Postponed from 01/09/2021 to 08/09/2021 the deadline of the open invitation to tender for the design and construction of a TBM tunnel, Cut & Cover tunnel, underground ramp, elevated ramp after Transport Nagar and 3 underground metro stations (Kanpur Central, Jhakarkatti and Transport Nagar). The contract will include architectural finishes, E&M, TVS, ECS etc on Line 1 of Kanpur MRTS, India. Value of the contract is EUR142.16 million (INR12.5 bn), excluding VAT. Duration of the contract is 36 months. Contact Uttar Pradesh Metro Rail Corporation (UPMRC) Ltd, attn Col. Ashish Dwivedi, Lucknow, tel +91 9746837100, email cecontract@upmrcl.co.in. For further information please click here and also please click here. Ref.n. KNPCC-06. 33/21.
India-Lucknow: Construction work for bridges and tunnels, shafts and subways
2021/S 161-421575
Corrigendum
Notice for changes or additional information
Works
(Supplement to the Official Journal of the European Union, 2021/S 119-311594)
Legal Basis:
This contract will be financed by European Investment Bank (EIB) and is subject to the EIB's Guide to Procurement.
Section I: Contracting authority/entity
I.1)Name and addresses
Official name: Uttar Pradesh Metro Rail Corporation (UPMRC) Ltd.
Postal address: Administrative Building, Near Dr Bhimrao Ambedkar Samajik Parivartan Sthal, Vipin Khand, Gomti Nagar, Lucknow, Uttar Pradesh
Town: Lucknow
NUTS code: IN India
Postal code: 226010
Country: India
Contact person: Col. Ashish Dwivedi (Chief Engineer/Contract)
E-mail: cecontract@upmrcl.co.in
Telephone: +91 9746837100
Internet address(es):
Main address: www.upmetrorail.com
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Design and Construction of tunnel with three (03) underground metro stations between Kanpur Central to end of Nayaganj
Reference number: EIB-GtP/KNPCC-06
II.1.2)Main CPV code
45221000 Construction work for bridges and tunnels, shafts and subways
II.1.3)Type of contract
Works
II.1.4)Short description:
Design and Construction of TBM Tunnel, Cut & Cover Tunnel, underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India
Section VI: Complementary information
VI.5)Date of dispatch of this notice:
16/08/2021
VI.6)Original notice reference
Notice number in the OJ S: 2021/S 119-311594
Section VII: Changes
VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 01/09/2021
Read:
Date: 08/09/2021
Section number: IV.2.7
Instead of:
Date: 02/09/2021
Read:
Date: 09/09/2021
VII.2)Other additional information: