Singapore, Paya Lebar - sg/18

Cable Ducts

  PowerGrid, a subsidiary of Singapore Power, plans to drive power tunnels at around 50 m depth to connect power stations west of the island to consumers in east. Likely to be 5 m i.d. segmentally lined using closed TBM. Three tunnels in design, 16 km-long, 12 km-long and 2 km-long. Visit www.singaporepower.sg August 2000.Downer EDI has been awarded a contract by PowerGrid, a subsidiary of Singapore Power, for the design and construction of a 2.65 km-long 5.4 m internal diameter transmission cable tunnel from Harbour Drive to the Labrador 400kV substation. Valued at S$66 million, work on the project will commence in May 2003 and the tunnel is scheduled for completion by the end of July 2005. Visit www.downeredi.com, www.powergrid.com.sg and www.spower.com.sg 20/03.



Permalink