Joint venture Shea/Kenny has been awarded the EUR38 million contract to construct the 915 m-long x 5.2 m-diameter Underwood Creek diversion tunnel. The tunnel will hold 1,400 million litres of floodwater for controlled discharge into the Menomonee River. More from Dutch Vleigenthart, VP, at J F Shea, tel +1 909 594-9500. Just EUR216,000 separated Shea/Kenny from second bidder. Contact Milwaukee Metropolitan Sewerage District, tel +1 414 272-5100 or visit www.mmsd.com. 52/08.