Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Munich - de/55

Railway

Deutsche Bahn has awarded the EUR189 million contract (VE10) to the group consisting of   Wayss & Freytag Ingenieurbau AG, Ed. Züblin AG (leader), Max Bögl Stiftung & Co. KG and Bauer pezialtiefbau GmbH for the dismantling and new construction of tracks and switches; the new construction of two flyovers; a double-track steel arched bridge; and a noise barrier bridge. Other works include the new construction of additional noise barriers; retaining structures; and the pedestrian, bike and car tunnel in Laim. The package also covers the modernisation of the Laim passenger station as well as electrical works on low- and medium-voltage installations, underground cabling works, and the site preparation for the west portal of the tunnel. Visit https://www.deutschebahn.com and https://en.strabag-newsroom.com. 52/18.

https://www.deutschebahn.com/pr-muenchen-de/aktuell/presseinformationen/DB-Netz-AG-vergibt-den-ersten-Auftrag-f%C3%BCr-die-Hauptbauma%C3%9Fnahmen-der-2--Stammstrecke-M%C3%BCnchen--3484570

https://en.strabag-newsroom.com/pressreleases/deutsche-bahn-awards-first-two-contracts-for-main-construction-works-on-munichs-second-core-route-2811134



Permalink