Leonhard Nilsen & Sønner AS from Risoyhamn secured the EUR116.17 million (NOK1.18 bn) contract, excluding VAT, for the Tromsø – Alta E6 section under the Kvænangsfjellet, a weather-exposed high mountain pass. The contract scope is a total of 13 km - because parts of the current E6 are being maintained as they are – and it has been divided into three lots: Oksfjordhamn — Tverrelva (Lot 1), Tverrelva – Sandneselva (Lot 2) and Sandneselva – Karvik (Lot 3).
In total, the project consists of:
• two tunnels, with a combined total of 5.6 km (including the portals): the 2.1km Mettevoll Tunnel/Mettevolltunnelen (assessing possible shortening of the tunnel and other measures for landslide protection in the area); the 3.5 km Kvænangsfjell Tunnel/ Kvænangsfjell tunnelen
• open air road totalling approx. 7 600 m;
• construction of Suselva [the Sus River];
• improvement of two tight curves between Rakkeneslia and Sørstrømmen.
Contact Nye Veier AS, attn Are Sangvik Grandal, Kristiansand, tel. +47 47235666, email Are.Grandal@nyeveier.no. For further on tender, please click here and here. 15/21.