Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

United States

United States, Washington D.C. - us/68

Metro

New Blue Line including eleven stations proposed to run from Arlington County, under the Potomac River and through the center of the District to Robert F. Kennedy Memorial Stadium. Cost estimated at $6.3 billion. 46/01. A jv of The Lane Construction Corp., Slattery Skanska, and Granite Construction has been contracted to design and construct the 5 km Largo extension of the Blue Line Metrorail, for US$218 million. The customer is the Washington Metropolitan Area Transit Authority (WMATA). The double-track line, from the existing Addison Road Station to Largo Town Center in Prince George's County, Maryland, east of Washington, D.C., will feature construction of a double box cut-and-cover tunnel through wooded areas and several street crossings. Opening to traffic in 2005. Visit www.largotowncenter.com and www.wmata.com 12/02.Design-build contract awarded to Jacobs Engineering for the 5 km extension of the Blue Line from the existing Addison Road Station to Largo Town Center. Includes 3.2 km of cut-and-cover route. Scheduled to open for service by 2004. Visit www.largotowncenter.com and www.jacobs.com 21/02.



Permalink