Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

France

France, Paris - fr/127

Grand Paris Express

Closing Date: 08.01.2014 (Tender Closed)

Negotiated invitation to tender, deadline 08.01.2014, for general management during construction of the two new sections of Grand Paris Express: Saint-Denis Pleyel/Le Bourget RER - a 6 km-long tunnel with two stations at Saint-Denis Pleyel and La Courneuve Six Routes - and Mairie de Saint-Ouen/Saint-Denis Pleyel,  a 1.5 km-long tunnel. Contract duration 132 months after award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=408888-2013. Ref. n. PN2013-14. 49/13.



Permalink

Negotiated invitation to tender, deadline 19.12.2013, for technical building inspection on the 23 km-long Noisy-Champs (station included) - Villejuif Louis Aragon (station not included) section of the Line 15 of Grand Paris Express. The section includes an electricity tunnel at a 17-53 m depth, connection tunnels, TBM launch shafts and eight underground stations. Contract duration 103 months after award. Contact Societe du Grand Paris, att.n M. Martinat Severine, Saint-Denis, tel +33 182462000, fax +33 182462031, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412834-2013. Ref. n. PN2013-16. 50/13.



Permalink

Negotiated invitation to tender, deadline 21.02.2014, for security and health protection coordination concerning the design and construction of the Line 15 of Grand Paris Express. The bid includes two lots: CSPS T2 and CSPS T3. Contract duration 100 months after award. Contact Societe du Grand Paris, att.n M. Debuire Jean-Baptiste, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040167-2014. Ref. n. PN2013-17. 06/14.



Permalink

Negotiated invitation to tender, deadline 04.04.2014, for general management during construction of the new 14 km-long tunnel section Olympiades (excluding station)-Orly Airport, a southern extension of Line 14. The section will include seven new stations (Maison Blanche Paris xiii, Kremlin Bicetre Hospital, Institut Gustave Roussy IGR, Chevilly  Trois Communes, M.I.N.-Porte de Thiai, Pont de Rungis and Aeroport d'Orly) and 12 other infrastructures. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082578-2014. Ref. n. PN2014-01. 11/14.



Permalink

Invitation to tender by restricted procedure, deadline 24.03.2014, for construction of a shaft and a survey tunnel for geotechnical tests prior to the construction of the future Arcueil/Cachan station on the Line 15 South of Grand Paris Express. Contract duration 10 months after award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, website https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=158691&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=080501-2014. Ref. n. MAPA2014-04-Candidature. 12/14.



Permalink

Negotiated invitation to tender, deadline 28.05.2014, for sinking of 25 m-deep x 7 m-diameter shaft and gallery to facilitate test drilling, boring and grouting work for stations at Saint Maur Creteil and Champigny Centre on Red Line 15 south. Further information, specs and docs from Mlle Staadal Maude at Societe du Grand Paris, Saint-Denis, tel +33 182462000, website www.marches-publics.gouv.fr. Tenders and requests to participate to above address, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151502-2014. 19/14.



Permalink

Negotiated invitation to tender, deadline 01.12.2014, for technical assistance services during construction of infrastructures and systems of the Green Line 18 of driverless metro in Paris, section Aeroport d'Orly - Versailles-Chantiers. Duration contract 24 months from award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=374465-2014. Ref.n. PN2014-18_14S0196. 45/14.



Permalink

Negotiated invitation to tender, deadline 15.12.2014, for the project management during construction of the 20 km-long Pont de Sevres (station not included) - Saint-Denis-Pleyel (station not included) section of the Line 15 of Grand Paris Express. The section includes nine stations. Contract duration 156 months after award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389803-2014. Ref. 2014PN020-14S0203. 48/14.



Permalink

Egis Rail at Lyon secured the contract for general management during construction of the two new sections of Grand Paris Express: Saint-Denis Pleyel/Le Bourget RER - a 6 km-long tunnel with two stations at Saint-Denis Pleyel and La Courneuve Six Routes - and Mairie de Saint-Ouen/Saint-Denis Pleyel, a 1.5 km-long tunnel. Contact Societe du Grand Paris, attn Severine Martinat, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=416083-2014. Ref. n. PN2013-14. 50/14.



Permalink

Becs SARL of Boulogne secured Lot 1 (T2 section) and SA Presents of Lyon secured Lot 2 (T3 section) for security and health protection coordination concerning the design and construction of the Line 15 of Grand Paris Express. Contact Societe du Grand Paris, att.n M. Debuire Jean-Baptiste, Saint-Denis, tel +33 182462000, fax +33 182462031.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=002877-2015. Ref. n. PN2013-17. 02/15.



Permalink

Negotiated invitation to tender, deadline 23.01.2015, for construction works between the stations of Pont de Sevres and Noisy Champs on Red Line 15 south. Further information, specs and docs from Mlle Staadal Maude at Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=439936-2014. 02/15.



Permalink

Negotiated invitation to tender, deadline 13.05.2015, for geotechnical assistance to the general management during construction of RTPGP (Reseau de Transport Public du Grand Paris). The contract is composed of four lots: line 15 East (lot 1), line red 15 West (lot 2), line red 17 (lot 3) and line green 18 (lot 4). Value of contract EUR17 million, excluding VAT, duration 72 months. Contact Societe du Grand Paris, att.n m.lle Staadal Maude Saint-Denis, tel +33 182462000, fax +33 182462031, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120979-2015. Ref. n. 2015PN012. 16/15.



Permalink

Prior Information Notice for construction and civil engineering work from Noisy Champs to Pont de Sevres on Red Line 15 south. Contact Societe du Grand Paris at Saint-Denis. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135407-2015. 17/15.



Permalink

Setec TPI of Paris secured the contract for general management during construction of the new 14 km-long tunnel section Olympiades (excluding station)-Orly Airport, a southern extension of Line 14. The section will include seven new stations (Maison Blanche Paris xiii, Kremlin Bicetre Hospital, Institut Gustave Roussy IGR, Chevilly  Trois Communes, M.I.N.-Porte de Thiai, Pont de Rungis and Aeroport d'Orly) and 12 other infrastructures. Contact Societe du Grand Paris, attn Martinat Severine, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160798-2015. Ref. n. PN2014-01. 19/15.

 



Permalink

Negotiated invitation to tender, deadline 02.06.2015, for water and environmental law investigation prior to start of construction of 14 km-long tunnel Olympiades (excluding station)-Orly Airport, a southern extension of Line 14. The section will include seven new stations and 12 other infrastructures. Duration of contract 26 months from award. Contact RATP, att.n Mounira Soilihy, tel +33 158774495, fax +33 158774645, website www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=171465-2015. Ref. n. 15-0075-MOP. 21/15.



Permalink

Open invitation to tender, deadline 21.07.2015, for further preliminary studies about construction of Line 15 East from  Saint-Denis Pleyel to Champigny Centre for RTPGP (Reseau de Transport Public du Grand Paris). Duration of contract 48 months. Contact Societe du Grand Paris, att.n Mrs Legrand Dominique, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=247781&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205785-2015. Ref. n. 2015AOO010. 25/15.



Permalink


Negotiated invitation to tender, deadline 28.08.2015, for the tests and analysis of tests for the characterization of soil’s mechanical properties  and vibration transfer during construction of RTPGP (Reseau de Transport Public du Grand Paris). Value of contract EUR1.5-2.5 million, excluding VAT, duration 72 months. Contact Societe du Grand Paris, attn Renteux Jeremy, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262831-2015. Ref. n. 2015PN031. 31/15.




Permalink


Negotiated invitation to tender, deadline 11.09.2015, for  construction (tunnel, station and civil works) from Fort d'Issy Vanves Clamart station (not included) and Villejuif Louis Aragon station (included) on Red Line 15 south. Further info from https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=212409&orgAcronyme=s2d. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=276280-2015. Ref.n. 2015PN037. 34/15.




Permalink


Invitation to tender using negotiated procedure, deadline 23.10.2015, for construction of shafts and survey tunnels with pre ground treatments by jet grouting and freezing on the future Red line, Grand Paris Express. Duration contract 15 months from awards. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031. Further information from https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=266511&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339935-2015. Ref.n. 2015PN038 – Candidatures. 40/15.




