The Joint Venture GEOs3D & Messkonzept from Telfs have secured the EUR 56,280.00 contract, excluding VAT, for the provision of control measurements to monitor the segment geometry for lot H41 (Sill river Gorge - Pfons) of the Brenner Base Tunnel on the Austrian side. Contact Brenner BBT SE Brenner Basis Tunnel, Innsbruck, tel +43 5124030, fax +43 5124030110, email ava@bbt-se.com. VVisit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=719826-2022 Ref.n. AP370. 01/23.