Moyua-Jaizubia-Geotunel from Donostia/San Sebastian secured the EUR 30.61 million contract, excluding VAT, for construction of the 1.28 km-long twin track Aginaga tunnel on Bilbao-Donostia line. Contact ETS - Euskal Trenbide Sarea, Bilbao, tel +34 946572600, email kontratazioa@ets-rfv.eus. Visit https://ted.europa.eu/en/notice/-/detail/625976-2024. Ref.n. P20025381. 42/24.