Lombardi Ingenierie from Lyon have secured the EUR 300,000 contract, excluding VAT, for assistance to Sytral in relation to environmental aspects for the construction of the West Lyon Express Tramway or TEOL. The line will be 6.5 - 7 km long, including 3-4 km of tunnel. Contact Sytral Mobilites, attn Bruno Bernard, Lyon, tel +33 472845800, fax +33 478531284, email unitemarches@sytral.fr. Visit https://ted.europa.eu/en/notice/-/detail/284249-2025. Ref.n. 24M0119. 18/25