The Alise joint venture led by VINCI Energies via its subsidiary SDEL Transport Grands Projets, in partnership with Eiffage Énergie Systèmes (50/50), has won the Eur71 million contract to comprehensively implement the electrical architecture of Grand Paris Express Line 15 South. The contract covers implementation of the 20 kV network electrical construction from the 10 Enedis supply substations and to implement electricity distribution for the Line 15 South tunnels, stations and structures to the 250 low-voltage distribution boards. The contract also covers the installations that help ensure passenger, rail tunnel and station safety (lighting, emergency service electrical outlets and telephone systems, temperature rise sensors). The new 33-km metro Line 15 South will connect 22 municipalities in four administrative departments, and will have 18 new stations between Pont de Sèvres and Noisy Champs. Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20181019-0830.htm. 42/18.