Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Brenner - at/16

High Speed Railway


The Joint Venture GEOs3D & Messkonzept from Telfs have secured the EUR 56,280.00 contract, excluding VAT, for the provision of control measurements to monitor the segment geometry for lot H41 (Sill river Gorge  - Pfons) of the Brenner Base Tunnel on the  Austrian side. Contact Brenner  BBT SE Brenner Basis Tunnel, Innsbruck, tel +43 5124030, fax +43 5124030110, email ava@bbt-se.com. VVisit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=719826-2022 Ref.n. AP370. 01/23.   



Permalink