France,
Paris
- fr/127
Grand Paris Express
Closing Date:
08.01.2014 (Tender Closed)
Negotiated invitation to tender, deadline 08.01.2014, for general management during construction of the two new sections of Grand Paris Express: Saint-Denis Pleyel/Le Bourget RER - a 6 km-long tunnel with two stations at Saint-Denis Pleyel and La Courneuve Six Routes - and Mairie de Saint-Ouen/Saint-Denis Pleyel, a 1.5 km-long tunnel. Contract duration 132 months after award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=408888-2013. Ref. n. PN2013-14. 49/13.
Negotiated invitation to tender, deadline 19.12.2013, for technical building inspection on the 23 km-long Noisy-Champs (station included) - Villejuif Louis Aragon (station not included) section of the Line 15 of Grand Paris Express. The section includes an electricity tunnel at a 17-53 m depth, connection tunnels, TBM launch shafts and eight underground stations. Contract duration 103 months after award. Contact Societe du Grand Paris, att.n M. Martinat Severine, Saint-Denis, tel +33 182462000, fax +33 182462031, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412834-2013. Ref. n. PN2013-16. 50/13.
Negotiated invitation to tender, deadline 21.02.2014, for security and health protection coordination concerning the design and construction of the Line 15 of Grand Paris Express. The bid includes two lots: CSPS T2 and CSPS T3. Contract duration 100 months after award. Contact Societe du Grand Paris, att.n M. Debuire Jean-Baptiste, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040167-2014. Ref. n. PN2013-17. 06/14.
Negotiated invitation to tender, deadline 04.04.2014, for general management during construction of the new 14 km-long tunnel section Olympiades (excluding station)-Orly Airport, a southern extension of Line 14. The section will include seven new stations (Maison Blanche Paris xiii, Kremlin Bicetre Hospital, Institut Gustave Roussy IGR, Chevilly Trois Communes, M.I.N.-Porte de Thiai, Pont de Rungis and Aeroport d'Orly) and 12 other infrastructures. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082578-2014. Ref. n. PN2014-01. 11/14.
Invitation to tender by restricted procedure, deadline 24.03.2014, for construction of a shaft and a survey tunnel for geotechnical tests prior to the construction of the future Arcueil/Cachan station on the Line 15 South of Grand Paris Express. Contract duration 10 months after award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, website https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=158691&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=080501-2014. Ref. n. MAPA2014-04-Candidature. 12/14.
Negotiated invitation to tender, deadline 28.05.2014, for sinking of 25 m-deep x 7 m-diameter shaft and gallery to facilitate test drilling, boring and grouting work for stations at Saint Maur Creteil and Champigny Centre on Red Line 15 south. Further information, specs and docs from Mlle Staadal Maude at Societe du Grand Paris, Saint-Denis, tel +33 182462000, website www.marches-publics.gouv.fr. Tenders and requests to participate to above address, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151502-2014. 19/14.
Negotiated invitation to tender, deadline 01.12.2014, for technical assistance services during construction of infrastructures and systems of the Green Line 18 of driverless metro in Paris, section Aeroport d'Orly - Versailles-Chantiers. Duration contract 24 months from award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=374465-2014. Ref.n. PN2014-18_14S0196. 45/14.
Negotiated invitation to tender, deadline 15.12.2014, for the project management during construction of the 20 km-long Pont de Sevres (station not included) - Saint-Denis-Pleyel (station not included) section of the Line 15 of Grand Paris Express. The section includes nine stations. Contract duration 156 months after award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389803-2014. Ref. 2014PN020-14S0203. 48/14.
Egis Rail at Lyon secured the contract for general management during construction of the two new sections of Grand Paris Express: Saint-Denis Pleyel/Le Bourget RER - a 6 km-long tunnel with two stations at Saint-Denis Pleyel and La Courneuve Six Routes - and Mairie de Saint-Ouen/Saint-Denis Pleyel, a 1.5 km-long tunnel. Contact Societe du Grand Paris, attn Severine Martinat, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=416083-2014. Ref. n. PN2013-14. 50/14.
