Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Garmisch-Partenkirchen - de/114

Road


The JV ILF Consulting Engineers Austria GmbH (Rum bei Innsbruck) and Müller + Hereth – Ingenieurbüro für Tunnel- und Felsbau GmbH (Freilassing) secured the EUR4.46 million contract, excluding VAT, for the design of the 4.9km section of the Garmisch-Partenkirchen Eastern bypass, including the 3.5km Wank tunnel with its safety parallel tunnel and the connections with the B2 roads. The bypass will replace the old B2 road section.  Contact Staatliches Bauamt Weilheim, Weilheim, tel +49 8819900, fax +49 8819901000, email poststelle@stbawm.bayern.de.   For further in the TED tender, please click here. Ref.n. 20S0071. 04/21. 

 




Permalink