India,
Jammu and Kashmir
- in/74
Highway
Indra secured the contract, worth 6.5 million euros with a duration of 12 months. This is for the design, supply, set-up and rollout of a control system for the 9.2 km Chenani-Nashri tunnel or Patnitop Tunnel. It is situated on the two-lane NH1A highway linking Jammu to Srinagar, in the northern states of Jammu and Kashmir, it is the longest in Southeast Asia. They will build a centralized integrated management solution for the various intelligent traffic systems (ITS) that will be deployed in the tunnel and have guaranteed compliance with quality and security standards. The project includes implementation of the automatic incident detection, video surveillance, traffic control, signaling, fire detection, access control and emergency call systems, and also the ability to integrate other sub-systems supplied by local companies, such as the lighting, ventilation, communication and energy systems. Visit http://www.indracompany.com. 53/15.
India,
Jammu and Kashmir
- in/73
Highway
Hindustan Construction Company (HCC) has been awarded a NHAI (National Highways Authority of India) contract worth EUR 243 million contract ( Rs 1783.42 crore) for constructing a 36 km four lane highway which includes 6 two-lane tunnels the total length is 2.97km between Ramban and Banihal in Jammu and Kashmir. The project is a part of NHDP (National Highways Development Project) Phase-II program of NHAI on NH1A (National Highway – 1A), now NH-44. Visit http://www.hccindia.com/hcc_admin/data_content/pdf_files/NHAI_order_Ramban-Banihal_road.pdf. 43/15.
Invitation to tender, deadline 18/01/2021, for Independent Engineer services during Operation and Maintenance Period for increasing to four lanes of the Quazigund to Banihal section of NH 1A, from KM 189.350 to KM 204.700 including a 8.45 km tunnel (2 lane) on DBFOT (Annuity) basis in the UT of Jammu and Kashmir. Contact National Highways Authority of India, Jammu, tel 0191-2467505, fax 0191-2467505, email rojammu@nhai.org. For further on the tender click here. Ref.n. 2020_NHAI_62625_1. 02/21.
India,
Uttar Pradesh
- in/72
Metro
Closing Date:
25.08.2015 (Tender Closed)
Open invitation to tender, deadline 25.08.2015, for design, manufacture, supply, installation, testing and commissioning of Fiber Optic Transmission System, Telephone System, Train Radio TETRA System, Public Address System, Passenger Information Display System, Master Clock System, CCTV System and Power Supply System, supply of spares and the training of operation and maintenance personnel for these systems for Phase- 1A of Lucknow Metro Rail Project. The Lucknow Metro will be 11 km-long with 5.5 km underground. Duration of contract 30 months. Pre-bid Meeting: 24.07.2015 at 12:00 h. Contact Lucknow Metro Rail Corporation at Vipin Khand, Gomati Nagar, Lucknow. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229744-2015. 28/15.
Open invitation to tender, deadline 25.01.2016, for the design and construction of a tunnel from the start of the underground ramp near Charbagh Metro Station to the end of the underground ramp near K.D.Singh Babu Stadium metro station. To include three underground metro stations viz.Hussainganj, Sachivalaya and Hazratganj. Also includes all Architectural finishes , E & M, TVS, ECS on the North to South Corridor of the Lucknow MRTS and the Phase 1 A Project at Lucknow, Uttar Pradesh, India. The last pre-bidding meeting is on the 30.11.2015.Contact Lucknow Metro Rail Corporation, attention Chief Project Manager-II, Vipin Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, e-mail: cpm2.lmrc@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=387528-2015. Contract.n. LKCC-06. 46/15.
Jv M/S Larsen & Toubro Limited, L&T Construction, Water Smart World & Communications in Chennai (India) secured the contract for design, manufacture, supply, installation, testing and commissioning of Fiber Optic Transmission Systems, Telephone Systems, Train Radio TETRA Systems, Public Address Systems, Passenger Information Display Systems, Master Clock Systems, CCTV Systems and Power Supply Systems, the supply of spares and the training of operation and maintenance personnel for these systems for Phase- 1A of Lucknow Metro Rail Project. The Lucknow Metro will be 11 km-long with 5.5 km under ground. Contact Lucknow Metro Rail Corporation at Vipin Khand, Gomati Nagar, Lucknow. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=450615-2015. 53/15.
Postponed from 25.01.2016 to 04.02.2016 the deadline for the open invitation to tender for the design and construction of a tunnel from the begining of the underground ramp near Charbagh Metro Station to the end of the underground ramp near K.D.Singh Babu Stadium metro station. This will include three underground metro stations viz.Hussainganj, Sachivalaya and Hazratganj. Also includes all Architectural finishes , E & M, TVS, ECS on the North to South Corridor of the Lucknow MRTS and the Phase 1 A Project at Lucknow, Uttar Pradesh, India. Contact Lucknow Metro Rail Corporation, attention Chief Project Manager-II, Vipin Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, e-mail cpm2.lmrc@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=6025-2016. Contract.n. LKCC-06. 02/16.
