Restricted call for bids, deadline 14th May, 2003 for the preliminary studies of the Line B extension from Gerland to Oullins, 1.8 km with one station with a variant for 2.5 km with two stations. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=067561-2003, OJ S 76, or contact Sytral, Lyon, fax +33 478531284. 17/03.Open call for bids, deadline 7th February, 2006 for project management for the planning and the legal and administrative assistance for the Line B extension of the Lyon metro, between the current terminal station in Gerland and Oullins. Expected length is 2 km with no intermediate station. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=240956-2005, OJ S 244, or contact SYTRAL, Lyon, fax +33 472914529. E-mail carnelli@sytral.fr. Visit www.sytral.fr/lignesfortes/metrob.htm 04/06.Negotiated procedure, deadline 24th February, 2006 for lead engineering for the studies, civil works and equipment of the Line B extension of the Lyon metro, between the current terminal station in Gerland and Oullins. The length will be about 1.7 km, including a crossing of the Rhone river. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014732-2006, OJ S 13, or contact SYTRAL, Lyon, fax +33 472914529. E-mail carnelli@sytral.fr. Visit www.sytral.fr/lignesfortes/metrob.htm 05/06.Negotiated procedure, deadline 13th March, 2006 for lead engineering for the studies, civil works and equipment of the Line B extension of the Lyon metro, between the current terminal station in Gerland and Oullins (contract 06.001). The length will be about 1.7 km, including a crossing of the Rhone river. This new tender cancels the one published at week 05/06. Click fr/54. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028997-2006, OJ S 26, or contact SYTRAL, Lyon, fax +33 472914529. E-mail carnelli@sytral.fr. Visit www.sytral.fr/lignesfortes/metrob.htm 07/06.Negotiated procedure, deadline 15th September, 2006 for contract 06.97 consisting of the preparation of administrative files (public hearings, environmental impact study, etc.) for the extension of Line B of the Lyon metro from Gerland to Oullins, 1.7 km of length including a crossing of the Rhone river. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=157731-2006, OJ S 146, or contact Sytral, Lyon, fax +33 478531284. 33-34/06.Semaly, a subsidiary of Group Egis, has pocketed a EUR12 million contract for project management for the 1.7 km extension of Line B of the Lyon metro to Oullins. A crossing of the Rhone river is planned, either in viaduct or by tunnel, together with a multimodal underground station. Visit www.semaly.com and www.sytral.fr/lignesfortes/metrob.htm 38/06.Negotiated call for tenders, deadline 7th December, 2007 for civil engineering for the extension of Line B of the Lyon metro from Gerland to Oullins, including a crossing of the Rhone river by TBM or immersed caissons. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258180-2007, OJ S 212, or contact Sytral, Lyon, tel. +33 472845800. E-mail unitemarches@sytral.fr 47/07.