Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Madrid - es/66

Road

Excavation of 1.7 km Marí­a de Molina tunnel just launched by jv of Ferrovial-Agromí¡n and ACS to link Paseo de la Castellana with N-II national road. Difficult job as metro lines 4, 6 and 9 must be crossed. Contract value of €38.46 million with time frame of 16 months and opening expected for spring 2003. Project design by Prointec. Visit www.prointec.es, www.ferrovial.es and www.grupoacs.com 43/01.



Permalink

Spain, Asturias - es/65

Motorway

Open invitation to tender, deadline 3rd November, 2001, for preliminary design of AS-15 motorway from Cornellana to Puerto de Cerredo, including 3 km-long Raí±adoiro tunnel. Contact Department for Infrastructure, fax +34 98 510 5884. 43/01. Award to a jv of Tecnia Ingenieros and Geocontrol of the preliminary design for the AS-15 variant at the Raí±adoiro pass, including a 3 km tunnel. Contract value of €299,300. Visit www.geocontrol.es 18/02. Open call for bids, deadline 17th February, 2003 for advisory and consultative engineering services for solution B in the early project for road AS-15 variant Cornellana-Puerto de Cerredo which will require the 3 km Raí±adoiro tunnel. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=002123-2003, OJ S 3, or contact Consejerí­a de Infraestructuras y Polí­tica Territorial del Principado de Asturias, Oviedo, fax +34 985105884. 04/03.Preinformation notice for construction of the AS-15 bypass, Cornellada-Puerto Cerredo including the 3 km Raí±adoiro tunnel. Work to commence in March 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030090-2003, OJ S 36, or contact Principado de Asturias, Oviedo, fax +34 985105884. 09/03.Preinformation notice for design of the AS-15 bypass, section Cornellada-Puerto Cerredo, including the 3 km Raí±adoiro tunnel. Tender budget: EUR360,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=025799-2004, OJ S 29, or contact Principado de Asturias, Oviedo, fax +34 985105884. 09/04.Preinformation notice for construction of the AS-15 bypass, section Cornellada-Puerto Cerredo including the 3 km Raí±adoiro tunnel. Work to commence in December 2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=025521-2004, OJ S 29, or contact Principado de Asturias, Oviedo, fax +34 985105884. 09/04.Open call for tenders, deadline 2nd September, 2005 for design of the AS-15 road bypass, section Cornellana-Puerto de Cerredo, which includes the 3 km Ranadoiro tunnel in Cangas del Narcea. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=136057-2005, OJ S 137, or contact Principado de Asturias, Oviedo, fax +34 985105884. Subscribe to E-News Weekly 21/2005. 30/05.Tecnia secured a EUR505,000 contract to design the AS-15 road bypass, section Cornellana-Puerto de Cerredo, which includes the 3 km Ranadoiro tunnel in Cangas del Narcea. Visit www.tecniaingenieros.com 05/06.Open call for bids, deadline 7th December, 2006 for construction of the Cornellana-Cerredo Pass section on road AS-15, including the approx. 3 km Ranadoiro tunnel. Read E-News Weekly 21/2005. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215839-2006, OJ S 203, or contact Principalty of Asturias, Oviedo, fax +34 985105884. E-mail martaalr@princast.es 44/06.Open call for tenders, deadline 2nd March, 2007 for site supervision as well as health and safety coordination during construction of the Ranadoiro tunnel on the Cornellana-Cerredo Pass section of road AS-15 at Ranadoiro Pass. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=13908-2007, OJ S 12, or contact Principado de Asturias, Oviedo, fax +34 985105884. E-mail martaalr@princast.es 05/07.The construction contract of the Cornellana-Puerto de Cerrado road bypass and Ranadoiro tunnel on road AS-15 has been awarded to a JV formed by Ferrovial Agroman, OCA and Aglomerados Asfalticos, for EUR40.6 million. The time frame for completion is 36 months. The existing 6 m-wide road, without shoulders, climbs a steep slope with sharp curves (very small radius up to 24 metres) and, above all, crosses the Ranadoiro Pass through a small tunnel, at an altitude of 1,181 metres. The new project shortens the existing path by 7.6 km. The road will carry two 3.5 m-wide lanes and 0.5 m shoulders. In its first 400 metres, the new platform follows basically the existing AS-15. Then, the alignment leaves the current road and reconnects with it near Rengos. The future disused road, with a length of some 4.8 km, will be demolished and the area will be completely rehabilitated. The 1,868.36 m-long Ranadoiro tunnel begins at chainage 0+435. The tunnel, which will be wider than the open air road for safety reasons, includes two 3.5 m-wide lanes and 0.5 m shoulders, 0.75 pavements on both sides and a 0.4 m median strip with horizontal indicators. The south portal will be built using forepoling and retaining walls. The tunnel will be excavated by conventional methods and will be equipped, among other things, with lighting (normal, security and emergency), automatic ventilation, double power supply, emergency generators, uninterrupted power supply (UPS), SOS call stations, and fire shelters. Visit www.ferrovial.es 15/07.A joint venture of GOC and Seinco landed a EUR790,000 contract for site supervision as well as health and safety coordination during construction of the 1.9 km Raí±adoiro tunnel on the Cornellana-Cerredo Pass section of road AS-15 at Raí±adoiro Pass. Visit www.gocsa.es and www.seinco.net 08/08.



Permalink

Spain, Canaries - es/64

Road

Breakthrough reported on 5th October one month ahead of schedule after last blast on 2.4-km La Cumbre tunnel on east to west road TF-812 between Santa Cruz de La Palma and Los Llanos de Aridane on Isle of La Palma. Total cost around Ptas4.2 billion. Visit www.gobcan.es 42/01.Open call for bids, deadline 7th April, 2006 for design and construction of the road connection to Fonsalia harbour on the new road Adeje-Santiago del Teide. The project includes a bidirectional single bored tunnel, 1.4 km in length with three lanes. The roadway width will be about 12 m. It is planned to be constructed using the drill/blast method in top heading / bench sequence, with the help of a roadheader. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=05453-2006, OJ S 5, or contact Canary autonomous region, Santa Cruz de Tenerife, fax +34 922475088. 07/06.A JV of Ferrovial Agroman, Mejias y Rodriguez, Construcciones Darias, Gomasper, and VVO Construcciones secured a EUR167.6 million contract to design and construct the road connection to Fonsalia harbour on the new road Adeje-Santiago del Teide. The project includes a bidirectional single bored tunnel, 1.4 km in length with three lanes. Click es/64 for more. Visit www.ferrovial.es and www.construccionesdarias.com 43/06.Applus Norcontrol and Tecamac received a EUR2.2 million contract for on-site supervision and work control for the road connection to Fonsalia harbour on the new road Adeje-Santiago del Teide, including a 1.4 m-long three-lane bidirectional single bored tunnel. Visit www.appluscorp.com 16/07.



