Proposal for 7 km twin-tube road tunnel with two lanes in each direction at maximum depth 400 m with grade 6%. Estimated cost Aus$750 million. Required by 2005. Details from Pat Flanagan, e-mail skullcave@iig.com.au March 2000.
Permalink
For Currency Converter click HERE
19.02.2026 Sweden
23.02.2026 Switzerland
23.02.2026 Denmark
24.02.2026 Italy
25.02.2026 United Kingdom
19.03.2026 Bulgaria
24.03.2026 Italy
31.03.2026 Ireland
23.04.2026 Sweden
24.04.2026 United Kingdom
04.05.2026 Switzerland
04.06.2026 Switzerland
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.