Saitec of Leioa secured the EUR75,937.50 contract, excluding VAT, for projects of civil protection facilities and self-protection plan in the tunnels of the high speed line Madrid-Extremadura, Plasencia-Badajoz section. Contact Adif, Madrid, tel +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175668-2014. Ref.n. 3.13/06402.0105 (P011/13). 22/14.