Postponed deadline from 04.02.2016 to 11.02.2016, for the open invitation to tender for the design and construction of the tunnel near the Charbagh Metro Station. The tunnel is to be built from near the underground ramp at Charbagh to the end of the underground ramp at K.D.Singh Babu Stadium metro station. This will include three underground metro stations viz.Hussainganj, Sachivalaya and Hazratganj. The tender also includes all Architectural finishes, E & M, TVS and ECS on the North to South Corridor of the Lucknow MRTS and also the Phase 1 A Project at Lucknow, Uttar Pradesh, India. Contact Lucknow Metro Rail Corporation, for the attention of Chief Project Manager-II, Vipin Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, or e-mail cpm2.lmrc@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=41167-2016. Ref. n. LKCC-06. 06/16.
M/S GULERMAK and TPL a joint venture from Mumbai secured the EUR3.58 million contract (USD3.99 million), excluding VAT, for the design and construction of a tunnel from the begining of the underground ramp near the Charbagh Metro Station to end of underground ramp near the K.D. Singh Babu Stadium Metro Station. This will include three underground metro stations, viz. Hussainganj, Sachivalaya and Hazratganj. This is part of the North – South Corridor of the Lucknow MRTS, Phase 1A Project at Lucknow, Uttar Pradesh, India. For further information please contact the Lucknow Metro Rail Corporation, Vipin Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313678-2016. Ref. n. LKCC-06. 37/16.
India,
Andhra Pradesh
- in/69
Railway
Closing Date:
04.08.2014 (Tender Closed)
Invitation to tender, deadline 04.08.2014, for contract for new broad gauge railway line from Obulavaripalle to Venkatachalam. Construction of roadbed from km 17/0 to km 35/0 including construction of two tunnels, length 840 m and 6,620 m, with ballastless track and earthwork in formation, major and minor bridges covering Kadapa and Nellore Districts of Andhra Pradesh in South Central Railway, India. Contact RVNL, attn Mr Pradeep Gaur, Chennai, tel. 91-44-24618460, e-mail pradeepgaur@rvnl.org. Visit http://www.rvnl.org/tender/view_tender_detail.php?tid=538ec2dfc7640. 30/14.
India,
Jammu and Kashmir
- in/68
Hydropower
Closing Date:
05.10.2013 (Tender Closed)
India has initiated the process of constructing the 1,000 MW (4 x 250 MW) Pakal Dul (Drangdhuran) hydroelectric plant in District Kishtwar with an invitation of Bids (International Competitive Bidding). It is a reservoir-based scheme proposed on river Marusudar, the main right bank tributary of river Chenab in the Kishtwar district. The Pakaldul project will have the capacity to regulate the water flows in Chenab as a 16 km-long diversion tunnel is to be constructed under the design.
The deadline of submission of stage I bid (Bid Security, Qualification Particulars and Techno-commercial Bids) - for the interested bidders who meet the qualification criteria at the end of June 2013 - is postponed from 23.08.2013 to 05.10.2013.
The deadline of submission of Stage II Bid (Price Bids) for all those bidders who meet the qualification criteria and whose Techno-Commercial proposals for the subject works are found responsive is 30.10.2013.
The work under the Contract shall have to be completed within 66 months from the date of issue of Letter of Acceptance and Defect Liability period of 24 months shall commence after completion/commissioning of works. Contact CVPP Pvt Ltd, Jammu, tel/fax +91(191) 2479835, e-mail contracts@cvppindia.com. Visit http://www.cvppindia.com/tendersoft/tenderfiles.aspx?tenderid=21. Bid Code n. CVPP/PD/MW/RB/TK/2013 and corrigendums CVPP/PD/MW/RB/TK-01/2013 dated 18.07.2013, 06.08.2013 and 13.09.13. 39/13.
India,
Jammu and Kashmir
- in/67
Highway
Closing Date:
01.07.2013 (Tender Closed)
Invitation for qualification, deadline 01.07.2013, for construction, operation and maintenance of the single tube bi-directional Zozila tunnel, including 10.820 km approach road, between km 94 and km 119 on Srinagar Sonamarg Gumri road (NH-1) on Design, Build, Finance, Operate and Transfer (DBFOT) annuity basis. The scope of works broadly includes civil, electrical and mechanical works of Zozila tunnel. The estimated investment will be EUR1.35 billion, or Rs.9990 crores.