Permalink



Altamira Information part of the CLS Group secured the EUR4,5million contract for the satellite-based supervision of the Grand Paris Express project. The project includes the construction of 200 additional km of metro lines and 68 new stations that will link the transport hubs of Greater Paris, the three airports and the TGV (high-speed train) stations. The project involves overcoming geotechnical difficulties in certain areas, the new network will need to take into account existing key infrastructures, and works will take place in densely or very densely populated and built-up areas. All these factors demand an accurate surveillance in order to minimise any possible impact that this 15-year long construction may have in the area. A monthly report will be created to inform people about stable and moving areas, enabling the general managent to assess the impact of the excavation on the surface and to decide on possible adjustments. Visit http://www.altamira-information.com/news/view/grand-paris-express-altamira-information-in-charge-of-the-satellite-surveil/2015. 41/15.




Permalink


Negotiated invitation to tender, deadline 18.11.2015, for engineering works on the Villejuif Louis Aragon (station not included) section of Line 15 of the Grand Paris Express. The section includes tunnels and associated works. The contract duration will be for 72 months after the award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=274399&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380317-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367456-2015. Ref. n. 2015PN039. 44/15.




Permalink


Negotiated invitation to tender, deadline 18.11.2015, for engineering works on the section 1103p exit shaft - Bry-Villiers-Champigny station on Line 15 of the Grand Paris Express. The section includes tunnels, stations and associated works. The contract duration is for 72 months after the award. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=212409&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380316-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367455-2015. Ref. n. 2015PN040. 44/15.




Permalink


The Group SETEC TPI/Systra/as.architecture-studio/Agence Search/Wilmotte et Associés SA /Jean-Paul Viguier et Associés/Marin + Trottin Architectes/Périphériques in Paris secured the contract for project management during the construction of the 20 km-long Pont de Sevres (station not included) - Saint-Denis-Pleyel (station not included) section of the Line 15 of Grand Paris Express. The section includes nine stations. Contact Societe du Grand Paris, att.n Legrand Dominique, Saint-Denis, tel +33 182462000, fax +33 182462031. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412229-2015. Ref. 2014PN020-14S0203. 48/15.




Permalink


Negotiated invitation to tender, deadline 22.01.2016, for the general management of the construction of Line 15 East from  Saint-Denis Pleyel (station not included) to Champigny Centre (station not included) as part of the Grand Paris Express. Duration of the contract is 192 months. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=442609-2015. Ref. n. 2015PN050. 01/16.




Permalink


Negotiated invitation to tender, deadline 17.02.2016, for safety inspections and evaluations (mission OQA) of the public transport system for the following Grand Paris Express sections :-

Le Bourget RER (station not included) - Mesnil-Amelot (station included) on Line 17 North; 

Pont de Sevre (station not included) - Saint-Denis Pleyel (station included) with 21 km tunnel on Line 15 West; 

Saint-Denis Pleyel (station not included) - Champigny Centre (station included) with 26 km tunnel on Line 15 East;  

Airport Orly (station not included) and Versailles-Chantiers (station included) on Line 18. 

The duration of the contract is 83 months. Please contact Societe du Grand Paris, att.n Debuire Jean-Baptiste, Saint-Denis, tel +33 182462000, fax +33 182462031, website https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=276592&orgAcronyme=s2d. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=28649-2016. Ref. n. 2015PN046. 05/16.




Permalink


Negotiated invitation to tender, deadline 19.08.2016, for Lot 2 (11.1 km tunnel and 4 underground stations) and Lot 3 (5.5 km tunnel and 1 underground station), part of the civil works on Line 16 of the Grand Paris Express and its connections to Line 14, Line 15 and Line 17 and the Aulnay maintenance site. The contract duration is for 72 months after award. Contact Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855, fax +33 175622362, e-mail sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=237801-2016. Ref. n. 2016pn019. 28/16.




Permalink


Periodic indicative notice without call for competition for civil works on Line 16 of Grand Paris Express and its connections to Line 14, Line 15 and Line 17 and the Aulnay site maintenance. The contract, composed of 3 lots, will include track works on part of the infrastructure.

Lot 1: a 19.6 km tunnel driven by 6 TBMs (diameter 9.80 m, 8.85 m and 7.70 m), a 560 m section to the adit of maintenance site and 5 underground stations at Stade de France, Saint-Denis Pleyel, La Courneuve «Six routes», Le Bourget RER and Le Blanc Mesnil.

Lot 2: 11.1 km tunnel driven by 2 TBMs (diameter 9.80 m) and 4 underground stations at Aulnay, Sevran-Beaudottes, Sevran-Livry and Clichy-Montfermeil.

Lot 3: 5.5 km tunnel driven by 1 TBM (diameter 9.80 m) and the underground Chelles station.