Permalink


Open invitation to tender, deadline 18/11/2021, for an operation and maintenance service for the Road Information Center (CIC) and its dependent systems and facilities installed in some tunnels and roads on Tenerife island.  For tender documents, please click here. The contract value will be EUR6.91 million, excluding VAT, and the duration 36 months.  Contact Consejo de Gobierno Insular del Cabildo Insular de Tenerife,  Santa Cruz de Tenerife, tel +34 901501901, fax +34 922239704, email licitaciones@tenerife.es . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=530727-2021. Ref.n. C-1468/2021. 42/21.

 

Spain-Santa Cruz de Tenerife: Tunnel operation services


2021/S 203-530727

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Consejo de Gobierno Insular del Cabildo Insular de Tenerife
National registration number: P3800001D
Postal address: Plaza de España, s/n.
Town: Santa Cruz de Tenerife
NUTS code: ES70 Canarias
Postal code: 38003
Country: Spain
Contact person: Consejo de Gobierno Insular del Cabildo Insular de Tenerife
E-mail: licitaciones@tenerife.es
Telephone: +34 901501901
Fax: +34 922239704
Internet address(es):
Main address: http://www.tenerife.es/
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=p%2FX7DdnIHYjnSoTX3z%2F7wA%3D%3D
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=PrX7xrUg3MCiEJrVRqloyA%3D%3D
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
Electronic communication requires the use of tools and devices that are not generally available. Unrestricted and full direct access to these tools and devices is possible, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=p%2FX7DdnIHYjnSoTX3z%2F7wA%3D%3D
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Servicio de explotación y mantenimiento del CIC y de los sistemas e instalaciones de él dependientes instalados en determinados túneles y carreteras de la isla.


Reference number: C-1468/2021
II.1.2)Main CPV code
63712320 Tunnel operation services
II.1.3)Type of contract
Services
II.1.4)Short description:


Servicio de explotación y mantenimiento del CIC y de los sistemas e instalaciones de él dependientes instalados en determinados túneles y carreteras de la isla.


II.1.5)Estimated total value
Value excluding VAT: 6 913 701.76 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
34993100 Tunnel lighting
42961200 Scada or equivalent system
50000000 Repair and maintenance services
50230000 Repair, maintenance and associated services related to roads and other equipment
50532000 Repair and maintenance services of electrical machinery, apparatus and associated equipment
63712710 Traffic monitoring services
II.2.3)Place of performance
NUTS code: ES70 Canarias
Main site or place of performance:


Isla de Tenerife.. .


II.2.4)Description of the procurement:


Servicio de explotación y mantenimiento del CIC y de los sistemas e instalaciones de él dependientes instalados en determinados túneles y carreteras de la isla.


II.2.5)Award criteria
Criteria below
Quality criterion - Name: Memoria Descriptiva / Weighting: 40
Cost criterion - Name: Características medioambientales / Weighting: 5
Cost criterion - Name: Mejora nº 1: aplicación móvil GMAO, MOVILGMAO. / Weighting: 10
Cost criterion - Name: Mejora nº2:Instalación de equipos de megafonía IP en sustitución de megafonía analógica en varios túneles . / Weighting: 25
Cost criterion - Name: Precio / Weighting: 20
II.2.6)Estimated value
Value excluding VAT: 6 913 701.76 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 36
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:


Prorrogas anuales hasta un máximo de dos años permaneciendo inalterables las características del contrato durante el período de duración del número de prórrogas que se indican conforme el apartado 26 del Cuadro de Características Particulares.


II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:


Capacidad de obrar


No prohibición para contratar


Cumplimiento con las obligaciones con la Seguridad Social


Cumplimiento con las obligaciones tributarias


Titulos habilitantes: Instalaciones eléctricas de baja tensión, Instalaciones eléctricas de alta tensión, Equipos a presión, Instalaciones frigoríficas, Instalaciones de protección contra incendios.


III.1.2)Economic and financial standing
List and brief description of selection criteria:


- P1-4


- V5-2


Cifra anual de negocio


III.1.3)Technical and professional ability
List and brief description of selection criteria:


- P1-4


- V5-2


- Otros


III.2)Conditions related to the contract
III.2.2)Contract performance conditions:


Sometimiento del contratista a la normativa de protección de datos. Descripción: De conformidad con la cláusula 27 del pliego de cláusulas administrativas particulares


Consideraciones de tipo social. Descripción: De conformidad con la cláusula 27 del pliego de cláusulas administrativas particulares


Consideraciones de tipo medioambiental. Descripción: De conformidad con la cláusula 27 del pliego de cláusulas administrativas particulares


Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Open procedure
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 18/11/2021
Local time: 19:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
Duration in months: 4 (from the date stated for receipt of tender)
IV.2.7)Conditions for opening of tenders
Date: 16/12/2021
Local time: 09:00
Place:


Palacio Insular


Datos de Dirección:


Calle: Plaza de España, nº1


CP: 38001


Población: Santa Cruz de Tenerife


País: España


Information about authorised persons and opening procedure:


Descripción:


Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: TRIBUNAL ADMINISTRATIVO DE CONTRATOS PÚBLICOS DE LA COMUNIDAD AUTÓNOMA DE CANARIAS
Postal address: Edificio Usos Múltiples II, planta 6ª. Avda. José Manuel Guimerá, 10
Town: Santa Cruz de Tenerife
Postal code: 38003
Country: Spain
E-mail: tribunalcontratos.hacienda@gobiernodecanarias.org
Telephone: +34 922951375
VI.5)Date of dispatch of this notice:
14/10/2021



Permalink


Open invitation to tender, deadline 07/02/2022, for safety manager of tunnel operations on Tenerife Island and its regional interest roads.  For tender documents, please click here. The contract value will be EUR 506,910.24, excluding VAT, and the duration 36 months.  Contact Consejo de Gobierno Insular del Cabildo Insular de Tenerife,  Santa Cruz de Tenerife, tel +34 901501901, fax +34 922239704, email licitaciones@tenerife.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=007808-2022. Ref.n. C-1467/2021. 01/22. 

 


Spain-Santa Cruz de Tenerife: Civil engineering consultancy services

2022/S 005-007808

Contract notice

Services

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Consejo de Gobierno Insular del Cabildo Insular de Tenerife
National registration number: P3800001D
Postal address: Plaza de España, s/n.
Town: Santa Cruz de Tenerife
NUTS code: ES70 Canarias
Postal code: 38003
Country: Spain
Contact person: Consejo de Gobierno Insular del Cabildo Insular de Tenerife
E-mail: licitaciones@tenerife.es
Telephone: +34 901501901
Fax: +34 922239704
Internet address(es):
Main address: http://www.tenerife.es/
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=p%2FX7DdnIHYjnSoTX3z%2F7wA%3D%3D

I.3)Communication

The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=K9X23z0Um6EBPRBxZ4nJ%2Fg%3D%3D

Additional information can be obtained from the abovementioned address

Tenders or requests to participate must be submitted to the abovementioned address

Electronic communication requires the use of tools and devices that are not generally available. Unrestricted and full direct access to these tools and devices is possible, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=p%2FX7DdnIHYjnSoTX3z%2F7wA%3D%3D

I.4)Type of the contracting authority

Regional or local authority

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

Responsable de seguridad en fase de explotación de los túneles existentes en la red de carreteras insulares y de interés regional.