A pre-application conference will be held at 15.00h on 10.06.2013 at New Delhi. The complete bid documents can be viewed/downloaded from the BRO e-tendering portal www.tenderwizard.com/MORTH free of charge until 30.08.2013. Contact Mr. Rakesh Kureel, New Delhi, tel +91 (0)11-25686914, fax +91 (0)11-25696026, e-mail bro-e8@nic.in. Visit http://www.bro.nic.in/writereaddata/tenders/8063402713.pdf. 23/13.
The pre-qualified bidders for construction, operation and maintenance of the 14 km-long single tube bi-directional Zozila tunnel on the Srinagar Sonamarg Gumri road (NH-1) are Essel Infra Project JV with OHL, IL&FS Transportation Networks Ltd, GMR Highways Ltd and Welspun-Leighton-Patel Consortium. Visit http://bro.nic.in/writereaddata/tenders/4187478368.pdf. 39/14.
IRB Infrastructure Developers secured the EUR1.39 billion (Rs 10,050-crore) contract for the 14.08 km Zojila or Zozila tunnel construction on the Srinagar-Kargil-Leh highway in Jammu and Kashmir. The project is based on a design, build, finance, operate & transfer (annuity). It involves the construction of a two-lane and bi-directional tunnel with an escape route and a 10.8-km approach road. The NH-1 Srinagar–Sonmarg–Gumri Road, will include three vertical ventilation shafts, a 700-m snow gallery and avalanche protection measures. The construction of the tunnel is scheduled to be completed in seven years, this is due to the tough terrain and that there will be less days when outdoor work can be undertaken due to the extreme weather conditions. The concession period will be 22 years 7 years construction period + 15 years operation. Visit http://www.irb.co.in/. 01/16.
Ministry of Road Transport & Highways (MoRT&H) invites applications for expression of interest from an Independent Engineer (IE), deadline 14.01.2016, for construction, operation and maintenance of the Zojilla or Zozila tunnel to be executed as DBFOT (Annuity) basis. Contact Ministry of Road Transport & Highways, attn Mr. Dheeraj, New Delhi, tel 011-23314328, fax 011-23710358, e-mail dheeraj.rth@nic.in. For further information http://www.morth.nic.in/showtfile.asp?tid=792. Tender n. RW/NH-12037/1312/AppoIE/ZT/2015/NH-1. 01/16.
Open invitation to tender, deadline 23.02.2017, for the construction operation and maintenance of a 2 lane bidirectional Zojila/Zozila tunnel with parallel escape route tunnel including approaches on Srinagar-Leh section connecting NH 1 at km 95.00 and at km 118.00 in the state of Jammu& Kashmir. For further information please visit https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=173265. Ref.n. NHIDCL/J K/ Zojila Tunnel/NH-1/2017. 03/17.
Open invitation to tender, deadline 01.04.2019, for the construction operation and maintenance of a 2 lane bidirectional Zojila/Zozila tunnel with parallel escape tunnel excluding approaches on Srinagar-Leh section connecting NH 1 at km 95.00 and at km 118.00 in the state of Jammu& Kashmir. Pre Bid Meeting: 18.03.2019 at 03:00 PM.For further information please visit https://eprocure.gov.in/eprocure/app?component=%24DirectLink_0&page=FrontEndAdvancedSearchResult&service=direct&session=T&sp=STLN7tEy1m4Nn6kmCdOejwg%3D%3D.
Ref.n. 2019_NHIDC_448090_1. 09/19.
On 15.01.2019 India’s State-owned NHIDCL (National Highways
and Infrastructure Development Corporation Limited) has terminated the contract
awarded to IL&FS (Infrastructure Leasing and Financial Services) group for
the construction operation and maintenance of a 2 lane bidirectional
Zojila/Zozila tunnel with parallel escape tunnel. It’s the second time NHIDCL
terminates the awarded contract for building the 14.2 km-long Zojila tunnel.
Visit http://www.newindianexpress.com/business/2019/jan/17/nhidcl-terminates-ilfs-contract-for-zojila-tunnel-project-1926394.html.
03/19.
Postponed to 10.07.2019 the deadline of the open invitation to tender for the construction operation and maintenance of a 2 lane bidirectional Zojila/Zozila tunnel with parallel escape tunnel excluding approaches on Srinagar-Leh section connecting NH 1A at km 95.00 and at km 118.00 on EPC (Engineering, Procurement and Construction) mode. Contact NHIDCL, attn Dr. Satyanarayana Dash, Odisha, tel +91- 9776751669, email satya8may@yahoo.co.in. Visit https://nhidcl.com/tenders/tendors/uploads/3a84c/amendment%20no.%207.pdf
and
https://eprocure.gov.in/eprocure/app?component=%24DirectLink_0&page=FrontEndAdvancedSearchResult&service=direct&session=T&sp=STLN7tEy1m4Nn6kmCdOejwg%3D%3D.