Further information from Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855, fax +33 175622362, e-mail Travaux.ligne16@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185696-2016. 28/16.




Permalink

Soletanche Bachy France from Rueil-Malmaison and SADE CGTH in Paris secured the contract for construction of shafts and survey tunnels with pre ground treatments by jet grouting and freezing on the future Red line, Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295570-2016. Ref.n. 2015PN038. 35/16.




Permalink


Negotiated invitation to tender, deadline 30.11.2016, for the civil works inside the 18.4 km tunnel which will be built with a TBM. Works include trenches, stations and related works between Saint-Ouen and the Aulnay operations center. Duration of the contract is 72 months. Further information from Societe du Grand Paris, att.n M. Dominique Legrand or Yacine Bemrah, Saint-Denis, tel +33 175623855-2362, fax +33 175622362, e-mail sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=384686-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=371314-2016. Ref.n. 2016PN019-L01. 45/16.




Permalink

The group Demathieu Bard Construction (leader of Group) from Montigny-lès-Metz, NGE Génie Civil from Saint-Étienne-du-Grès, Impresa Pizzarotti & C SpA from Parme, Guintoli SAS from Saint-Étienne-du-Grès, GTS SAS from Saint-Priest, Frankki Foundations Belgium from Saintes, Atlas Fondations from Lezennes and Implenia from and GTS SAS from Saint-Priest secured the contract for construction of a tunnel and ancillary works from Noisy-Champ to Bry-Villiers-Champigny for the Line 15 of Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=436109-2016. Ref. n. 2015PN028. 50/16.



Permalink


Negotiated invitation to tender, deadline 09.05.2016 , for technical inspection on structures and systems of Lines 15 East (Lot 2) and 18 (Lot 1) for the Greater Paris Express. For each lot the value of the contract is EUR3 million, excluding VAT, with a 171 month duration. For further information https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=287478&orgAcronyme=s2d where tenders have to be submitted. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=139665-2016. Ref.n. 2016PN004. 16/16.




Permalink


Bureau Veritas SA from Neuilly-sur-Seine secured the contract for technical inspections on Line 18’s structures and systems for the Greater Paris Express (Lot 1). Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=441929-2016. Ref.n. 2016PN004. 50/16.




Permalink

Postponed until the 22.12.2016 the deadline for the negotiated invitation to tender for Lot 2 (11.1 km tunnel and 4 underground stations) and Lot 3 (5.5 km tunnel and 1 underground station), which are pats of the civil works on Line 16 of the Grand Paris Express and its connections to Line 14, Line 15 and Line 17 this includes the Aulnay maintenance site. The contract duration is for 72 months after the award. Contact Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855, fax +33 175622362, e-mail sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=445925-2016, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=421343-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=404858-2016. Ref. n. 2016pn019. 51/16.



Permalink


Awarded the contracts for the assistance to general management for topographic services for the construction of the Grand Paris Express network. The contract is composed of 5 lots: Lot 1 involves section T1, le Bourget (included) - Noisy Champs (not included) and the Aulnay maintenance site; Lot 2 involves section T5, Le Mesnil-Amelot (included) - Saint Denis Pleyel (included); Lot 3 involves section 4, Pont de Sèvres (not included) - Saint-Denis Pleyel (not included); Lot 4 involves section 7, Aeroport d'Orly (not included) - Versailles Chantiers (included) and the Palaiseau maintenance site; Lot 5, Section T8, Saint-Denis Pleyel (not included) - Champigny centre (not included) and the Rosny-sous-Bois maintenance site.

Techniques Topo at Paris, Progexial at Longjumeau and Secteur from Santeny secured Lots 1B, 2B, 3B, 4B and 5B; SA Fit Conseil from Nantes secured Lots 1A, 2A, 3A, 4A and 5A. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=034069-2017. Ref.n. 2015PN025. 05/17.




Permalink


The joint venture made up of VINCI Construction, the lead company, associated with Spie batignolles secured the EUR926 million contract, excluding VAT, to build the T3C section of Line 15 South of the future Grand Paris Express transport network between the Fort d’Issy-Vanves-Clamart and Villejuif Louis Aragon stations in Paris. The contract includes the construction using two EPB TBMs  the tunnel is 8 km and will have 5 new stations (Châtillon Montrouge, Bagneux, Arcueil-Cachan, Villejuif Institut Gustave Roussy and Villejuif Louis Aragon) and 8 new shafts. The project will take 70 months to complete. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000.Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20170222-1745.htm. 08/17.