Reference number: C-1467/2021

II.1.2)Main CPV code

71311000 Civil engineering consultancy services

II.1.3)Type of contract

Services

II.1.4)Short description:

Responsable de seguridad en fase de explotación de los túneles existentes en la red de carreteras insulares y de interés regional.

II.1.5)Estimated total value

Value excluding VAT: 506 910.24 EUR

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.2)Additional CPV code(s)

71317210 Health and safety consultancy services

79417000 Safety consultancy services

II.2.3)Place of performance

NUTS code: ES70 Canarias

Main site or place of performance:

Isla de Tenerife.. .

II.2.4)Description of the procurement:

Responsable de seguridad en fase de explotación de los túneles existentes en la red de carreteras insulares y de interés regional.

II.2.5)Award criteria

Criteria below

Quality criterion - Name: Memoria descriptiva / Weighting: 40

Cost criterion - Name: Medioambiental / Weighting: 10

Cost criterion - Name: Mejora / Weighting: 20

Cost criterion - Name: Precio / Weighting: 30

II.2.6)Estimated value

Value excluding VAT: 506 910.24 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 36

This contract is subject to renewal: no

II.2.10)Information about variants

Variants will be accepted: no

II.2.11)Information about options

Options: yes

Description of options:

Prorrogas anuales hasta un máximo de dos años permaneciendo inalterables las características del contrato durante el período de duración del número de prórrogas. De conformidad con el apartado 26 del Cuadro de Características Particulares del PCAP.

II.2.13)Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation

III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers

List and brief description of conditions:

Capacidad de obrar

No prohibición para contratar

No estar incurso en incompatibilidades

Cumplimiento con las obligaciones con la Seguridad Social

Cumplimiento con las obligaciones tributarias

III.1.2)Economic and financial standing

List and brief description of selection criteria:

Cifra anual de negocio

III.1.3)Technical and professional ability

List and brief description of selection criteria:

- Otros

III.2)Conditions related to the contract

III.2.2)Contract performance conditions:

Consideraciones de tipo medioambiental. Descripción: De conformidad con la cláusula 27 del pliego de cláusulas administrativas particulares

Consideraciones de tipo social. Descripción: De conformidad con la cláusula 27 del pliego de cláusulas administrativas particulares

Section IV: Procedure

IV.1)Description

IV.1.1)Type of procedure

Open procedure

IV.1.3)Information about a framework agreement or a dynamic purchasing system

IV.1.8)Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: no

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 07/02/2022

Local time: 19:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Spanish

IV.2.6)Minimum time frame during which the tenderer must maintain the tender

Duration in months: 4 (from the date stated for receipt of tender)

IV.2.7)Conditions for opening of tenders

Date: 15/03/2022

Local time: 09:00

Place:

Palacio Insular

Datos de Dirección:

Calle: Plaza de España, nº1

CP: 38001

Población: Santa Cruz de Tenerife

País: España

Information about authorised persons and opening procedure:

Descripción:

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no

VI.3)Additional information:

VI.4)Procedures for review

VI.4.1)Review body

Official name: TRIBUNAL ADMINISTRATIVO DE CONTRATOS PÚBLICOS DE LA COMUNIDAD AUTÓNOMA DE CANARIAS
Postal address: Edificio Usos Múltiples II, planta 6ª. Avda. José Manuel Guimerá, 10
Town: Santa Cruz de Tenerife
Postal code: 38003
Country: Spain
E-mail: tribunalcontratos.hacienda@gobiernodecanarias.org
Telephone: +34 922951375

VI.5)Date of dispatch of this notice:

03/01/2022




Permalink

Indra Sistemas SA from  Alcobenda (Madrid) secured the EUR3.16 million contract, excluding VAT, to provide operation and maintenance services for the Road Information Center (CIC) and its dependent systems and facilities installed in some tunnels and roads on the island of Tenerife.. Contact Consejo de Gobierno Insular del Cabildo Insular de Tenerife,  Santa Cruz de Tenerife, tel +34 901501901, fax +34 922239704, email licitaciones@tenerife.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=301366-2022. Ref.n. C-1468/2021. 23/22. 



Permalink


Ekia Ingenieros SA from Las Rozas, Madrid, secured the EUR203,696.45 contract, excluding VAT, for provision of safety management of tunnel operations on Tenerife Island and its regional interest roads. Contact Consejo de Gobierno Insular del Cabildo Insular de Tenerife,  Santa Cruz de Tenerife, tel +34 901501901, fax +34 922239704, email licitaciones@tenerife.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=478541-2022. Ref.n. C-1467/2021. 37/22. 



Permalink


Open invitation to tender, deadline 18/10/2022, for maintenance services of the medium and low voltage electrical installations and lighting of the roads and tunnels of the Cabildo de Gran Canaria.  For tender documents, please click here. The contract value will be EUR9.12 million, excluding VAT, with a 48 months duration.  Contact Consejo de Gobierno Insular del Cabildo Insular de Tenerife,  Las Palmas de Gran Canaria, tel +34 928219421, fax +34 928217036, email contratacion@grancanaria.com . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=515341-2022. Ref.n. XP0373/2022. 39/22. 

 

Spain-Las Palmas de Gran Canaria: Maintenance services of public-lighting installations and traffic lights

2022/S 182-515341

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Consejo de Gobierno Insular del Cabildo de Gran Canaria
National registration number: P3500001G
Postal address: Bravo Murillo, 23 Entreplanta
Town: Las Palmas de Gran Canaria
NUTS code: ES70 Canarias
Postal code: 35002
Country: Spain
Contact person: Consejo de Gobierno Insular del Cabildo de Gran Canaria
E-mail: contratacion@grancanaria.com
Telephone: +34 928219421
Fax: +34 928217036
Internet address(es):
Main address: http://www.grancanaria.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=mUbnaaB53bIQK2TEfXGy%2BA%3D%3D
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=t8%2BMIeV8qXF7h85%2Fpmmsfw%3D%3D
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
Electronic communication requires the use of tools and devices that are not generally available. Unrestricted and full direct access to these tools and devices is possible, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=mUbnaaB53bIQK2TEfXGy%2BA%3D%3D
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Contrato de Servicios para la ejecución de operaciones de mantenimiento y conservación de las instalaciones eléctricas de media y baja tensión y alumbrado de las carreteras y túneles del Cabildo de Gran Canaria

Reference number: XP0373/2022
II.1.2)Main CPV code
50232000 Maintenance services of public-lighting installations and traffic lights
II.1.3)Type of contract
Services
II.1.4)Short description:

Contrato de Servicios para la ejecución de operaciones de mantenimiento y conservación de las instalaciones eléctricas de media y baja tensión y alumbrado de las carreteras y túneles del Cabildo de Gran Canaria

II.1.5)Estimated total value
Value excluding VAT: 9 119 500.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES705 Gran Canaria
Main site or place of performance:

Ver apartado D5 del cuadro de características del PCAP. .

