The Joint Venture Razel-Bec (mandataire), Sefi-Intrafor and Fayat Metal secured the EUR 325 million contract, excluding VAT, for the construction of the section between the stations Clichy-Montfermeil and Noisy-Champs of Grand Paris Express’s line 16( lot 3). The contract includes the construction of a 5.5km tunnel between Bel-Air building at Chelles and the back of Noisy-Champs, of the new Chelles station and 6 service structures. Works will begin on September 2021 and will end 7 years later. For further information please click here. Visit https://www.societedugrandparis.fr/. 08/21.