Becs SARL of Boulogne secured Lot 1 (T2 section) and SA Presents of Lyon secured Lot 2 (T3 section) for security and health protection coordination concerning the design and construction of the Line 15 of Grand Paris Express. Contact Societe du Grand Paris, att.n M. Debuire Jean-Baptiste, Saint-Denis, tel +33 182462000, fax +33 182462031.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=002877-2015. Ref. n. PN2013-17. 02/15.
Negotiated invitation to tender, deadline 23.01.2015, for construction works between the stations of Pont de Sevres and Noisy Champs on Red Line 15 south. Further information, specs and docs from Mlle Staadal Maude at Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=439936-2014. 02/15.
Negotiated invitation to tender, deadline 13.05.2015, for geotechnical assistance to the general management during construction of RTPGP (Reseau de Transport Public du Grand Paris). The contract is composed of four lots: line 15 East (lot 1), line red 15 West (lot 2), line red 17 (lot 3) and line green 18 (lot 4). Value of contract EUR17 million, excluding VAT, duration 72 months. Contact Societe du Grand Paris, att.n m.lle Staadal Maude Saint-Denis, tel +33 182462000, fax +33 182462031, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120979-2015. Ref. n. 2015PN012. 16/15.
Prior Information Notice for construction and civil engineering work from Noisy Champs to Pont de Sevres on Red Line 15 south. Contact Societe du Grand Paris at Saint-Denis. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135407-2015. 17/15.
Setec TPI of Paris secured the contract for general management during
construction of the new 14 km-long tunnel section Olympiades (excluding
station)-Orly Airport, a southern extension of Line 14. The section will
include seven new stations (Maison Blanche Paris xiii, Kremlin Bicetre
Hospital, Institut Gustave Roussy IGR, Chevilly
Trois Communes, M.I.N.-Porte de Thiai, Pont de Rungis and Aeroport
d'Orly) and 12 other infrastructures. Contact Societe du Grand Paris, attn
Martinat Severine, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160798-2015. Ref. n.
PN2014-01. 19/15.
Negotiated
invitation to tender, deadline 02.06.2015, for water and environmental law
investigation prior to start of construction of 14 km-long tunnel Olympiades
(excluding station)-Orly Airport, a southern extension of Line 14. The section
will include seven new stations and 12 other infrastructures. Duration of contract 26 months from award.
Contact RATP, att.n Mounira Soilihy, tel +33 158774495, fax +33 158774645,
website www.marches-publics.gouv.fr.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=171465-2015.
Ref. n. 15-0075-MOP. 21/15.
Open invitation to tender, deadline 21.07.2015, for further preliminary studies about construction of Line 15 East from Saint-Denis Pleyel to Champigny Centre for RTPGP (Reseau de Transport Public du Grand Paris). Duration of contract 48 months. Contact Societe du Grand Paris, att.n Mrs Legrand Dominique, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=247781&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205785-2015. Ref. n. 2015AOO010. 25/15.
Negotiated invitation to tender, deadline 28.08.2015, for the tests and analysis of tests for the characterization of soil’s mechanical properties and vibration transfer during construction of RTPGP (Reseau de Transport Public du Grand Paris). Value of contract EUR1.5-2.5 million, excluding VAT, duration 72 months. Contact Societe du Grand Paris, attn Renteux Jeremy, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262831-2015. Ref. n. 2015PN031. 31/15.
Negotiated invitation to tender, deadline 11.09.2015, for construction (tunnel, station and civil works) from Fort d'Issy Vanves Clamart station (not included) and Villejuif Louis Aragon station (included) on Red Line 15 south. Further info from https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=212409&orgAcronyme=s2d. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=276280-2015. Ref.n. 2015PN037. 34/15.
Invitation to tender using negotiated procedure, deadline 23.10.2015, for construction of shafts and survey tunnels with pre ground treatments by jet grouting and freezing on the future Red line, Grand Paris Express. Duration contract 15 months from awards. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031. Further information from https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=266511&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339935-2015. Ref.n. 2015PN038 – Candidatures. 40/15.
Altamira Information part of the CLS Group secured the EUR4,5million contract for the satellite-based supervision of the Grand Paris Express project. The project includes the construction of 200 additional km of metro lines and 68 new stations that will link the transport hubs of Greater Paris, the three airports and the TGV (high-speed train) stations. The project involves overcoming geotechnical difficulties in certain areas, the new network will need to take into account existing key infrastructures, and works will take place in densely or very densely populated and built-up areas. All these factors demand an accurate surveillance in order to minimise any possible impact that this 15-year long construction may have in the area. A monthly report will be created to inform people about stable and moving areas, enabling the general managent to assess the impact of the excavation on the surface and to decide on possible adjustments. Visit http://www.altamira-information.com/news/view/grand-paris-express-altamira-information-in-charge-of-the-satellite-surveil/2015. 41/15.
