High speed train

Closing Date: 19.02.2018 (Tender Closed)

Open procedure, deadline 19.02.2018, for the assignment of works for the construction of civil, line works and related works.

The open procedure is pursuant to art. 60 of Legislative Decree no. 50/2016 and subsequent amendments, entirely managed by electronic means, for the assignment of works for the construction of civilian line works and related works connected by pk 0 + 437.45 to pk 7 + 914.00 of the even track of the section AV / AC Third Pass of the Giovi, from pk 0 + 437.45 to pk 7 + 924.03 of the odd track of the section AV / AC Third Valico dei Giovi, from pk 0 + 236.00 to pk 2 + 356.986 of the even track of the Voltri interconnection, from pk 0 + 235.014 to pk 4 + 160.705 of the odd track of the Voltri Interconnection - Voltri interconnection link and completion Polcevera for a total tender amount of 380 202 249.26 EUR, excluding VAT, of which EUR 376 045 004,07 for work to size and EUR 4 157 245,19 for non-discounting security charges, subdivided into a fixed part relating to the execution of the works falling partly in the First Constructive Lot, partly in Second Constructive Lot, partly in the Third Constructive Lot, partly in the Fourth Constructive Lot and in an optional part related to the execution of the works that fall in part in the Fifth Constructive Lot, partly in the Sixth Constructive Lot.
These works are as follows:
- Category OG4: EUR 302 379 877.74 (three hundred and twenty million three hundred and seventy seven seventy eight eight hundred seventy seven / 74) prevalent category, subject to compulsory qualification, subcontracting within the limit of 30% of the total amount of the contract,
- Category OS21: 56 625 838.72 EUR (fifty-six million, six hundred and twenty-five eight hundred and thirty-eight / 72), a detachable category, a compulsory, superspecialistic category of more than 10% (ten per cent), sub-contracted within the limit of 30% (thirty per cent) of the relevant amount,
- Category OG1: EUR 2 631 536.70 (two million six hundred thirty-one thousand five hundred and thirty-six / 70) eligible category, subject to compulsory qualification, 100% sub-contracted,
- Category OG3: EUR 6 027 759.75 (six million one hundred seventy seven thousand seven hundred and fifty nine / 75), a detachable category with compulsory qualification, 100% sub-contracted,
- Category OS3: EUR 1 156 749.67 (one million two hundred and fifty six thousand seven hundred and forty-nine / 67) eligible category, subject to compulsory qualification, 100% sub-contracted,
- Category OS6: EUR 2 224 278,24 (two million two hundred twenty four thousand two hundred seventy-eight / 24) eligible category, 100% sub-contracted,
- OS8 category: EUR 8 435 576,65 (eight million four hundred thirty, five thousand, five hundred and seventy-six / 65), a detachable category with compulsory qualification, 100% sub-contracted,
- Category OS12-B: EUR 498 214.41 (four hundred ninety eight million two hundred and fourteen / 41) eligible category, subject to compulsory qualification, 100% sub-contracted,
- Category OS31: 222 417.38 (two hundred and twenty-two thousand four hundred and seventeen / 38) divisible category, 100% sub-contracted.

 

The contract duration is 1127 days from the award. Contact COCIV, att.ne Ing. Marcos Montevecchi, Genoa, tel +39 01042188791, email RUP@COCIV.POSTECERT.IT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=508749-2017, OJ S 244. 51/17.



Permalink