II.2.4)Description of the procurement:

Contrato de Servicios para la ejecución de operaciones de mantenimiento y conservación de las instalaciones eléctricas de media y baja tensión y alumbrado de las carreteras y túneles del Cabildo de Gran Canaria

II.2.5)Award criteria
Criteria below
Quality criterion - Name: Mejoras propuestas / Weighting: 10
Quality criterion - Name: Propuesta técnica del servicio / Weighting: 40
Cost criterion - Name: Oferta económica / Weighting: 50
II.2.6)Estimated value
Value excluding VAT: 9 119 500.00 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 48
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:

Ver apartado D3) del cuadro de características del PCAP

II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:

Capacidad de obrar

Otros Capacidades: Clasificación Potestativa: Grupo P. Servicio Subgrupo 1 Mantenimiento y reparación de equipos e instalaciones eléctricas y electrónicas. Categoría 5

III.1.2)Economic and financial standing
List and brief description of selection criteria:

Cifra anual de negocio



Permalink

Spain, Andalusia - es/63

Sewage

South sewer in Ronda including a 1.5-km tunnel between Los Baí±os írabes and La Dehesa to be tendered by Confederacií³n Hidrogrí¡fica del Sur for Ptas800 million. Visit www.chse.es and www.mma.es 42/01.Open call for tenders, deadline 13th January, 2005 for construction of the south sewer in Ronda, from the old treatment plant to the future one. The project includes two tunnels, approximately 1.1 km and 200 m in length and 3 m in diameter, to be built in rock using a roadheader. Estimated cost: EUR9.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=181848-2004, OJ S 212, or contact Ministry of environment, Madrid, fax +34 915975912. E-mail mgiral@mma.es. Subscribe to E-News Weekly 46/2003. 51-52/04.Open call for tenders, deadline 3rd February, 2005 for work control and management of the south sewer in Ronda. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=206006-2004, OJ S 239, or contact Ministry of environment, Madrid, fax +34 915975912. E-mail mgiral@mma.es 51-52/04.Sogeosa, Alvar Gonzalez and Proyectos Tecnicos y Obras Civiles secured a EUR7.5 million contract for construction of the south sewer in Ronda. The project includes two tunnels, approximately 1.1 km and 200 m in length and 3 m in diameter. Visit www.sogeosa.es 36/05.Incisa scooped a EUR408,000 contract for work control and management of the south sewer in Ronda. 36/05.



Permalink

Spain, Asturias - es/62

Highway

Open invitation to tender, deadline 26th October, 2001, for engineering design of Ballota-Cadavedo section of A8 motorway including one tunnel. Contact Ministry of Works, Madrid, fax +34 91 5978537. Visit www.boe.es 41/01.A EUR838,260 contract has been awarded to Fulcrum and Incosa to manage construction and control works of the Ballota-Cadavedo section on the Cantabrian highway A-8 in Asturias. This 5.6 km section includes a 200 m-long twin cut-and-cover tunnel in El Ribon. Subscribe to E-News Weekly 5/2004, 48/2003 and 39/2003. Visit www.fulcrum.es and www.incosa.net 28/04.Open call for tenders, deadline 28th December, 2005 for construction of section Grado west-Doriga on highway A-63 Oviedo-La Espina. This 4.2 km section includes the El Fresno tunnel, a twin bored tunnel. The left roadway tunnel is 949 m long (904 m mined and 45 m in cut-and-cover) and the right roadway tunnel is 923 m long (878 m mined and 45 m in cut-and-cover). Both are characterised by an approx. 0.6% gradient. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=231896-2005, OJ S 235, or contact the Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 50-51/05.Open call for tenders, deadline 30th June, 2006 for work control and inspection during construction of section Grado west-Doriga on highway A-63 Oviedo-La Espina. This 4.2 km section includes the El Fresno tunnel, consisting of a left roadway tunnel (949 m) and right roadway tunnel (923 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098653-2005, OJ S 92, or contact the Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 22/06.Acciona received a EUR63.3 million contract to construct section Grado west-Doriga on highway A-63 Oviedo-La Espina. This 4.2 km section includes the El Fresno tunnel (920 m and 950 m) and a 1.7 km branch. Visit www.acciona.es 23/06.Open call for tenders, deadline 4th September, 2006 for construction of section Las Duenas-Muros del Nalon on the Cantabrian motorway A-8. The north carriageway spans 8,050 metres while the south carriageway has a length of 8,070 metres. The section includes three twin-tube tunnels, totalling over 1.200 metres. On the first seven kilometres, each roadway carries two 3.5 m-wide lanes and shoulders (2.5 m and 1 m). They are separated by a septum of four metres. The last kilometres carries three lanes. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=114304-2006, OJ S 107, or contact SEITT, Madrid, fax +34 915916630. E-mail jmdorrego@seitt.es 24/06.Open call for tenders, deadline 4th September, 2006 for on-site supervision during construction of section Las Duenas-Muros del Nalon on the Cantabrian motorway A-8. The section includes three twin-tube tunnels, totalling over 1,200 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=128203-2006, OJ S 120, or contact Ministry of public works, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@mfom.es 29/06.FCC received a EUR95.3 million contract for construction of section Las Duenas-Muros del Nalon on the Cantabrian motorway A-8. The north carriageway spans 8,050 metres while the south carriageway has a length of 8,070 metres. The section includes three twin-tube tunnels, totalling over 1.200 metres. Visit www.fcc.es 48/06.Iberinsa secured a EUR1.5 million contract for site supervision during construction of the Las Duenas-Muros del Nalon section on the Cantabrian motorway A-8. Three twin-tube tunnels, totalling over 1,200 metres, will be built. Visit www.iberinsa.es 01-02/07.Open call for tenders, deadline 6th November, 2007 for construction of the Unquera-Pendueles section on the Cantabrian motorway A-8. This 11.8 km section includes the Santiuste tunnel, to be built in rock using NATM, with lengths of 520 metres (seaside tube) and 820 metres (hillside tube), and the 410 m El Peral cut-and-cover tunnel between road N-634 and the FEVE railway. In compliance with the Royal Decree 635/2006, the two tunnels will be equipped with emergency exits; drainage of toxic liquids; CCTV; automatic and manual system for smoke extraction; normal, safety and emergency lighting; ventilation; emergency generators; uninterrupted energy supply system; CO sensors; opacimeters; fire detection cables; automatic incident detection; signage of exits and emergency equipment; horizontal and vertical signage; variable message panels; closing barriers and traffic lights at the portals; loudspeakers; SOS stations; hydrants; and flowmeters. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234622-2007, OJ S 193, or contact Ministry of development, Madrid, fax +34 915978537 or 915978470. E-mail cpublic@fomento.es 42/07.FCC and Alvargonzí¡lez received a EUR106.8 million contract to build the Unquera-Pendueles section on the Cantabrian motorway A-8. This 11.8 km section includes the Santiuste tunnel (520 m / 820 m), and the 410 m El Peral cut-and-cover tunnel. Click es/62 for more. Visit www.fcc.es 12/08.Euroconsult bagged a EUR1.6 million contract to supervise the construction of the 11.8 km Unquera-Pendueles section on the Cantabrian motorway A-8, including the Santiuste tunnel (520 m / 820 m), and the 410 m El Peral cut-and-cover tunnel. Visit www.euroconsult.es 36/08.



