Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Baden Wuerttemberg - de/22

Railway

Award of contract to Porr International of Austria for construction of Lots 1A and 1B twin-tube tunnels on Stuttgart-Ulm project. Lot 1A is the 9.5 km-long Filderstadt tunnel to be excavated in Keuper gypsum/marl and marl/sandstone. Lot 1B is the 12.3 km-long Ober-Untertuerkheim connection to be excavated with associated structures in Keuper marls and Upper Quaternary deposits. NATM or TBM methods can be used in both lots. Further information from Axel Heintel at Deutsch Bahn AG in Stuttgart, tel +49 71193319-361, fax +49 69-26521939. For full history of Stuttgart 21 project over the last 10 years visit tunnelbuilder archive de/22. Visit www.porr.at. 31/11.



Permalink