Negotiated invitation to
tender, deadline 18.11.2015, for engineering works on the Villejuif Louis
Aragon (station not included) section of Line 15 of the Grand Paris Express.
The section includes tunnels and associated works. The contract duration will
be for 72 months after the award. Contact Societe du Grand Paris, Saint-Denis,
tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=274399&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380317-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367456-2015. Ref. n. 2015PN039. 44/15.
Negotiated invitation to tender, deadline 18.11.2015, for engineering works on the section 1103p exit shaft - Bry-Villiers-Champigny station on Line 15 of the Grand Paris Express. The section includes tunnels, stations and associated works. The contract duration is for 72 months after the award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=212409&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380316-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367455-2015. Ref. n. 2015PN040. 44/15.
The Group SETEC TPI/Systra/as.architecture-studio/Agence Search/Wilmotte et Associés SA /Jean-Paul Viguier et Associés/Marin + Trottin Architectes/Périphériques in Paris secured the contract for project management during the construction of the 20 km-long Pont de Sevres (station not included) - Saint-Denis-Pleyel (station not included) section of the Line 15 of Grand Paris Express. The section includes nine stations. Contact Societe du Grand Paris, att.n Legrand Dominique, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412229-2015. Ref. 2014PN020-14S0203. 48/15.
Negotiated invitation to tender, deadline 22.01.2016, for the general management of the construction of Line 15 East from Saint-Denis Pleyel (station not included) to Champigny Centre (station not included) as part of the Grand Paris Express. Duration of the contract is 192 months. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=442609-2015. Ref. n. 2015PN050. 01/16.
Negotiated invitation to tender, deadline 17.02.2016, for safety inspections and evaluations (mission OQA) of the public transport system for the following Grand Paris Express sections :-
Le Bourget RER (station not included) - Mesnil-Amelot (station included) on Line 17 North;
Pont de Sevre (station not included) - Saint-Denis Pleyel (station included) with 21 km tunnel on Line 15 West;
Saint-Denis Pleyel (station not included) - Champigny Centre (station included) with 26 km tunnel on Line 15 East;
Airport Orly (station not included) and Versailles-Chantiers (station included) on Line 18.
The duration of the contract is 83 months. Please contact Societe du Grand Paris, att.n Debuire Jean-Baptiste, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=276592&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=28649-2016. Ref. n. 2015PN046. 05/16.
Negotiated invitation to tender, deadline 19.08.2016, for Lot 2 (11.1 km tunnel and 4 underground stations) and Lot 3 (5.5 km tunnel and 1 underground station), part of the civil works on Line 16 of the Grand Paris Express and its connections to Line 14, Line 15 and Line 17 and the Aulnay maintenance site. The contract duration is for 72 months after award. Contact Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855, fax +33 175622362, e-mail sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=237801-2016. Ref. n. 2016pn019. 28/16.
Periodic indicative notice without call for competition for civil works on Line 16 of Grand Paris Express and its connections to Line 14, Line 15 and Line 17 and the Aulnay site maintenance. The contract, composed of 3 lots, will include track works on part of the infrastructure.
Lot 1: a 19.6 km tunnel driven by 6 TBMs (diameter 9.80 m, 8.85 m and 7.70 m), a 560 m section to the adit of maintenance site and 5 underground stations at Stade de France, Saint-Denis Pleyel, La Courneuve «Six routes», Le Bourget RER and Le Blanc Mesnil.
Lot 2: 11.1 km tunnel driven by 2 TBMs (diameter 9.80 m) and 4 underground stations at Aulnay, Sevran-Beaudottes, Sevran-Livry and Clichy-Montfermeil.
Lot 3: 5.5 km tunnel driven by 1 TBM (diameter 9.80 m) and the underground Chelles station.
Further information from Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855, fax +33 175622362, e-mail Travaux.ligne16@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185696-2016. 28/16.