Permalink


SICE-Collosa Joint Venture from Valladolid bagged the EUR 8.47 million contract, excluding VAT, for the adaptation to RD 635/2006  of  El Carmen (100 m), Llovido (450 m), Tenanzos (500 m), Ordovícico del Fabar (1500 m), Arena de Morí (265 m) and Duesos (149 m) tunnels on the Cantabrian motorway A-8. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, email dgc.licitaciones@fomento.es. For further information on the tender click here Ref.n. 254193361100. 48/20. 



Permalink


Open invitation to tender, deadline 08/02/2022, for the control and supervision during upgrading of the tunnels Angel Uriel (300 m) and El Padrun (1782 m) on the A-66. For tender documents, click here. Value of the contract will be EUR397,198.20, excluding VAT. Duration of the contract is 29 months. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax  +34 915978547, email dgc.licitaciones@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=674956-2021. Ref.n. 230213362300. 01/22.

 


Spain-Madrid: Consultative engineering and construction services

2021/S 255-674956

Contract notice

Services

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Dirección General de Carreteras
National registration number: S2817015G
Postal address: Paseo de la Castellana 67 - Despacho B750
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28071
Country: Spain
Contact person: Dirección General de Carreteras
E-mail: dgc.licitaciones@fomento.es
Telephone: +34 915978341
Fax: +34 915978547
Internet address(es):
Main address: http://www.fomento.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=bbqeQ9uN6YE%3D

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

PYO 501/22 Control y vigilancia de adecuación de túneles Ángel Uriel y Padrún Provincia de Asturias. Plan de recuperación transformación y resiliencia financiado por Unión Europea Next Generation EU

Reference number: 230213362300

II.1.2)Main CPV code

71310000 Consultative engineering and construction services

II.1.3)Type of contract

Services

II.1.5)Estimated total value

Value excluding VAT: 397 198.20 EUR

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.3)Place of performance

NUTS code: ES12 Principado de Asturias

II.2.6)Estimated value

Value excluding VAT: 397 198.20 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 29

This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 08/02/2022

Local time: 19:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:

27/12/2021




Permalink


Open invitation to tender, deadline 23/09/2022, for the adaptation project for the AP-66 motorway tunnels by Royal Decree 635/2006. For  tender documents, please click here. Value of the contract is EUR 81.12 million, excluding VAT. Duration of the contract will be 41 months. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547,  email dgc.licitaciones@fomento.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=451732-2022. Ref.n. 254223364200. 37/22 

 

Spain-Madrid: Construction, foundation and surface works for highways, roads


2022/S 159-451732

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Dirección General de Carreteras
National registration number: S2817015G
Postal address: Paseo de la Castellana 67 - Despacho B750
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28071
Country: Spain
Contact person: Dirección General de Carreteras
E-mail: dgc.licitaciones@fomento.es
Telephone: +34 915978341
Fax: +34 915978547
Internet address(es):
Main address: http://www.fomento.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=bbqeQ9uN6YE%3D
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


52-O-6420; 54.674/22 Proyecto de adecuación de los túneles de la Autopista AP-66 al Real Decreto 635/2006. Plan de Recuperación, Transformación y Resiliencia financiado por la Unión Europea NEXT GENERATION EU.


Reference number: 254223364200
II.1.2)Main CPV code
45233000 Construction, foundation and surface works for highways, roads
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 81 120 074.99 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES120 Asturias
II.2.6)Estimated value
Value excluding VAT: 81 120 074.99 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 41
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 23/09/2022
Local time: 15:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
16/08/2022



Permalink

Spain, Huesca - es/61

Motorway

Open invitation to tender, deadline 10th October, 2001, for engineering design for Aragon motorway link between N-330 and N-121, including tunnels. Contact Ministry of Works, fax +34 91 597 8536 or visit www.boe.es 41/01. Open call for bids, deadline 18th September, 2002 for construction of a Pyrenean trunk road between Sabií±í¡nigo and Fiscal in Aragon. Includes two tunnels (2,598 m and 164 m). Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=117424-2002, OJ S 148, or contact Ministry of development, Madrid, fax +34 915978537. E-mail cpublic@mfom.es 33/02. The ministry of development has awarded to a JV formed by Constructora Pirenaica and Vialex Roldí¡n Constructora Aragonesa a €59.7 million contract to build section Sabií±í¡nigo-Fiscal on the Pyrenean trunk road N-260. This new road will link the Alto Gí¡llego and Sobrarbe counties, shortening travel time by 20 minutes and the distance by 29 km. The 23.2 km road will cross the Pedralba hill with a 2,598 m tunnel. There will be refuges every 370 metres and a rescue tunnel under the carriageway accessible by vehicles. There will also be a 163 m tunnel, three bridges and five viaducts. Time frame for construction: three years and two months. Visit www.copisa.com 06/03.Open call for bids, deadline 7th October, 2003 for work supervision during construction of the Sabií±í¡nigo-Fiscal section, including two tunnels (2,598 m and 164 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=130081-2003, OJ S 143, or contact Ministry of development, Madrid, fax +34 915978537 or 8470. E-mail plicas-carreteras@mfom.es 33/03.Prointec secured a EUR1.9 million contract for construction management and work control of the Sabií±anigo-Fiscal section on road N-260 in Catalonia, including two tunnels of 2,598 m and 164 m. Visit www.prointec.es 11/04.Open invitation to tender, deadline 26.02.2009, for dualling of 3,856 m of N330 including construction of second tube for 2,885 m-long Caldearenas tunnel together with crosspassages, to form part of A23 motorway in Huesca province. Contract value EUR100 million, duration 40 months. Specs and docs from Centro de Publicaciones del Ministerio de Fomento, Madrid, e-mail cpublic@fomento.es, fax +34 915978470. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=337793-2008. 02/09.



Permalink

Copisa Constructora Pirenaica e Vialex Roldan Constructora Aragonesa secured the EUR18.4 million contract for the complementary work, including tunnel equipment, for the Sabinanigo-Fiscal section of the Pyrenean trunk road N-620 from Sabinanigo to France Border (Port Bou). Contact Fomento, Madrid, tel +34 915978-341, fax -547, e-mail calgaba@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=329475-2011. 43/11.



Permalink

FCC Construccion SA secured the EUR13.1 million contract for the connection of the start of the Arguis-Alto de Monrepos section on autovia Mudejar A23 with the Tunnel Control Centre, and for the equipment upgrading of the 1.5 km-long Alto Aragon n.1 tunnel. Contact Direccion General de Carreteras, Madrid, tel +34 915978341, fax +34 915978547, e-mail jgcid@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399917-2013. Ref. n. 12-HU-5711. 49/13.



