Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Croatia

Croatia, Zagreb-Split - hr/13

Highway

Work started in August three months behind schedule on the 5,860 m-long Mala Kapela tunnel awarded to Coop Costruttori for €34.7 million. Completion expected in June 2005. Visit www.coopcostruttori.it and www.hac.hr 43/02. Strabag has signed a contract for the construction of the Brinje tunnel consisting of two parallel tubes, each totalling 1,560 metres. The contract value is €25.45 million. This amount does not include E&M equipment. Completion of the work is set for December 2003 and opening in June 2004. Visit www.bauholding.at and www.hac.hr 44/02. Croatian contractor Hidroelektra Niskogradnja and Czech contractor Subterra started excavation of the 2 x 2,290 m-long Plasina tunnel in November on motorway section Bosiljevo-Sveti Rok, part of the Zagreb-Split motorway. The project is worth €32 million. The tunnel should be completed in June 2004. Visit www.hac.hr, www.subterra.cz and www.hidroelektra-niskogradnja.hr. Read E-News Weekly # 51 for a full report on the tunnels on section Bosiljevo Interchange-Dugopolje Interchange. 51/02.Zagreb-based company Mediteran Union Tunel has been awarded in 2003 a concession contract for a BOT project consisting of the building and operation during 30 years of the Sveti Ilija-Biokovo tunnel. This is a 4.1 km 8 m-wide single-tube tunnel for two lanes. The tunnel would be built using the drill/blast method through limestone. The tunnel would pass through the Biokovo mountain to connect county road Z-6179 in Rastovac, Zagvozd municipality in the north with local road L-67177 in Bast, Baska Voda municipality in the south. The project includes a 3.5 km north access road and a 2.9 km south access road. The tunnel will be a direct link from the hinterland to the coastal Adriatic area and the Adriatic motorway.The company is seeking partners, either infrastructure operator or construction company, to join the concession company. According to feasibility studies, first class vehicles would pay a EUR2.6 toll. The estimated cost to build the tunnel is EUR50 million. Potential partners may contact Mediteran Union Tunel d.d., Mr. Ljubo Grepo, Zeleni Trg 6A, 10000 Zagreb, Croatia. Tel. +385 16199 612 or 16199613, fax +385 16199614, e-mail mut@zg.tel.hr 36/04.



Permalink

Croatia, Zagreb-Rijeka - hr/12

Motorway

Joint venture of Spie Batignolles and Mediteran Union Tunel awarded three tunnels on the Zagreb-Rijeka motorway at Vileki, Javorova Kosa and Pod Vugles. A fourth at Sveti Marco will be excavated by Strabag of Austria. Recent breakthrough at 5.6 km Sveti Rok tunnel reported. October 1999.   Civil Engineering Institute of Croatia reports completion of 5.67 km Sveti Rok tunnel driven from the south by Konstruktor Split and from the north by Hidroelektra Zagreb over a six-year period from 1993. Rock conditions were good, with no soft or unexpected ground, but two natural caves were encountered, one of which was quite long and deep. A second, parallel tube is under consideration, but financing is not yet in place. Visit www.igh.hr for a list of earlier Croatian tunnels. March 2000. On Zagreb-Rijeka highway, 1.2 km Veliki tunnels completed on full face in good rock using Tamrock drillrigs and 600 m Pod Vugles completed in shale using NATM techniques and pipe spiling. Visit www.spie.fr On Zagreb-Split highway Javorova Kosa reported halfway for completion mid-2001. Visit www.fpz.hr 04/01.  Prequalification notice, deadline 7th December, 2001, for the Vrbovsko-Vukova Gorica section of the Rijeka-Zagreb highway comprising construction and equipment of the Rozman Brdo double tube tunnel (508 m + 528 m) and equipment of the Veliki Glozac tunnel. Visit www.arz.hr and www.hrgraditelj.hr 46/01.Invitation for prequalification, deadline 28th October, 2005 for upgrading the right (south) carriageway section of the Rijeka-Zagreb motorway between Kikovica and Stara Susica. Section Ostrovica-Vrata (12.44 km) includes three tunnels of 223 m, 262 m and 2,143 m. Section Vrata-Delnice (8.93 km) includes two tunnels of 775 m and 858 m. Section Delnice-Kupjak (7.93 km) includes two tunnels of 590 m and 859 m. Section Kupjak-Stara Susica (7.59 km) includes two tunnels of 595 m and 1,490 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=179375-2005, OJ S 181, or contact Autocesta Rijeka-Zagreb, Zagreb, fax +385 16328111. E-mail ljkolbas@arz.hr or nmarohnic@arz.hr 39/05.Invitation to tender, deadline 2nd May, 2006 for expert supervision and quality control during construction of the right southern carriageway (phase II B) from Kikovica to Stara Susica (44.26 km) on the Rijeka-Zagreb motorway. The section includes nine tunnels. The longest is the Tuhobic tunnel (1 x 2,143 m). Click hr/12. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=048712-2006, OJ S 47, or contact Motorway Rijeka-Zagreb, Zagreb, fax +385 16328111. E-mail nmarohnic@arz.hr 11/06.



