tunnel. Click here for tender documents and where tenders must be sent.Contact Gddkia, attn Agnieszka Sroczyk, Rzeszow, tel +48 178534071, fax +48 178536484, email sekretariat_rzeszow@gddkia.gov.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 463439-2019. Ref.n. O.RZ.D-3.2410.1.2019. 40/19. 

 




Permalink

Poland, Pomerania - pl/27

Road

The consortium consisting of Porr, Gulermak and Energopol-Szczecin signed the EUR150.31million contract for the design and construction of the Świnoujście tunnel . Once the tunnel is completed in the autumn of 2022 it will provide a direct connection between Uznam and the Polish mainland.

The total length of the project is approximately 3.2 km. This includes a 1.44 km TBM-excavation using the slurry shield procedure. The breakout diameter of the tunnel will be 13.5 m. A two-way roadway will be constructed with traffic lanes with a width of 3.5 m and evacuation niches will be built using ground freezing. Visit https://porr-group.com/en/press/press-release/news/porr-konsortium-baut-tunnel-in-swinemuende-1/. 38/18.




Permalink

Astaldi Group (99,9%) and Ghella (0,01%) have been awarded the EUR 139 million contract for the construction design and building by TBM of  a 1.5 km tunnel, under the River  to link road to the islands of Uznam and Wolin to Swinoujscie. The contract includes the construction of a 860 m cut-and-cover tunnel, the installation of all E&M systems and related works. The works will be financed using European Union and state funding for the Municipality of Swinoujscie. The planned duration of works is 48 months. Visit http://www.astaldi.com/en/press-releases/astaldi-new-construction-orders-eur-243-million.

25/18.




Permalink

SWS has been awarded the €150 million contract for the final and detailed design of the road tunnel under the Swina river between the islands of Uznam and Wolin in Swinoujscie (Poland), near the German border, this is a project co-funded by the EU. SWS's client is the Consortium composed of Porr, Gulermak and Energopol-Szczecin. The contract will be implemented as a Design & Build. The 1.44 km tunnel will be excavated with a 13.5 m diameter Slurry TBM. All activities will be carried out in a BIM environment. For further information please visit http://www.swsglobal.com/2018/11/19/sws-awards-a-new-contract/ . 47/18.




Permalink


Open invitation to tender, deadline 23/02/2023, for the design, delivery, assembly, installation and servicing of a stationary device recording the average speed in the tunnel under Swina river in Swinoujscie on the DK 93 road. Click here for bid/tender documents and where tenders must be sent. Duration of contract is 182 days. Contact Gmina Miasto Swinoujscie, attn Ewa Bimkiewicz, Swinoujscie, tel +48 913212425 , email bzp@um.swinoujscie.pl. Visit https://ted.europa.eu/en/notice/-/detail/44564-2023. Ref.n. BZP.271.1.46.2022. 04/23.




Permalink

Sprint SA from Olsztyn has been awarded the EUR240,925 (PLN1.05 million) contract, excluding VAT, for the design, delivery, assembly, installation and servicing of a stationary device recording the average speed in the tunnel under Swina river in Swinoujscie on the DK 93 road. Contact Gmina Miasto Swinoujscie, attn Ewa Bimkiewicz, Swinoujscie, tel +48 913212425 , email bzp@um.swinoujscie.pl. Visit https://ted.europa.eu/en/notice/-/detail/46749-2024. Ref.n. BZP.271.1.46.2022. 04/24.






Permalink

Open invitation to tender, deadline 25/04/2025, for the maintenance of devices in the tunnel under the Martwa Wisła River in Gdansk. Click here for bid documents and here where tenders must be sent. Duration of contract 24 months. Contact Gdanski Zarząd Drog i Zieleni, Gdansk, tel +48 (58) 52446625, email gzdiz-przetargi@gdansk.gda.pl. Visit https://ted.europa.eu/en/notice/-/detail/189288-2025. Ref.n. 16/B/IN/2025. 13/25. 