Permalink

Spain, Basque Region - es/60

Motorway

A1 motorway between Vitoria-Gasteiz and Eibar requires 11 m-diameter twin-tube NATM tunnels using bolts, mesh, steel arches and sprayed concrete. Lezarri 1.22 km and Gallastegi 2.34 km are in sandstone, flysch and limestone, and 12.5 m-diameter Eitza 720 m-long in black siltstone, grey calcareous sandstone, volcanic and basalt rock. Design by Prointec, construction by jv of Moyua/Murias/Galdiano/Altuna y Uria for completion October, 2002. Visit www.prointec.es October 2000. Open invitation to tender, deadline 14th June, 2001, for design/build contract for the Arlaban-Eskoriataza motorway in the Basque country, including several tunnels for DTC, fax +34 943 429417. Visit www.boe.es 23/01. Open invitation to tender, deadline 9th July, 2001, for engineering supervision of Basque motorway section Arlaban-Eskoriataza including two NATM tunnels length 3.3 km and 360 m for DTC, San Sebastian, fax +34 943 429417. Visit www.mma.es 25/01. Preannouncement of requirement for technical assistance for construction of Arrasate Norte to Bergara Sur section of Vitoira to Vitoria-Gasteiz to Eibar motorway with 1.16 km-long tunnel for DTC, fax +34 94 343 9417. Visit www.boe.es 40/01. Open tendering, deadline 10th December, 2001, for subsection south of the Arrasate Norte-Bergara Sur section of the Vitoria Gasteiz-Eibar highway including the Ikastaundi tunnel, 2 x 1,150 m-long, 112 sq m. Drill/blast in shales and limolites. Support using anchoring bolts, wiremesh, and shotcrete as well as TH-29 steel supports on 25% of the length. Cost of Ptas440 million financed by the Guipuzkoa Province government. Design by Fulcrum. Work to start mid-February, 2002. Time frame of 30 months. Visit http://ted.eur-op.eu.int, document S 217-148991 or contact Diputacií³n Foral de Guipuzkoa, San Sebastian, fax +34 94 3429417. 48/01. A jv of Construcciones Moyua, Construcciones Murias, Construcciones Altuna y Uria, and Construcciones Galdiano has been chosen to build subsection south of the Arrasate north-Bergara south section of Vitoria Gasteiz-Eibar motorway. Includes the 2 x 1,150 m Ikastaundi tunnel. Contract value €40.6 million. Visit www.muriasgrupo.com and www.galdiano.com 25/02. Open call for bids, deadline 14th July, 2003 for equipment of three double tunnels on the Arrasate-Bergara north section of the Vitoria-Gasteiz - Eibar highway: San Marcial (1,490 m + 1,515 m), Aristi (2 x 370 m) and Ikastaundi (1,590 m + 1,607 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=090145-2003, OJ S 101, or contact Diputacií³n Foral de Guipuzkoa, Donostia-San Sebastií¡n, fax +34 943429417. E-mail lareitio@garraioa.gipuzkoa.net 23/03. Open invitation to tender, deadline 28th November, 2003 for technical assistance to the design of section Eskoriatza north-Arrasate north on highway A-1. Three twin-tube tunnels will be built: Apotxaga (340 m / 370 m), Iruzieta (220 m / 233 m) and Gurutzetxiki (681 m / 699 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=182207-2003, OJ S 202, or contact Agencia guipuzcoana de infraestructuras, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net. Also visit www.gipuzkoa.net/concursos 44/03.Open invitation to tender, deadline 28th November, 2003 for technical assistance as part of the follow-up, checking and reporting prior to the work supervision of section Eskoriatza north-Arrasate north on highway A-1. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=182208-2003, OJ S 202, or contact Agencia guipuzcoana de infraestructuras, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net. Also visit www.gipuzkoa.net/concursos 44/03. Open call for bids, deadline 6th April, 2004 for construction of the Arlaban-Eskoriatza north section of highway Vitoria-Gasteiz - Eibar. This section includes the Arlaban twin-tube tunnel, 3.3 km in length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=032277-2004, OJ S 37, or contact Bidegi, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 12/04. The six JVs bidding for the construction of the Arlaban-Eskoriatza section of motorway A-1 that will link Eibar to Vitoria are: ACS Dragados / Excavaciones Vda. de Sainz / Urssa; Necso / Excavaciones Orsa; FCC / Gedi / Construcciones Sukia / Asfaltos Naturales de Campezo / Obras Subterraneas; Construcciones y Promociones Balzola / Corsan-Corviam / Nortunel; Ferrovial Agroman / Construcciones Sobrino; and Construcciones Moyua / Altuna y Uria / Construcciones Galdiano / Construcciones Amenabar. This 10 km section will be the costliest road infrastructure in Gipuzkoa province with EUR205 million. It includes the 3,377 m Arlaban tunnel, the 400 m Zarimutz tunnel and five viaducts. To avoid any delay, the Gipuzkoa province will fine the builders. The contract stipulates that every day behind schedule, the builders will pay a EUR200,000 fine, which is EUR6 million a month. Construction will start in July for completion at end-2007. 20/04.Open call for bids, deadline 18th June, 2004 for construction management of the Arlaban-Eskoriatza north section of motorway Vitoria-Gasteiz - Eibar. This section includes the 3,377 m Arlaban tunnel and the 400 Zarimutz tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=078214-2004, OJ S 98, or contact Bidegi, Donostia-San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 22/04.Ferrovial Agroman and Construcciones Sobrino will build the Arlaban-Eskoriatza section on the Eibar-Vitoria highway, for EUR191 million. Time frame: 34 months. This 10.48 km section includes the 2 x 3,377 m Arlaban tunnel, which will be the longest tunnel of the Basque region, and the 2 x 400 m Zarimutz tunnel. Visit www.ferrovial.es 38/04.Open call for bids, deadline 12th November, 2004 for quality management testing during construction of section Arlaban-Eskoriatza north on the Eibar-Vitoria highway. This 10.5 km section includes the 2 x 3,377 m Arlaban tunnel and the 2 x 400 m Zarimutz tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=159985-2004, OJ S 188, or contact Bidegi, San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 41/04.Open call for bids, deadline 10th May, 2007 for installation work of the safety equipment in the 2 x 3.4 km Isuzkitza (former Arlaban) tunnel and the 2 x 400 m Zarimutz tunnel on the Arlaban-Eskoriatza North section on the Eibar-Vitoria motorway. Click here. Read E-News Weekly 16/2007 & 11/2007. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=82820-2007, OJ S 68, or contact Bidegi, San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 16/07.Open call for bids, deadline 10th May, 2007 for installation work of the safety equipment in the three tunnels on the Eskoriatza North-Arrasate North section on the Eibar-Vitoria motorway. These tunnels are Apotxaga (340 m / 370 m), Iruzieta (220 m / 233 m) and Gurutzetxiki (681 m / 699 m). Read E-News Weekly 34/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=82821-2007, OJ S 68, or contact Bidegi, San Sebastian, fax +34 943210137. E-mail bidegi@bidegi.net 16/07.Elektra, Indra Sistemas and Ikusi Angel Iglesias received a EUR18.8 million contract for installation work of the safety equipment in the 2 x 3.4 km Isuzkitza (former Arlaban) tunnel and the 2 x 400 m Zarimutz tunnel on the Arlaban-Eskoriatza North section on the Eibar-Vitoria motorway. Visit www.elektra-sa.es, www.indra.es and www.ikusi.es 25/07.Acisa, Emte and Construcciones Amenabar bagged a EUR6.5 million contract for installation work of the safety equipment in the three tunnels on the Eskoriatza North-Arrasate North section on the Eibar-Vitoria motorway. These tunnels are Apotxaga (340 m / 370 m), Iruzieta (220 m / 233 m) and Gurutzetxiki (681 m / 699 m). Visit www.acisa.es and www.grupemte.com 25/07.



