Negotiated contract, deadline 14th October, 2002 for engineering services for a 1.9 km underground extension to metro Line 13 from Gabriel Péri to Gennevilliers-Le Luth. Excavation at shallow depth of two and three-track cut-and-cover tunnels. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=141373-2002, OJ S 178, or contact RATP, Paris, fax +33 141953181. E-mail olivier.schubnel@ratp.fr 38/02.
Negotiated procedure, deadline 15th July, 2003 for construction of an extension to Line 13 from Gabriel Péri to Le Luth in Asnières-Gennevilliers. Lot 1 is a 800 m-long 7.3 m-wide tunnel at a depth of 10-14 m and a 90 m-long x 18 m-wide x 15 m-deep station. Lot 2 is a 910 m-long 7.3-11.1 m-wide tunnel at a depth of 11-17 m and a 90 m-long x 18 m-wide x 10 m-deep station. Cut-and-cover method. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=101636-2003, OJ S 113, or contact RATP, Fontenay-sous-Bois, fax +33 141953181. E-mail olivier.schubnel@ratp.fr 26/03.Negotiated procedure, deadline 28th August, 2003 for construction of an extension to Line 13 from Gabriel Péri to Le Luth in Asnières-Gennevilliers. Lot 1 includes two double-track sections of cut-and-cover tunnel, 300 m and 500 m in length x 7.3 m in width, a 90 m-long x 18 m-wide x 15 m-deep station in Asnières Gennevilliers II and associated works. Lot 2 includes two double-track sections of cut-and-cover tunnel, 470 m-long x 7.3 m-wide and 440 m-long x 11.1 m-wide, a 90 m-long x 18 m-wide x 10 m-deep station in Asnières Gennevilliers III and associated works. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=129300-2003, OJ S 142, or contact RATP, Fontenay-sous-Bois, fax +33 141953181. E-mail olivier.schubnel@ratp.fr 32/03.As part of the extension from Gabriel Peri to Le Luth in Asnieres-Gennevilliers on Line 13, a JV between Eiffage, Sogea, Guintoli, Montcocol, Botte Sade Fondations and Spie Fondations will build two double-track sections of cut-and-cover tunnel, 300 m and 500 m in length x 7.3 m in width, a 90 m-long x 18 m-wide x 15 m-deep station in Asnières-Gennevilliers II and associated works (lot T1). Visit www.eiffagetp.fr and www.montcocol.fr 02/05.A JV between GTM, Chantiers Modernes, Demathieu & Bard and Razel will build two double-track sections of cut-and-cover tunnel, 470 m-long x 7.3 m-wide and 440 m-long x 11.1 m-wide, a 90 m-long x 18 m-wide x 10 m-deep station in Asnieres-Gennevilliers III and associated works (lot T2). Foundations works by Soletanche Bachy and Bilfinger Berger. Visit www.gtm-construction.com, www.razel.fr and www.demathieu-bard.fr 02/05.Negotiated procedure, deadline 4th February, 2005 for outfit (ventilation, heating, air conditioning, low voltage, lighting) of the tunnel and Asnieres-Gennevilliers II and Le Luth stations on Line 13. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=217084-2004, OJ S 251, or contact RATP, Paris, fax +33 158769448. E-mail thomas.arrondeau@ratp.fr 02/05.ETT secured a EUR1.5 million contract for low voltage and very low voltage equipment of the 1,880 m tunnel on the north extension of Line 13 of the Paris metro between Asnieres-Gennevilliers II and Le Luth. Visit http://extension-reseau.ratp.fr/m13 or www.ratp.fr/common/ressources/750.pdf 08/06.