Permalink

Croatia, Cicarija - hr/11

Railway

This is the first of 3 tunnels planned for the next 10 years as Croatia begins the modernisation of its railway system. At 14.3 km, the single-tube, twin-track Cicarija tunnel on the Rijeka-Istria line will be the longest and most costly at $700 million. The other two tunnels are Krapina 4 & 5 on the line between Krapina and Varazdin. These are also single tubes and are 8.5 km and 1.1 km respectively and budgeted at $105 million and $15 million. In the longer term, another nine tunnels will be required ranging from 3.6 km to 12.9 km in length with a total length of 74.3 km. Details from Hrvatske Zeljeznice, the Croatian Railways authority. October 1999.



Permalink

Cyprus

Cyprus, National - cy/13

Underground cables

Closing Date: 03.05.2019 (Tender Closed)

Open invitation to tender, deadline 03.05.2019, for the supply of LV XLPE Underground Cables. The value of the contract is EUR7.45 million, excluding VAT. The duration of the contract is 36 months. For bid documents https://www.eprocurement.gov.cy where tenders must be sent. Contact Electricity Authority of Cyprus, Nicosia, tel +357 22201655, fax +357 22201660, email purchasing@eac.com.cy. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140215-2019.

Ref.n. 475/2018.  13/19.



Permalink

Cyprus, Pafos District - cy/12

Motorway

Prequalification for DBFO concession contract, deadline 30th June, 2006 for the 31 km Pafos-Polis motorway, including two twin tunnels, of 300 m and 730 m, with two lanes per tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087625-2006, OJ S 83, or contact Ministry of Communications and Works, Strovolos, fax +357 22497972 or 22498932. E-mail akakouris@pwd.mcw.gov.cy or esawidou@pwd.mcw.gov.cy 20/06.Negotiated procedure, deadline 15th December, 2006 for design, construction, operation and maintenance of the 31 km Pafos-Polis motorway on a DBFO basis. The contract will be for a 25-year term and will be operated under a PPP. The motorway includes two twin bored tunnels, of 300 m and 730 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=215869-2006, OJ S 203, or contact Ministry of Communications and Works, Nicosia, fax +357 22497972 or 22498932. E-mail akakouris@pwd.mcw.gov.cy or esavvidou@pwd.mcw.gov.cy 44/06.The Kinyras consortium led by J&P-Avax (45%), with French infrastructure and transport concessions group VINCI Concessions (40%) and Cybarco (15%), has been named preliminary preferred bidder for the motorway section linking Paphos to Polis. The project consists of a 30-year contract that includes the financing, design, construction and operation of a 31 km stretch of motorway, on the west coast of the island. The project is worth a total of EUR470 million, whereof EUR300 million in investment and EUR170 million in operation services. The work, to last four and a half years, will be carried out by a consortium consisting of J&P-Avax (60%), VINCI Construction Grands Projets (20%) and Cybarco (20%). This represents a total amount of EUR275 million and includes in particular the construction of nine viaducts and three tunnels: two twin-tube tunnels of 730 m and 290 m along with a 555 m single-tube on a connecting road. Visit www.jp-avax.gr and www.vinci.com 06/08.



Permalink

Cyprus, Limassol - cy/11

Sewer - Shield

Amathus tunnel 654 m-long undertaken in calcarenite at maximum depth of 90 m by Cybarco for $4.1 million as part of $25 million scheme. 2.44 m-diameter shield with cutter boom erecting precast concrete segmental lining. August 1994.



Permalink

Czech Republic

Czech Republic, Central Bohemia - cz/44

Motorway


The association of companies Metrostav TBR, STRABAG Silnice, Pudis, Pragoprojekt and GeoTec-GS, secured the EUR 16.41 million (CZK416.65 million) contract, excluding VAT, for the detailed geotechnical survey (PoGTP) in the form of an exploration tunnel (1617 m) for the Kamenna Vrata tunnel (1690 m) on the future Central Bohemian section of the D3 motorway between Prague and Jilove u Prahy. Contact RSD CR, attn Petra Krizova, Prague, tel +420 954902251, email petra.krizova@rsd.cz. Visit  https://ted.europa.eu/en/notice/-/detail/687949-2024 and https://kraje.rsd.cz/.  Ref.n. 02PB-000819. 46/24.