Permalink

TBM SERWIS Sp. z o.o. from Gdansk secured the EUR1.40 million (PLN5.97 million) contract, excluding VAT, for the maintenance of devices in the tunnel under the Martwa Wisła River in Gdansk. Contact Gdanski Zarząd Drog i Zieleni, Gdansk, tel +48 (58) 52446625, email gzdiz@gdansk.gda.pl. Visit https://ted.europa.eu/en/notice/-/detail/571877-2025. Ref.n. 16/B/IN/2025. 36/25.



Permalink

Poland, Lublin - pl/26

Coal mine

Closing Date: 13.11.2014 (Tender Closed)

Open invitation to tender, deadline 13.11.2014, for supply of tunnelling machinery to be used in the underground Stefanow coal mine, in explosive methane and coal dust. Contract duration 140 days from award. Time limit for receipt of requests for documents or for accessing documents: 12.11.2014. Contact Lubelski Węgiel Bogdanka S.A., att.n Ryszard Metelski, Puchaczow, tel +48 814625547, fax +48 814625007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339720-2014. Ref.n. 72/IZS/2014. 41/14.



Permalink


The joint ventire between Hydrotech S.A.  and Deilmann-Haniel Mining Systems GmbH secured the EUR 1.63 million contract, excluding VAT, for the supply of tunnelling machinery to deal with explosive methane and coal dust which will be used underground in the Stefanow coal mine,  in. Contact Lubelski Węgiel Bogdanka S.A., att.n Paweł Fryt Puchaczow, tel +48 814625125, fax +48 814625007, e-mail pfryt@lw.com.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380406-2015. Ref.n. 72/IZS/2014. 44/15.




Permalink

Poland, Lesser Poland - pl/25

Railway

Closing Date: 07.10.2013 (Tender Closed)

Open invitation to tender, deadline 07.10.2013, for maintenance and inspection of equipment, systems automation and lighting in the railway tunnel Krakowskiego Szybkiego Tramwaju (1,420 m) in Krakow. Contact Zarząd Infrastruktury Komunalnej i Transportu w Krakowie, att.n Leszek Wesołowski, Krakow, tel +48 126167416, fax +48 126167417, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288896-2013 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291654-2013. 36/13.



Permalink

Open invitation to tender, deadline 24.09.2014, for maintenance and inspection of the service equipment and plant automation systems in the 1,420 m-long Krakow fast tram tunnel. Value of contract EUR207,000, duration 01.11.2014 to 31.12.2015. Contact Zarząd Infrastruktury Komunalnej i Transportu w Krakowie, att.n Leszek Wesołowski, Krakow, tel +48 126168614, fax +48 126167416, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282918-2014. 34/14.



Permalink

Open invitation to tender, deadline 14.05.2015, for maintenance and reparation of security and SCADA systems in the 1,420 m-long Krakow fast tram tunnel. Value of contract EUR207,000, duration 36 months from award. Contact ZIKIT (Zarząd Infrastruktury Komunalnej i Transportu w Krakowie), Krakow, tel +48 126167416, fax +48 126167417, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=122155-2015. 15/15.



Permalink

Additional information about open invitation to tender, deadline 14.05.2015, for maintenance and reparation of security and SCADA systems in the 1,420 m-long Krakow fast tram tunnel. Value of contract EUR207,000, duration 36 months from award. Contact ZIKIT (Zarzad Infrastruktury Komunalnej i Transportu w Krakowie), Krakow, tel +48 126167416, fax +48 126167417, e-mail sekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129104-2015. 18/15.



Permalink

Siemens at Krakow secured the EUR 704,627.13 contract, including 23% VAT, for maintenance of the security and SCADA systems in the 1,420 m-long Krakow fast tram tunnel. Contact ZIKIT (Zarząd Infrastruktury Komunalnej i Transportu w Krakowie), Krakow, tel +48 126167416, fax +48 126167417, e-mailsekretariat@zikit.krakow.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=376304-2015. Ref.n. 19/III/2015. 44/15.




Permalink