Soletanche Bachy France from Rueil-Malmaison and SADE CGTH in Paris secured the contract for construction of shafts and survey tunnels with pre ground treatments by jet grouting and freezing on the future Red line, Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295570-2016. Ref.n. 2015PN038. 35/16.
Negotiated invitation to tender, deadline 30.11.2016, for the civil works inside the 18.4 km tunnel which will be built with a TBM. Works include trenches, stations and related works between Saint-Ouen and the Aulnay operations center. Duration of the contract is 72 months. Further information from Societe du Grand Paris, att.n M. Dominique Legrand or Yacine Bemrah, Saint-Denis, tel +33 175623855-2362, fax +33 175622362, e-mail sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=384686-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=371314-2016. Ref.n. 2016PN019-L01. 45/16.
The group Demathieu Bard Construction (leader of Group) from Montigny-lès-Metz, NGE Génie Civil from Saint-Étienne-du-Grès, Impresa Pizzarotti & C SpA from Parme, Guintoli SAS from Saint-Étienne-du-Grès, GTS SAS from Saint-Priest, Frankki Foundations Belgium from Saintes, Atlas Fondations from Lezennes and Implenia from and GTS SAS from Saint-Priest secured the contract for construction of a tunnel and ancillary works from Noisy-Champ to Bry-Villiers-Champigny for the Line 15 of Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=436109-2016. Ref. n. 2015PN028. 50/16.
Negotiated invitation to tender, deadline 09.05.2016 , for technical inspection on structures and systems of Lines 15 East (Lot 2) and 18 (Lot 1) for the Greater Paris Express. For each lot the value of the contract is EUR3 million, excluding VAT, with a 171 month duration. For further information https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=287478&orgAcronyme=s2d where tenders have to be submitted. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=139665-2016. Ref.n. 2016PN004. 16/16.
Bureau Veritas SA from Neuilly-sur-Seine secured the contract for technical inspections on Line 18’s structures and systems for the Greater Paris Express (Lot 1). Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=441929-2016. Ref.n. 2016PN004. 50/16.
Postponed until the 22.12.2016 the deadline for the negotiated invitation to tender for Lot 2 (11.1 km tunnel and 4 underground stations) and Lot 3 (5.5 km tunnel and 1 underground station), which are pats of the civil works on Line 16 of the Grand Paris Express and its connections to Line 14, Line 15 and Line 17 this includes the Aulnay maintenance site. The contract duration is for 72 months after the award. Contact Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855, fax +33 175622362, e-mail sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=445925-2016, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=421343-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=404858-2016. Ref. n. 2016pn019. 51/16.
Awarded the contracts for the assistance to general management for topographic services for the construction of the Grand Paris Express network. The contract is composed of 5 lots: Lot 1 involves section T1, le Bourget (included) - Noisy Champs (not included) and the Aulnay maintenance site; Lot 2 involves section T5, Le Mesnil-Amelot (included) - Saint Denis Pleyel (included); Lot 3 involves section 4, Pont de Sèvres (not included) - Saint-Denis Pleyel (not included); Lot 4 involves section 7, Aeroport d'Orly (not included) - Versailles Chantiers (included) and the Palaiseau maintenance site; Lot 5, Section T8, Saint-Denis Pleyel (not included) - Champigny centre (not included) and the Rosny-sous-Bois maintenance site.
Techniques Topo at Paris, Progexial at Longjumeau and Secteur from Santeny secured Lots 1B, 2B, 3B, 4B and 5B; SA Fit Conseil from Nantes secured Lots 1A, 2A, 3A, 4A and 5A. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=034069-2017. Ref.n. 2015PN025. 05/17.
The joint venture made up of VINCI Construction, the lead company, associated with Spie batignolles secured the EUR926 million contract, excluding VAT, to build the T3C section of Line 15 South of the future Grand Paris Express transport network between the Fort d’Issy-Vanves-Clamart and Villejuif Louis Aragon stations in Paris. The contract includes the construction using two EPB TBMs the tunnel is 8 km and will have 5 new stations (Châtillon Montrouge, Bagneux, Arcueil-Cachan, Villejuif Institut Gustave Roussy and Villejuif Louis Aragon) and 8 new shafts. The project will take 70 months to complete. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000.Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20170222-1745.htm. 08/17.
