Systra signed two contracts worth EUR36 million with the Hanoi Metropolitan Rail Transport Project Board (HRB) for Hanoi's first metro line, estimated at EUR500 million. Lead consultant, Systra will be responsible for the design studies, preparation of the tender documents, bid assessment, supervision of construction and rolling stock production and assistance to the commissioning and operation. Systra already carried out the feasibility and planning studies. Tenders for construction are expected to be invited in 2008 for opening in October 2010 for the city's millenium. Line 1, for which Systra already undertook the feasibility and planning studies, stretches for 12.5 km going from Nhon (depot and workshop) to the railway station. There is a 2.9 km underground section in the city centre, planned to be built using the cut-and-cover method (5 to 8 m high), with four underground stations. Read E-News Weekly 7/2007. Visit www.systra.com 49/07.
COLAS Rail SA secured the EUR44.65 million contract, including VAT, for design, supply and installation of the 3rd rail system on the Nhon – Hanoi railway station (Lot CP-08). The Pilot Metro Line will be 12.5 km long with 4 km underground. Contact Hanoi Metropolitan Railway Management Board (MRB), under Hanoi City People Committee (HPC), Hanoi, Vietnam, tel +84 4 3943 5127, fax +84 4 3943 5126. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=383544-2016. Ref.n. HPLMLP/CP-08. 45/16.
Hanoi Urban Railway Project Management Board (MRB) awarded to FECON Joint Stock Company from Hanoi the EUR 6.33 million (VND195.55 bn) contract for the Xuan Dinh Depot foundation of the Hanoi metro line 2, Nam Thang Long - Tran Hung Dao section. The construction area has an area of about 11 hectares in Xuan Dinh Ward, Hanoi City. The implementation time of the package is 499 days. The entire Metro Line 2 project is expected to be completed in 2029. Visit https://fecon.com.vn and https://tenders.mrb.hanoi.vn/projects/. 39/25.