Permalink

Spain, Navarre - es/59

Highway

Open tendering for technical assistance for the Arce-Oroz Betelu stretch of the Itoiz-Garralda variant of road NA-2040, including an 840 m tunnel to cross Mount Carrovide using drill/blast, roadheader or hydraulic hammer. Visit www.cfnavarra.es/obraspublicas 41/01. Preinformation notice for the construction of the Itoiz-Garralda highway including a 740 m tunnel. Tender value €12.6 million. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 105, document 82829-2002 or contact Gobierno de Navarra, Pamplona, fax +34 948423433. 24/02. Open call for bids, deadline 4th November, 2002 for construction of the road NA-2040 bypass in Itoiz-Garralda, section Arce - Oroz-Betelu, including a 740 m tunnel. Tender value €10.2 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=152178-2002, OJ S 193, or contact Navarre government, Pamplona, fax +34 948423433 or 948427549. Also visit www.cfnavarra.es/obraspublicas More in E-News Weekly # 35. 41/02.Award to ACS of a €8.4 million contract to build a 3.1 km road bypass in Itoiz-Garralda, section Arce-Oroz Betelu. The job requires a 740 m-long tunnel. Visit www.grupoacs.com 05/03.



Permalink

Spain, - es/58

Malaga - Light Rail

Malaga - es/58Light RailOpen invitation to tender, deadline 17th September, 2001, for preliminary engineering of Malaga metro for GIASA, fax +34 95 5007477. Visit www.giasa.com 36/01. Open invitation to tender, deadline 15th October, 2001, for engineering design of Las Pedrizas section including tunnels. Contact Ministry of Works, fax +34 91 597 8536. Visit www.boe.es 39/01. Nine bids presented for the preliminary design of the five light rail lines in Malaga: Urbaconsult, Cener; UBS, Estudio Pereda, Geocontrol; Ghesa, TRN, Cemosa; Inocsa, BB & Consult; Ineco, Narval, Metropolitana Milanese; Consultrans, Aepo; Omicron, Idom, Semaly; Typsa; and Prointec. Total length of light rail network will be 28 km, of which 23% in tunnels. Cost around Pta64 billion, of which Pta50 billion for infrastructure. Commissioning scheduled for 2005. 41/01. Design of light rail network awarded to jv of VS Ingenierí­a, Geocontrol, and Estudios Pereda-4 for Euro1.1 million. Time frame of one year. Assignment consists in corfirming the proposed five lines: Paseo de los Tilos-Teatinos, Carretera de Cí¡diz-Teatinos, Centro-Ciudad Jardí­n, Centro-Suí¡rez, and El Palo-Muelle Heredia, and determining the route alignments. Visit www.giasa.com 46/01. Several contenders are to compete for the privately-financed project, 23% of which will run underground. To date, the two known teams are: FCC, Automí³viles Portillo and CETSA; ACS and Alsina Graells. Project valued at €400 million. 13/02. The preliminary studies for the city's light rail lines have been presented. The 22 km network will run 50% below the surface. Four lines: Line 1 Teatinos-Malagueta, Line 2 Carretera de Cí¡diz-Malagueta, Line 3 Malagueta-El Palo and Line 4 Avenida de Andalucí­a-Ciudad Jardí­n. Six alignment options for Line 1, two for Lines 2 and 3 and three for Line 4. The €250 million first phase (Lines 1 and 2) totals 10 km (half in tunnel). Construction start expected in 2004 for completion scheduled in 2007-2008. Second phase (Line 3) is estimated at €98-115 million and phase 3 should cost €106-119 million. Phase The project is now entering in the public inquiry phase. Overall cost of €530 million. 25/02.Core drilling contract awarded to Cemosa for €21,454. Work has commenced in 28 different locations throughout the city to determine the route alignment of the first two lines which will link Teatinos and La Malagueta and La Malagueta and the Martí­n Carpena Sport Complex. 48/02.Open call for tenders, deadline 14th April, 2004 for design, construction, acquisition of the rolling stock and operation under concession during 35 years of Lines 1 and 2 of Malaga's light rail. Budget: €374.2 million plus €19.2 million for putting underground Line 1 in Teatinos. Infrastructure cost: €280.5 million. Line 1 goes from La Malagueta to Teatinos (7.2 km) and has 12 stops. Line 2 goes from La Malagueta to Martí­n Carpena (6.3 km) and has 10 stops. 75% of the lines will run underground, at an average depth of 7 to 13 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194047-2003, OJ S 216, or contact Junta de Andalucí­a, fax +34 955058047 or 7465. E-mail consejeria.copt@juntadeandalucia.es. Read E-News Weekly 3/2003. 47/03.Open call for bids, deadline 9th March, 2004 for technical assistance during inspection of the buildings near the alignment of Lines 1 and 2 of Malaga's light rail. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=012781-2004, OJ S 15, or contact Ferrocarriles Andaluces, Seville, fax +34 55007573. E-mail maryam.ferreras@ferrocarrilesandaluces.com. Click es/58. 06/04.Open call for bids, deadline 12th March, 2004 for design of Line 3 of the city's light rail. This 6,970 m line between La Malagueta and El Palo will run totally underground. Tender budget: EUR2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=017229-2004, OJ S 20, or contact Ferrocarriles Andaluces, Seville, fax +34 955007573. E-mail maryam.ferreras@ferrocarrilesandaluces.com 07/04.The four JVs to build and operate the two light rail lines are: Ferrovial, Necso, Inabensa and Sener (two offers of EUR456.8 and EUR390 million); Dragados and CAF (three offers of EUR503, EUR519.6 and EUR523 million); Sacyr in JV with GEA-21, Udisa and Pamasa with two offers of EUR398.7 and EUR363.6 million; and Metromar, a consortium including FCC, Comsa, Azvi, Construcciones Sando, Vera and Cajamar, who submitted two offers (EUR403 million and EUR360.7 million).Commissioning dates range from October 2007 for the Dragados-led consortium and February 2009 for the consortium headed by FCC.The two lines span 13 km, whereof 80% will run below ground, and include 22 stops, a joint head station in La Malagueta and end stations in Teatinos for Line 1 and in Jose Maria Martin Carpena Sport Complex on Line 2. 20/04. The design of Line 3 of Malaga's light rail has been awarded by the Andalusian government to a JV of Typsa and Jose Segui for EUR1.6 million and a time frame of 12 months. The line will start at La Malagueta, which is also the start point for Lines 1 and 2, to reach El Palo, running below ground in 5.47 km of tunnel with stations in Sancha, Sorolla, Banos del Carmen, Pedregalejo, Mercado and El Palo. The design study will determine the exact alignment and its technical characteristics as well as the tunnelling method, either cut-and-cover or TBM, and what TBM type will be used if eventually the project is TBM-driven. The study will also specify the connecting areas and analyse the possible interactions of tunnelling on surrounding buildings. The JV will also elaborate a geotechnical study. Visit www.typsa.es 24/04. Andalusia's government has awarded to consortium Metromar formed by FCC, Comsa, Construcciones Sando, Azvi, Construcciones Vera and bank Cajamar have secured the construction and operation for 30 years of Lines 1 and 2 of the Malaga light rail, for EUR403.7 million. The two lines span 13.6 km forming a Y-shaped network, with a joint leg in the city centre totalling 2 km from La Malagueta to Guadalmedina. Twenty-two stations will be built in total, at depths varying from 15.7 m at Carlos Haya and Cruz de Humilladero to at grade. Construction will commence in November 2005 to complete in February 2009. Prior to work start, remaining tasks include project design and review, contract signing, land acquisition and establishment of the operating company. Financing by the government of Andalusia (75%) and the city of Malaga (25%).The 7.2 km Line 1 will run entirely underground from La Malagueta to Manuel Dominguez Avenue, where it exits at grade. There will be underground stations in La Malagueta, Plaza de la Marina, Guadalmedina, Solidaridad, Cruz de Humilladero, Juan XXIII, Carlos Haya, and La Barriguilla. Then, the line serves three surface stations in Ciudad de la Justicia, Universidad and Hospital Clinico before reaching underground the final destination in Teatinos. A 8.8 m-diameter TBM will excavate the leg shared by both lines from La Malagueta to Guadalmedina and the Guadalmedina-La Barriguilla branch.The 6.4 km route followed by Line 2 also travels below ground except between Cadiz Road and the line head in Martin Carpena. Underground stations will be built at Renfe railway station, Heroes de Sostoa, Huelin, Delicias, Guindos, and Puerta Blanca in addition to those shared with Line 1. The Line 2 branch will be built with the cut-and-cover method. Visit www.metrodemalaga.info and www.fcc.es 30/04.Open call for bids, deadline 28th September, 2004 for supervision and work control during construction of Malaga's light rail lines 1 and 2. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=133826-2004, OJ S 154, or contact Ente Publico de Gestion de Ferrocarriles Andaluces, Seville, fax +34 955007573. E-mail maryam.ferreras@ferrocarrilesandaluces.com 36/04.Cemosa secured a EUR420,000 contract for technical assistance during inspection of the buildings near the alignment of Lines 1 and 2 of Malaga's light rail. Visit www.cemosa.es 23/05.