Permalink


Open invitation to tender, deadline 18/01/2024, for a detailed geotechnical survey (PoGTP) in the form of an exploration tunnel (1617 m) for the Kamenna Vrata tunnel (1690 m) on the future Central Bohemian section of the D3 motorway between Prague and Jilove u Prahy. Click here for bid documents and where tenders must be sent. Value of contract EUR16.07 million (CZK480 million), excluding VAT. .Duration of the contract 45 months. Contact RSD CR, attn Petra Krizova, Prague, tel +420 954902251, email petra.krizova@rsd.cz. Visit  https://ted.europa.eu/en/notice/-/detail/767791-2023 and https://ted.europa.eu/en/notice/-/detail/560231-2023. Ref.n. 02PB-000819. 51/23.



Permalink

Czech Republic, Pardubice - cz/43

Highway

Closing Date: 31.10.2024 (Tender Closed)


Competitive dialogue, deadline 31/10/2024, for the design, construction, financing, operation and maintenance of the 35km Opatovec - Mohelnice section of the D35 motorway including the twin-tube tunnels Detrichov (3983 m) and Maletin (1313 m) and for the operation and maintenance of the adjacent sections D35 Litomysl - Opatovec. Click here for bid/tender documents and where tenders must be sent. Value of contract is EUR4.69 bn (CZK117.57 bn), excluding VAT. Duration of contract will be 30 months. Contact Ceska republika - Ministerstvo dopravy, Prague, tel +420 225131539, email jan.ornst@md.gov.cz. Visit https://ted.europa.eu/en/notice/-/detail/558749-2024 and https://ted.europa.eu/en/notice/-/detail/475625-2024. Ref.n. VZ-32-550/2024. 38/24.



Permalink

Czech Republic, Plzen/ Pilsen - cz/42

Railway

Closing Date: 26.10.2023 (Tender Closed)



Open invitation to tender, deadline 26/10/2023, to increase safety  in the 4.2 km twin tube Ejpovice tunnel located on the Rokycany - Plzen/ Pilsen railway line. Click here for tender documents. Value of the contract is EUR1.56 million (CZK38.14 million), excluding VAT. Duration of the contract will be 11 months. Contact Sprava zeleznic, attn Barbora Sakorova, Prague, tel +420 720969702, email SykorovaB@spravazeleznic.cz.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=580432-2023. Ref.n. 15084/2023-SZ-SSZ-OVZ. 40/23.   

 




Permalink

Czech Republic, Prague - Central Bohemian - cz/41

Railway

Closing Date: 20.08.2021 (Tender Closed)


Open invitation to tender, deadline 20/08/20, for the updating of documentation for zoning procedures for the construction of the new Prague-Smíchov - Beroun  railway line, including the 24.7 km  twin-tube single track Beroun tunnel . Value of the contract EUR6.17 million (CZK 160.57 million), excluding VAT.  Duration of the contract 36 months. Contact  Sprava zeleznic, attn Ing. Jana Sedova, Prague, tel +420 727966017, email sedova@spravazeleznic.cz. For further on tender, please click here, here and here. Ref.n. 10851/2020-SŽ-SSZ-OVZ. 34/20. 

 




Permalink


The open invitation to tender, deadline 18/08/20, for the updating of documentation for zoning procedures for the construction of the new Prague-Smíchov - Beroun  railway line, including the 24.7 km Beroun tunnel, has been discontinued. The contract was not awarded. Contact  Sprava zeleznic, attn Ing. Jana Sedova, Prague, tel +420 727966017, email sedova@spravazeleznic.cz. For further on tender, please click here and here. Ref.n. 10851/2020-SŽ-SSZ-OVZ. 03/21. 

 



Permalink


Open invitation to tender, deadline 24/05/2021, for the updating of documentation for zoning procedures for the construction of the new Prague-Smíchov - Beroun  railway line, including the 24.7 km  twin-tube single track Beroun tunnel . Value of the contract EUR4.64 million (CZK 119.88 million), excluding VAT.  Duration of the contract 31 months. Contact  Sprava zeleznic, attn Ing. Jana Sedova, Prague, tel +420 727966017, email sedova@spravazeleznic.cz. For further on tender, please click here. Ref.n. 2288/2021-SŽ-SSZ-OVZ. 16/21.  

 




Permalink