Permalink

Negotiated invitation to tender, deadline 11.04.2017, for civil works for tunnels, opened and covered trenches, railway stations, ancillary works on Line 18 of the Grand Paris Express. The bid is composed of two lots : lot 1 includes 11.4 km tunnel to be driven by TBM with 7.8 m diameter, 3 underground stations (Antonypole, Massy Opera, Massy-Palaiseau), the duration of the contract is 67 months ; lot 3 includes 8.2 km tunnel  by TBMs and 3 underground stations at Saint-Quentin-Est, Satory and Versailles-Chantiers, with a 96 months duration. Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=084824-2017. Ref. n. 2017PN007-candidatures. 10/17.



Permalink

Additional information for the negotiated invitation to tender, deadline 11.04.2017, for civil works for tunnels, opened and covered trenches, railway stations, ancillary works on Line 18 of the Grand Paris Express. The bid includes two lots : lot 1 includes 11.4 km tunnel to be driven by a TBM with 7.8 m diameter, 3 underground stations (Antonypole, Massy Opera, Massy-Palaiseau), duration 67 months ; lot 3 includes 8.2 km tunnel driven by TBMs and 3 underground stations at Saint-Quentin-Est, Satory and Versailles-Chantiers, with a 96 months duration. Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102391-2017. Ref. n. 2017PN007-candidatures. 12/17.



Permalink


Negotiated invitation to tender, deadline 17.07.2017, for the supply of External Controls on Civil Engineering and Waterproofing for Line 16 (35 km length of tunnels included) for the Grand Paris Express and its connections to L14, 15 and 17 lines and for the maintenance of the Aulnay site. The bid is composed of two lots. The duration of the contract is 85 months. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202574-2017. Ref. n. 2017PN008. 22/17.




Permalink

Techniques topo sa - SCOP from Paris and Progexial sarl from Longjumeau secured the Lots 1, 3 and 4 contracts for the topographic controls for the construction of Line 15 South of the future Grand Paris Express transport network between Noisy-Champs and Pont de Sevres stations, stations included. Fit Conseil Selafa from Nantes secured the contract for Lot 2). Contact Societe du Grand Paris, att.n Rachel Lefevre Saenz, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=268744-2017. Ref. n. 2015PN012. 28/17.



Permalink

Grand Paris Express has awarded the final two civil works contracts for the construction of the EUR3.7 billion 33km Line 15 South of the Grand Paris Express.

 

A consortium led by Bouygues TP and including Soletanche Bachy France, Soletanche Bachy Tunnels, Bessac and Sade has won lot T3A of line 15 South, comprising civil engineering works between the stations of Pont de Sevres (included) and Fort d’Issy-Vanves-Clamart (not included). The EUR513 million contract, excluding VAT, involves the digging of the 4.2 km monotube tunnel Pont-de-Sèvres and Issy RER stations included and the entrance TBM shaft for the Line 15 South linking Pont-de-Sèvres and Noisy Champs in the southern suburbs of Paris.

 

A consortium led by Vinci Construction France and including Dodin Campenon Bernard, Spie Batignolles TPCI, Botte Fondations, Spie Fondations and VINCI Construction Grands Projets secured the EUR 156 million contract, excluding VAT, to construct Noisy Champs station.

 

By the end of the year, 41 work sites will be opened, the first of 10 TBMs  will be launched at Champigny. Visit https://www.societedugrandparis.fr/actualite/ligne-15-sud-du-grand-paris-express-tous-les-marches-de-genie-civil-attribues and for further information click here. 28/17.



Permalink

Bureau Veritas Exploitation from Levallois-Perret secured the contracts Lots 1, 3 and 4 for the external environmental controls for the construction of Line 15 South of the future Grand Paris Express transport network between Noisy-Champs and Pont de Sevres stations, stations included. SAS SCE from Nantes and Cap Air - Rincent Environnement from Neuilly-Plaisance secured the contract for Lot 2. Contact Societe du Grand Paris, att.n Rachel Lefevre Saenz, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=346059-2017. Ref. n. 2016PN032. 36/17.



Permalink

Negotiated invitation to tender, deadline 12.01.2018, for the supply, installation and commission of elevators for the Grand Paris Express. The duration of the contract is 72 months. Further information from https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=353520&orgAcronyme=s2d.

Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=475835-2017.

Ref. n. 2016AC09. 49/17.



Permalink

SARL Cigma Ouest Saint Brieuc from Saint Brieuc secured the project management assistance to the contractual management for works and equipment for the Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=047084-2018.

Ref. n. 2017PN005. 06/18.



Permalink

The Societe du Grand Paris has awarded the first civil engineering contract to the consortium led by Eiffage Genie Civil and composed of Razel Bec, Eiffage Rail, Tso e Tso Catenaries. The value of the contract is  EUR1.84 billion, excluding VAT, for lines 14 North, 16 and 17 South of Grand Paris Express.`The contract includes the common section of lines 16 and 17, between the Saint-Denis Pleyel and Le Bourget RER stations (included), and its connection to the future Operative Center for lines 16 and 17 at Aulnay-sous-Bois, by the line 16 and Le Blanc-Mesnil train station (included). The contract also includes the extension of line 14 between the station Mairie de Saint-Ouen (excluded) and the station Saint-Denis Pleyel, as well as the crossing of this last station by the line 15 North. The contract includes the construction of the Saint-Denis Pleyel, La Courneuve Six-Route", Le Bourget RER and Le Blanc-Mesnil stations. For the digging of the 4 tunnels (19.3km)  6 TBMs  will be used. The commissioning of these sections is scheduled for the 2024 Olympic and Paralympic Games.

Click here for further information. Visit https://www.societedugrandparis.fr. 08/18.

https://www.societedugrandparis.fr/gpe/actualite/lignes-14-nord-16-et-17-sud-premier-marche-de-genie-civil-attribue-un-groupement




Permalink

The consortium led by VINCI Construction (Dodin Campenon Bernard, lead company; VINCI Construction France; VINCI Construction Grands Projets and Botte Fondations) together with Spie batignolles (Spie batignolles Genie Civil and Spie batignolles Fondations) has been awarded the EUR400 million contract, excluding VAT, to execute works package GC02 of the future Line 14 South of Grand Paris Express, between Olympiades (in the 13th arrondissement of Paris) and Orly Airport.

The contract requires the use of a TBM EPB to excavate a 4.6 km tunnel between Maison Blanche Paris XIII future station and the TBM starting shaft at Jean Prouve. It also includes construction of the new Kremlin Bicetre Hopital station and five ventilation and emergency shafts. The contract is scheduled to last 72 months. Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20180220-0830.htm.

08/18.



Permalink

The JV Eiffage genie civil Sas/Razel Bec Sas/Eiffage rail Snc/TSO Sas/TSO Catenaires Sas secured the contract for the civil works inside the 18.4 km tunnel which will be built with a TBM. Works include trenches, stations and related works between Saint-Ouen and the Aulnay operations centre.

Contact Societe du Grand Paris, att.n M. Dominique Legrand or Yacine Bemrah, Saint-Denis, tel +33 175623855-2362, fax +33 175622362, email sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=138217-2018.

Ref.n. 2016PN019-L01. 13/18.



Permalink

The negotiated invitation to tender for the supply, installation and commission of elevators for the Grand Paris Express has been discontinued. Contact Societe du Grand Paris,  attn. Jeremy Renteux, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158083-2018 .

Ref. n. 2016AC09. 15/18.



Permalink

Negotiated invitation to tender, deadline 06.06.2018, for design, supply, works, test, commissioning for the ventilation, decompression and smoke extraction systems in Line 15 South tunnels of Grand Paris Express.  Duration of the contract will be 70 months. For further information https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=355556&orgAcronyme=s2d. Contact Societe du Grand Paris, Saint-Denis, tel + 33 182462000, fax +33


182462031, email marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167844-2018. Ref.n. 2017PN025_Candidature. 16/18.




Permalink

Negotiated invitation to tender, deadline 21.06.2018, for the HW /LW equipment and works and for cabling of a Line 16 / 17s section for the Grand Paris Express. The duration of the contract is 101 months. Further information from https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=373191&orgAcronyme=s2d where offers must be sent. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=198453-2018 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209641-2018. Ref. n. 2018PN014_Candidature. 20/18.



Permalink

BECS Sarl in Boulogne secured the contract for coordination for safety and health protection (CSPS) for the design and construction of Line 18 of the Grand Paris Express. Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, email

marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=283410-2018.

