Awarded the contracts for the two lots for the Phase 1, Sections 3 and 4, renovation works and expansion of railway infrastructures of the Metrovalencia network. The Metrovalencia (F.G.V.) network is made up of 10 lines, 4 of which 4 are surface tramways throughout their entire route (lines 4, 6, 8 and 10) and 6 partially underground (lines 1, 2, 3, 5, 7 and 9). The set of underground routes has a total length of approximately 27 km.
The Joint Venture Vias y Construcciones SA and Vareser 96 SL secured the EUR11.28 million contract, excluding VAT, for Lot 1: Lines 5 and 7 between Alameda and Marítim Stations, corresponding to Section 3 including tunnel sections between the stations of Alameda, Aragon, Amistat, Ayora and Marítim, about 2.7 km long.
The Joint Venture Copcisa SA and Vialobra SL secured the EUR9.81 million contract, excluding VAT, for Lot 2: Lines 3 and 9 between Airport Station and Alboraia Peris Arago, corresponding to Section 4 involving the tunnel sections between the stations of Alboraia Peris Arago, Alboraia Palmaret, Machado, Benimaclet, Facultats Manuel Broseta, Alameda, Colon, Xativa, Angel Gimera, Avinguda del Cid, Nou d'Octubre, Mislata, Mislata Almassil, Faitanar, Quart de Poblet, Salt de l'Aigua, Manises, Roses and Airport, almost 15 km long.
Contact Gerencia de Ferrocarrils de la Generalitat Valenciana, Valencia, tel +034 961924137, email contratacion@fgv.es. Visit https://ted.europa.eu/en/notice/-/detail/679677-2024. Ref.n. 23/022. 45/24.