Ref.n. 2019_NHIDC_448090_1. 27/19.
Request For Proposal, deadline 23/07/2020, for Construction of a Connecting Road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and Ladakh. Contact NHIDCL, attn Executive Director, New Delhi, tel +91-11-23461614, mobile +91-9818513196 email sanjeev.malik@gov.in. Visit https://nhidcl.com/tenders/tendors/uploads/91a21/NIT%2010.06.2020.pdf and https://eprocure.gov.in/eprocure/app. Ref.n. NHIDCL/JnK-Ladakh/ Zojila/NH-01/2020. 24/20.
Megha Engineering & Infrastructure (MEIL) from Hyderabad secured the Rs 4,509.5 crore EPC (Engineering, Procurement and Construction) contract for the construction of a connecting road from Z-Morh Tunnel to Zojila Tunnel and a 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01. Contact NHIDCL, attn Executive Director, New Delhi, tel +91-11-23461614, mobile +91-9818513196 email sanjeev.malik@gov.in. Visit https://www.pib.gov.in/PressReleasePage.aspx?PRID=1664707 . Ref.n. NHIDCL/JnK-Ladakh/ Zojila/NH-01/2020. 35/20.
Request For Proposal, deadline 25/07/2023, for Consultancy Services for a Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the Construction of the 2nd Tube Uni-directional Zojila Tunnel (13.14 km, excl. approaches) from km 16.80 to km 30.50 of NH-1 in the under UT of Jammu & Kashmir.-2nd Call. Click here for tender submission. Contact NHIDCL, attn B.Shivprasad, New Delhi, tel +91-11-23461674, email shivprasad.152p@gov.in. Visit https://nhidcl.com/tenders/tendors/uploads/e6a34/tendor/RFP.pdf. Ref.n. NHIDCL/JK/NH-1/Zojila 2nd Tube Tunnel/DPR /2023. 28/23.
India,
Manipur
- in/65
Railways
The JV Hindustan Construction Company Ltd (60%)/Coastal Projects Pvt Ltd (40%) has been awarded a project by North Frontier Railway for design and construction of a railway tunnel from km 15.880 to km 19.500 between Dholakal and Kaimai on the new railway line being developed between Jiribam and Tupur in Imphal. The project, which includes a 3.25 km-long single-track tunnel, will be completed in 24 months at a cost of EUR32.6 million. Visit http://www.hccindia.com and www.coastalprojects.co.in. 13/10.
HCC awarded construction contract, value EUR52.5 million duration 28 months, for 4.7 km-long single-track tunnel between Khongsang and Tupur on new railway line between Jiribam and Tupur in Imphal. More from sandeep.sawant@hccindia.com or visit www.hccindia.com and www.coastalprojects.co.in. 37/10.
Open invitation to tender, deadline 30.04.2013, for detail design and construction supervision of NATM method for tunnel n. 2,4,5,6 & 6A. Approximate total length 5.98 km in connection with the construction of new railway line project from Jiribam to Tupul. Duration contract 18 months. Availability of tender documents from 17.04.2013 to 30.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6903. Bid Code n. CE/CON/J-T/Tunnel (Design)/2011/15(RT-1). 12/13.
Open invitation to tender, deadline 30.04.2013, for construction of single line BG tunnel n.26A (length 270 m) at km 92.97 to km 93.24 between Noney and Tupul in connection with construction of new railway line project from Jiribam to Tupul. Duration contract 12 months. Availability of tender documents from 17.04.2013 to 30.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6904.
Bid Code n. CE/CON/J-T/Tunnel No.26A/2013/17. 12/13.
Open invitation to tender, deadline 09.04.2013, for convergence measurement in nine tunnels (length 6.20 km) under jurisdiction of DY.CE/CON-I/Imphal in connection with construction of new railway line project from Jiribam to Tupul. The contract includes supply, installation and maintenance of convergence measuring instruments. Duration contract 20 months. Availability of tender documents from 26.03.2013 to 09.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6892.
Bid Code n. CE/CON/J-I/Tunnel Instrumentation/2013/03. 12/13.
Open invitation to tender, deadline 09.04.2013, for convergence measurement in tunnels T-24, T-25, T-26, T-26-A & T-27 under jurisdiction of DY.CE/CON-II/Imphal in connection with construction of new railway line project from Jiribam to Tupul. The contract includes supply, installation and maintenance of convergence measuring instruments. Duration contract 20 months. Availability of tender documents from 26.03.2013 to 09.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6893. Bid Code n. CE/CON/J-I/Tunnel Instrumentation/2013/04. 12/13.