VSP Stolitzka & Partner Ziviltechniker GmbH from Wien have secured the EUR 577,228 contract for surveying, GTM, tunnel scanner, part of the general rehabilitation of the Pack tunnel chain, comprising of the Herzogberg (2007 m, 1956 m), Mitterberg (1142 m, 1134 m) and Kalcherkogel (1993 m, 1968 m) tunnels on the section km281,400 - km 231,700 of the A02 South motorway. Contact Asfinag, attn Michael Palzer, Vienna, tel. +43 50108 14473, email michael.palzer@asfinag.at. Visit https://ted.europa.eu/en/notice/-/detail/575422-2025. Ref.n. ProVia n. 138399. 36/25.