Felbermayr Bau GmbH & Co KG from Salisburgo secured the EUR237,320.48 contract, excluding VAT, for the preliminary excavation in rock of the Sill river Gorge on the Austrian side of the Brenner Base Tunnel BBT project. Contact Brenner Base Tunnel BBT SE, att.n Dr Johann Hager, Innsbruck, tel +39 (0)43 5124030, fax +39 (0)43 5124-030/110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=042648-2017. Bid Code AP249. 05/17.