Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Serbia

Serbia, Belgrade - rs/13

Light Rail

Restricted call for tenders, deadline 29th May, 2006 for participation of interested tenderers in the eligibility phase for consulting services involving specification and preparation of base documents (preparation of tender documentation, constitution of Terms of Reference, etc.) for the preparation of studies, analyses, expertise, design documentation and general coordination of the preparatory activities required for the construction of the first LRT line in Belgrade. The foreseen duration of the consulting services is 36 months from the signature of the contract with the successful bidder. More details here. A first call for bids has been declared void.  The new LRT route length would be about 25 km. The first line has a length of 13 km, about 23% of which in tunnel, about 8% on bridge and about 69% at grade. The total tunnel section length is around 3.5 km, with six or seven underground stations. The first line has an estimated cost of EUR387 million. Contact Vladimir Depolo, Belgrade Land Development Agency, Unit for Projects Implementation, Njegoseva 84, 11000 Belgrade. Tel. + 381 113443020, fax +381 113440596, e-mail vladimir.depolo@beoland.com or lrt@beoland.com 17/06.



Permalink