Invitation for registration of interest, deadline 28th July, 2006 for civil construction works of the Nadarivatu hydropower project, including excavation of a 3 m-diameter, 2 km-long tunnel. The project is expected to be implemented between November 2006 and May 2008. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=137214-2006, OJ S 129, or contact MWH New Zealand Ltd, Dunedin, fax +64 34770616. E-mail greg.brown@mwhglobal.com 29/06.Invitation for bids, deadline 14th March, 2008 for civil works (contract MR 77/2007) for the Nadarivatu hydropower project, which includes several structures. Among these, a water conveyance system consists of two options, either a 1,936 m low pressure tunnel, surge/drop shaft, 1,349 m high pressure tunnel and tunnel discharge isolating valve, or a 1,936 m low pressure tunnel, surge chamber, tunnel discharge isolating valve and 1,448 m high pressure penstock. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279507-2007, OJ S 230, or contact Fiji Electricity Authority, Suva, fax +679 3311882. E-mail tdelairewa@fea.com.fj 49/07.The deadline to bid for the civil works for the Nadarivatu renewable energy project (contract MR77/2007) has been set to 6th May, 2008. The scope of the civil works includes a construction camp, the Korolevu weir on the Sigatoka river, the Nadarivatu water conveyance system, which consists of an intake structure and either conveyance option 1 tunnel comprising a 1,936 m low pressure tunnel, surge/drop shaft, 1,349 m high pressure tunnel and tunnel discharge isolating valve or conveyance option 2 tunnel penstock comprising a 1,936 m low pressure tunnel, surge chamber, tunnel discharge isolating valve and a 1,448 m high pressure penstock. Click fj/11. Contact Fiji Electricity Authority, Mr Tuvitu Delairewa, Private Mail Bag, 2 Marlow Road, Suva, Fiji Islands. Tel. +679 3224185, fax +679 3316773, e-mail TDelairewa@fea.com.fj. Visit www.evalua.com.au/fea/OpenProjectList 14/08.