Permalink

Spain, Catalonia - es/57

Highway

Second 5.23 km-long x 95 sq m parallel tube in design for Central Pyrenees N230 highway from Toulouse to Lerida. 13.75 m-wide x 8.2 m-high, for three-lane traffic, with pedestrian connections to existing tunnel every 400 m. Drill/blast in Paleozoic rocks, granite, slate, quartzite and sandstone, with rockbolts, mesh and shotcrete support. Value $130 million. Tenders expected 2001 for completion 2005. Visit www.idom.es 04/01. Open invitation to tender, deadline 14th September, 2001, for construction of 5 km-long road tunnel for Ministerio de Fomento, Madrid. Visit www.boe.es 36/01. Invitations to tender expected for three-year construction of $120 million, 9.5 km-long motorway section including four twin-tube tunnels of lengths 163 m, 394 m, 258 m, and 1.2 km. Visit www.boe.es 38/01. Tenders invited for consulting and assistance for the dualling of the 5.2 km Viella tunnel in Lérida. Value of €4 million. Deadline 1st February, 2002. Visit http://ted.eur-op.eu.int, document S 246-169590. 01/02. Award to a jv of OHL, Comsa, and Copcisa of the dualling of the Vielha tunnel in Lleida for €128 million. Bored length totals 5,059 metres, 106.25 sq m cross section. Also a 165 cut-and-cover portion, 5 m-high x 13.41 m-wide. Drill/blast method. Support with shotcrete, mesh, rockbolts and steel arches. The project also includes 120 m-long cross passages to the existing tube every 400 metres, a service tunnel, refuges, safety niches, restructuring the accesses, installing equipment within the tunnel, ventilation facilities at each portal, as well as a management and operation building at the north portal. Time frame of 39 months with start in September, 2002 and completion in March, 2005. Doubling the tunnel is urgent since safety in the existing tube, also known as Alfonso XIII, scored 'very bad' in a survey published in April, 2000 by the international tourism alliance and the international motoring federation. Visit www.ohl.es 05/02.Sener have been awarded a €3.6 million contract for work supervision of the 5 km Vielha tunnel. Visit www.sener.es. 31/02.Open call for tenders, deadline 14th September, 2007 for draft design for conversion to motorway of the Vielha tunnel-French border section of road N-230 in Aran Valley. The west alternative includes seven tunnels totalling nine kilometres, the longest of which would be five kilometres in length. More details in E-News Weekly 51/2003 & 5/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142852-2007, OJ S 116, or contact Ministry of Development, Madrid, fax +34 915978536 or 915978470. E-mail randujar@fomento.es or cpublic@fomento.es 29/07.Indra pocketed a EUR4.6 million contract to supply and install safety and control systems in the Juan Carlos I tunnel in Viella in Lerida province. The new tunnel, located on the Vilaller-Viella section of trunk road N-230, will be equipped with the most modern safety and control systems, including signage, video monitoring, video detection, telephone and videoconference, IP communication network, fire detection, radio communication, SOS stations and ventilation and lighting control. Indra will also supply the systems for the control centre, both for the new and old tunnels. With three lanes, one of which will be reversible, the new tunnel will solve safety problems in the existing tunnel, which is bidirectional and carries two very narrow lanes. The two parallel tunnels will be cross-connected by 12 escape galleries. Click here and here. Visit www.indra.es 36/07.Open invitation to tender, deadline 03.03.2009, for 16 month contract to equip new 5,230 m-long Vielha Juan Carlos I tunnel on N-230 highway in Lleida province, value EUR16,352,192. Specs and docs from Ministerio de Fomento, Madrid, e-mail cpublic@fomento.es, fax +34 915978470. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=000803-2009. 02/09.



Permalink

Page: