Girder Ingenieros SL from Donostia-San Sebastian secured the EUR 1.01 million contract, excluding VAT, for the technical assistance for the construction management of the revised project for section 2 of the lining reinforcement and facilities adaptation project, for the tunnel towards San Sebastian part of the twin-tube Belabieta tunnel (1.8 km) on the A-15 motorway. Contact Diputacion Foral of Gipuzkoa, Donostia-San Sebastian, tel +34 943112366, email bidekontratazioa@gipuzkoa.eus. Visit https://ted.europa.eu/en/notice/-/detail/287812-2025 . Ref.n. 1-IN-1/2019 S2-RP-DO. 19/25.