Negotiated invitation to tender, deadline 11.04.2017, for civil works for tunnels, opened and covered trenches, railway stations, ancillary works on Line 18 of the Grand Paris Express. The bid is composed of two lots : lot 1 includes 11.4 km tunnel to be driven by TBM with 7.8 m diameter, 3 underground stations (Antonypole, Massy Opera, Massy-Palaiseau), the duration of the contract is 67 months ; lot 3 includes 8.2 km tunnel by TBMs and 3 underground stations at Saint-Quentin-Est, Satory and Versailles-Chantiers, with a 96 months duration. Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=084824-2017. Ref. n. 2017PN007-candidatures. 10/17.
Additional information for the negotiated invitation to tender, deadline 11.04.2017, for civil works for tunnels, opened and covered trenches, railway stations, ancillary works on Line 18 of the Grand Paris Express. The bid includes two lots : lot 1 includes 11.4 km tunnel to be driven by a TBM with 7.8 m diameter, 3 underground stations (Antonypole, Massy Opera, Massy-Palaiseau), duration 67 months ; lot 3 includes 8.2 km tunnel driven by TBMs and 3 underground stations at Saint-Quentin-Est, Satory and Versailles-Chantiers, with a 96 months duration. Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102391-2017. Ref. n. 2017PN007-candidatures. 12/17.
Negotiated invitation to tender, deadline 17.07.2017, for the supply of External Controls on Civil Engineering and Waterproofing for Line 16 (35 km length of tunnels included) for the Grand Paris Express and its connections to L14, 15 and 17 lines and for the maintenance of the Aulnay site. The bid is composed of two lots. The duration of the contract is 85 months. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202574-2017. Ref. n. 2017PN008. 22/17.
Techniques topo sa - SCOP from Paris and Progexial sarl from Longjumeau secured the Lots 1, 3 and 4 contracts for the topographic controls for the construction of Line 15 South of the future Grand Paris Express transport network between Noisy-Champs and Pont de Sevres stations, stations included. Fit Conseil Selafa from Nantes secured the contract for Lot 2). Contact Societe du Grand Paris, att.n Rachel Lefevre Saenz, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=268744-2017. Ref. n. 2015PN012. 28/17.
Grand Paris Express has awarded the final two civil works contracts for the construction of the EUR3.7 billion 33km Line 15 South of the Grand Paris Express.
A consortium led by Bouygues TP and including Soletanche Bachy France, Soletanche Bachy Tunnels, Bessac and Sade has won lot T3A of line 15 South, comprising civil engineering works between the stations of Pont de Sevres (included) and Fort d’Issy-Vanves-Clamart (not included). The EUR513 million contract, excluding VAT, involves the digging of the 4.2 km monotube tunnel Pont-de-Sèvres and Issy RER stations included and the entrance TBM shaft for the Line 15 South linking Pont-de-Sèvres and Noisy Champs in the southern suburbs of Paris.
A consortium led by Vinci Construction France and including Dodin Campenon Bernard, Spie Batignolles TPCI, Botte Fondations, Spie Fondations and VINCI Construction Grands Projets secured the EUR 156 million contract, excluding VAT, to construct Noisy Champs station.
By the end of the year, 41 work sites will be opened, the first of 10 TBMs will be launched at Champigny. Visit https://www.societedugrandparis.fr/actualite/ligne-15-sud-du-grand-paris-express-tous-les-marches-de-genie-civil-attribues and for further information click here. 28/17.
Bureau Veritas Exploitation from Levallois-Perret secured the contracts Lots 1, 3 and 4 for the external environmental controls for the construction of Line 15 South of the future Grand Paris Express transport network between Noisy-Champs and Pont de Sevres stations, stations included. SAS SCE from Nantes and Cap Air - Rincent Environnement from Neuilly-Plaisance secured the contract for Lot 2. Contact Societe du Grand Paris, att.n Rachel Lefevre Saenz, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=346059-2017. Ref. n. 2016PN032. 36/17.
Negotiated invitation to tender, deadline 12.01.2018, for the supply, installation and commission of elevators for the Grand Paris Express. The duration of the contract is 72 months. Further information from https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=353520&orgAcronyme=s2d.
Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=475835-2017.
Ref. n. 2016AC09. 49/17.
