2.3 km extension to line U6 with 1.4 km bored tunnel underway by Kunz for completion 2006. 1.3 km cut and cover extension to line U1 underway by Technobau Porr, Radmer and TGB with two stations by Wayss & Freytag, Porr Technobau and Spie. 1.5 km of tunnels on line U1 due to start construction June, 2001 for completion 2006. Visit www.porr.ch 25/01.Wayss & Freytag, Hochtief and Bauer Spezialtiefbau have secured a EUR73.6 million contract to build a northwest extension to Line 3 between Olympia Einkaufszentrum (OEZ) and Moosach. The project includes two single-track tunnels. The 7.3 m-outer diameter tunnels will be excavaded by means of a hydroshield TBM. Also, two stations will be built in cut and cover. Work start in September 2004 for ending in July 2009. Visit www.wf-ingbau.de and www.hochtief.de 38/04.Open call for tenders, deadline 11th January, 2005 for electrical outfit in the tunnels on Line 3 extension, section Olympiazentrum - Olympia-Einkaufszentrum. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=189443-2004, OJ S 220, or contact Landeshauptstadt München, Munich, fax +49 8923360215. 47/04.