Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Valencia - es/69

Motorway

Proposed 4.6 km twin-tube tunnel with emergency exits every 200 m currently in public enquiry phase to link the A-7 highway with the port of Valencia. Construction by shield boring machine or cut-and-cover. Budget around Pta30 billion. 44/01.The ministry of environment has given its go-ahead to the north access to the Valencia harbour. It is planned to build two parallel 4.6 km one-way tunnels with two lanes for each direction to connect the harbour with the A7 motorway. There will be parking areas every 800 metres and emergency exits every 200 metres. TBM excavation expected. 39/02.Open call for tenders, deadline 12th December, 2005 for construction of the Barranco de la Batalla road bypass on the A-7, linking the Ibi-Castalla bypass and the future Alcoy bypass. The project includes two twin bored tunnels: south tunnel (875 m for the left tube and 880 m for the right tube) and north tunnel (655 m for the left tube and 611 m for the right tube). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213977-2005, OJ S 217, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 47/05.Open call for tenders, deadline 7th March, 2006 for work supervision of the Barranco de la Batalla road bypass on the A-7. Two twin bored tunnels will be built: south tunnel (875 m for the left tube and 880 m for the right tube) and north tunnel (655 m for the left tube and 611 m for the right tube). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=247344-2005, OJ S 250, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 03/06.Ferrovial and Hormigones Martinez have been commissioned to construct the Barranco de la Batalla road bypass on the A-7, linking the Ibi-Castalla bypass and the future Alcoy bypass. The EUR53.5 million contract includes two twin bored tunnels: south tunnel (875 m for the left tube and 880 m for the right tube) and north tunnel (655 m for the left tube and 611 m for the right tube). Visit www.ferrovial.es 15/06.Ingenieria 63 received a EUR949,000 contract for work supervision of the Barranco de la Batalla road bypass on the A-7, which requires the construction of two twin bored tunnels: south tunnel (875 m / 880 m) and north tunnel (655 m / 611 m). Visit http://ingenieria63.com 30/06.



Permalink