SARL Cigma Ouest Saint Brieuc from Saint Brieuc secured the
project management assistance to the contractual management for works and
equipment for the Grand Paris Express. Contact Societe du Grand Paris,
Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=047084-2018.
Ref. n. 2017PN005. 06/18.
The Societe du Grand Paris has awarded the first civil
engineering contract to the consortium led by Eiffage Genie Civil and composed
of Razel Bec, Eiffage Rail, Tso e Tso Catenaries. The value of the contract is EUR1.84 billion, excluding VAT, for lines 14
North, 16 and 17 South of Grand Paris Express.`The contract includes the common
section of lines 16 and 17, between the Saint-Denis Pleyel and Le Bourget RER
stations (included), and its connection to the future Operative Center for
lines 16 and 17 at Aulnay-sous-Bois, by the line 16 and Le Blanc-Mesnil train
station (included). The contract also includes the extension of line 14 between
the station Mairie de Saint-Ouen (excluded) and the station Saint-Denis Pleyel,
as well as the crossing of this last station by the line 15 North. The contract
includes the construction of the Saint-Denis Pleyel, La Courneuve
Six-Route", Le Bourget RER and Le Blanc-Mesnil stations. For the digging
of the 4 tunnels (19.3km) 6 TBMs will be used. The commissioning of these
sections is scheduled for the 2024 Olympic and Paralympic Games.
Click here for further information. Visit https://www.societedugrandparis.fr.
08/18.
https://www.societedugrandparis.fr/gpe/actualite/lignes-14-nord-16-et-17-sud-premier-marche-de-genie-civil-attribue-un-groupement
The consortium led by VINCI Construction (Dodin Campenon
Bernard, lead company; VINCI Construction France; VINCI Construction Grands
Projets and Botte Fondations) together with Spie batignolles (Spie batignolles
Genie Civil and Spie batignolles Fondations) has been awarded the EUR400
million contract, excluding VAT, to execute works package GC02 of the future
Line 14 South of Grand Paris Express, between Olympiades (in the 13th
arrondissement of Paris) and Orly Airport.
The contract requires the use of a TBM EPB to excavate a 4.6
km tunnel between Maison Blanche Paris XIII future station and the TBM starting
shaft at Jean Prouve. It also includes construction of the new Kremlin Bicetre
Hopital station and five ventilation and emergency shafts. The contract is
scheduled to last 72 months. Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20180220-0830.htm.
08/18.
The JV Eiffage genie civil Sas/Razel Bec Sas/Eiffage rail
Snc/TSO Sas/TSO Catenaires Sas secured the contract for the civil works inside
the 18.4 km tunnel which will be built with a TBM. Works include trenches,
stations and related works between Saint-Ouen and the Aulnay operations centre.
Contact Societe du Grand Paris, att.n M. Dominique Legrand
or Yacine Bemrah, Saint-Denis, tel +33 175623855-2362, fax +33 175622362, email
sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=138217-2018.
Ref.n. 2016PN019-L01. 13/18.
The negotiated invitation to tender for the supply,
installation and commission of elevators for the Grand Paris Express has been discontinued.
Contact Societe du Grand Paris, attn.
Jeremy Renteux, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158083-2018
.
Ref. n. 2016AC09. 15/18.
Negotiated invitation to tender, deadline 06.06.2018, for design, supply, works, test, commissioning for the ventilation, decompression and smoke extraction systems in Line 15 South tunnels of Grand Paris Express. Duration of the contract will be 70 months. For further information https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=355556&orgAcronyme=s2d. Contact Societe du Grand Paris, Saint-Denis, tel + 33 182462000, fax +33
182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167844-2018. Ref.n. 2017PN025_Candidature. 16/18.
Negotiated invitation to tender, deadline 21.06.2018, for
the HW /LW equipment and works and for cabling of a Line 16 / 17s section for
the Grand Paris Express. The duration of the contract is 101 months. Further
information from https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=373191&orgAcronyme=s2d
where offers must be sent. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33
182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=198453-2018
and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209641-2018.
Ref. n. 2018PN014_Candidature. 20/18.
BECS Sarl in Boulogne secured the contract for coordination
for safety and health protection (CSPS) for the design and construction of Line
18 of the Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel
+33 182462000, fax +33 182462031, email
marches-sgp@societedugrandparis.fr.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=283410-2018.
Ref. n. 2016PN010. 27/18.
