Invitation to tender using negotiated procedure, deadline 13.11.2013, for reinforced shotcrete lining work in 2,613 m-long Rolleboise rail tunnel on Paris Saint Lazare to Le Havre line between Rosny sur Seine and Bonnieres. Approximately 20 percent of tunnel to be retemplated, and in these areas steel fibre reinforced shotcrete may be used. Duration of contract 15 months after award. Contact Hilaire Franchequin at SNCF-DT AI IDF and MN in Paris, tel +33 153337007, e-mail hilaire.franchequin@sncf.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=359258-2013. NUTS-Code FR103. 43/13.