Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Croatia

Croatia, Split - hr/14

Highway

Open call for tenders, deadline 30th August, 2007 for construction of the Split road bypass, section 02 Stobrec-Dugi Rat (3.2 km), lot 1 Stobrec-Grljevac. This section includes construction of a four-lane highway with two tunnels: Perun tunnel (south tube, 222.32 m / north tube, 201.92 m) and Rudine tunnel (south tube, 360.52 m / north tube, 363.23 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=144167-2007, OJ S 118, or contact Hrvatske Ceste, Zagreb, fax +385 14722491. E-mai lsnjezana.kurek@hrvatske-ceste.hr27-28/07.Open call for tenders, deadline 30th August, 2007 for construction of the Split road bypass, section 03 Dugi Rat-Omis (2.8 km), lot 4 Omis tunnel-Omis. The civil works will consist of the construction of a two-lane highway with two tunnels. The overall length of tunnels is 1,697 metres (Omis tunnel, 1,471 m and Brzet tunnel, 226 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=144168-2007, OJ S 118, or contact Hrvatske Ceste, Zagreb, fax +385 14722491. E-mail snjezana.kurek@hrvatske-ceste.hr27-28/07.Open call for tenders, deadline 23rd August, 2007 for supervision of works of the Split road bypass, section 01 lot 1; section 02 lot 1; and section 03 lot 4. Section 02 lot 1 includes the Perun tunnel (south tube, 222.32 m / north tube, 201.92 m) and Rudine tunnel (south tube, 360.52 m / north tube, 363.23 m). Section 03 lot 4 includes the Omis tunnel (1,471 m) and Brzet tunnel (226 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=153552-2007, OJ S 126, or contact Hrvatske Ceste, Zagreb, fax +385 14722491. E-mail snjezana.kurek@hrvatske-ceste.hr 27-28/07.A joint venture of Konstruktor Inzenjering, Viadukt, Hidroelektra Niskogradnja and Strabag won a HRK352.3 million contract to build section 02 Stobrec-Dugi Rat, lot 1 Stobrec-Grljevac on the Split bypass road. It includes the Perun tunnel (south tube, 222.32 m / north tube, 201.92 m) and Rudine tunnel (south tube, 360.52 m / north tube, 363.23 m). The same joint venture secured a HRK326.2 million contract to construct section 03 Dugi Rat-Omis (2.8 km), lot 4 Omis tunnel-Omis. The contract includes two tunnels: the 1,471 m Omis tunnel and the 226 m Brzet tunnel. Visit www.konstruktor-split.hr, www.hidroelektra-niskogradnja.hr and www.strabag.hr. The work will be supervised by Institut gradevinarstva Hrvatske (IGH). Visit www.igh.hr 13/08.



Permalink