The negotiated invitation to tender, deadline 11.04.2017,
for lot 3 which includes the construction of a 8.2 km tunnel by TBMs. Also 3
underground stations at Saint-Quentin-Est, Satory and Versailles-Chantiers on
Line 18 of the Grand Paris Express, has been discontinued and the contract was
not awarded. Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel
+33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr
. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=292679-2018
.Ref. n. 2017PN007-candidatures. 29/18.
Negotiated invitation to tender, deadline 04.09.2018, for
track works on the Maison blanche -Orly Airport section of the southern
extension of Line 14, Paris. Duration of the contract is 60 months from award.
For the document https://ratp.bravosolution.com/web/login.html
where offers must be sent.
Contact RATP, att.n Stephane Aref, tel +33 158771358, email stephane.aref@ratp.fr. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309430-2018.
Ref. n. DHA_2018GDI13099. 30/18.
The JV T.T Geometres Experts (Parigi)/Progexial (Longjumeau)
secured the EUR745,000 contract,
excluding VAT, for the External Topographic Controls on the extension to Orly
Airport of Line 14 (Lot PI 27). Contact
RATP, att.n Swann Moulin, tel +33 158771925, email Swann.MOULIN@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=330536-2018.
Ref. n. DHA_2017MOP12304.
31/18.
The contract for Lot 3 (5.5 km tunnel and 1 underground
station), part of the civil works on Line 16 of the Grand Paris Express and its
connections to Line 14, Line 15 and Line 17 and the Aulnay maintenance site,
has been not awarded. Contact Societe du Grand Paris, att.n M. Dominique
Legrand, Saint-Denis, tel +33 175653855 or M. Yacine Bemrah, tel +33 175622362,
email travaux.ligne16@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=395594-2018.
Ref. n. 2016pn019. 37/18.
The Alise joint venture led by VINCI Energies via its subsidiary SDEL Transport Grands Projets, in partnership with Eiffage Énergie Systèmes (50/50), has won the Eur71 million contract to comprehensively implement the electrical architecture of Grand Paris Express Line 15 South. The contract covers implementation of the 20 kV network electrical construction from the 10 Enedis supply substations and to implement electricity distribution for the Line 15 South tunnels, stations and structures to the 250 low-voltage distribution boards. The contract also covers the installations that help ensure passenger, rail tunnel and station safety (lighting, emergency service electrical outlets and telephone systems, temperature rise sensors). The new 33-km metro Line 15 South will connect 22 municipalities in four administrative departments, and will have 18 new stations between Pont de Sèvres and Noisy Champs. Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20181019-0830.htm. 42/18.
Salini Impregilo has won the EUR718.8-million contract to build Lot 2 of the new metro line 16 for Grand Paris Express. The future Line 16 will serve a number of communes in the northern and eastern part of metropolitan Paris.The contract will involve the excavation of 11.1 km of tunnel and the construction of four stations at Aulnay, Sevran-Beaudottes, Sevran-Livry and Clichy Montfermeil, along with 11 related works. Visit https://www.salini-impregilo.com. 42/18.
https://www.salini-impregilo.com/en/press/press-releases/salini-impregilo-wins-718-8m-contract-for-grand-paris-express-project.html
Hydrogeotechnique Nord et Ouest from Goussainville secured the
contract for the supply of External
Controls on Civil Engineering (Lot 1) for Line 16 (35 km of tunnels included)
for the Grand Paris Express and its connections to L14, 15 and 17 lines and for
the maintenance of the Aulnay site. Contact Societe du Grand Paris, attn Rachel
Lefevre Saenz, Saint-Denis, tel +33 182462000, fax+33 1182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=481026-2018.
Ref. n. 2017PN008. 44/18
Negotiated invitation to tender, deadline 14.12.2018, for
development works for the Le
Blanc-Mesnil railway station and its ancillary works on line 16 of the Grand
Paris Express. The contract includes technical equipment, HT/LT, Heating Ventilation and Air Conditioning,
Plumbing, and Roadworks (Miscellaneous Networks) (VRD). The duration of the
contract is 54 months. Further information from https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=391875&orgAcronyme=s2d
where offers must be sent. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33
182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=421084-2018,
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=473495-2018
and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=518133-2018.
Ref. n. 2018PN025. 47/18.