Ref. n. 2016PN010. 27/18.



Permalink

The negotiated invitation to tender, deadline 11.04.2017, for lot 3 which includes the construction of a 8.2 km tunnel by TBMs. Also 3 underground stations at Saint-Quentin-Est, Satory and Versailles-Chantiers on Line 18 of the Grand Paris Express, has been discontinued and the contract was not awarded. Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr .  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=292679-2018 .Ref. n. 2017PN007-candidatures. 29/18.



Permalink

Negotiated invitation to tender, deadline 04.09.2018, for track works on the Maison blanche -Orly Airport section of the southern extension of Line 14, Paris. Duration of the contract is 60 months from award. For the document https://ratp.bravosolution.com/web/login.html where offers must be sent.

Contact RATP, att.n Stephane Aref, tel +33 158771358, email stephane.aref@ratp.fr. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309430-2018.

Ref. n. DHA_2018GDI13099. 30/18.



Permalink

The JV T.T Geometres Experts (Parigi)/Progexial (Longjumeau) secured the  EUR745,000 contract, excluding VAT, for the External Topographic Controls on the extension to Orly Airport of  Line 14 (Lot PI 27). Contact RATP, att.n Swann Moulin, tel +33 158771925, email Swann.MOULIN@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=330536-2018.

Ref. n. DHA_2017MOP12304.  31/18.



Permalink

The contract for Lot 3 (5.5 km tunnel and 1 underground station), part of the civil works on Line 16 of the Grand Paris Express and its connections to Line 14, Line 15 and Line 17 and the Aulnay maintenance site, has been not awarded. Contact Societe du Grand Paris, att.n M. Dominique Legrand, Saint-Denis, tel +33 175653855 or M. Yacine Bemrah, tel +33 175622362, email travaux.ligne16@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=395594-2018. Ref. n. 2016pn019. 37/18.



Permalink

The Alise joint venture led by VINCI Energies via its subsidiary SDEL Transport Grands Projets, in partnership with Eiffage Énergie Systèmes (50/50), has won the Eur71 million contract to comprehensively implement the electrical architecture of Grand Paris Express Line 15 South. The contract covers implementation of the 20 kV network electrical construction from the 10 Enedis supply substations and to implement electricity distribution for the Line 15 South tunnels, stations and structures to the 250 low-voltage distribution boards. The contract also covers the installations that help ensure passenger, rail tunnel and station safety (lighting, emergency service electrical outlets and telephone systems, temperature rise sensors). The new 33-km metro Line 15 South will connect 22 municipalities in four administrative departments, and will have 18 new stations between Pont de Sèvres and Noisy Champs. Visit https://www.vinci.com/vinci.nsf/en/press-releases/pages/20181019-0830.htm. 42/18.




Permalink

Salini Impregilo has won the EUR718.8-million contract to build Lot 2 of the new metro line 16 for Grand Paris Express. The future Line 16 will serve a number of communes in the northern and eastern part of metropolitan Paris.The contract will involve the excavation of 11.1 km of tunnel and the construction of four stations at Aulnay, Sevran-Beaudottes, Sevran-Livry and Clichy Montfermeil, along with 11 related works. Visit https://www.salini-impregilo.com. 42/18.

 

https://www.salini-impregilo.com/en/press/press-releases/salini-impregilo-wins-718-8m-contract-for-grand-paris-express-project.html




Permalink

Hydrogeotechnique Nord et Ouest from Goussainville secured the contract for  the supply of External Controls on Civil Engineering (Lot 1) for Line 16 (35 km of tunnels included) for the Grand Paris Express and its connections to L14, 15 and 17 lines and for the maintenance of the Aulnay site. Contact Societe du Grand Paris, attn Rachel Lefevre Saenz, Saint-Denis, tel +33 182462000, fax+33 1182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=481026-2018.

Ref. n. 2017PN008. 44/18



Permalink

Negotiated invitation to tender, deadline 14.12.2018, for development works for  the Le Blanc-Mesnil railway station and its ancillary works on line 16 of the Grand Paris Express. The contract includes technical equipment, HT/LT,  Heating Ventilation and Air Conditioning, Plumbing, and Roadworks (Miscellaneous Networks) (VRD). The duration of the contract is 54 months. Further information from https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=391875&orgAcronyme=s2d where offers must be sent. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=421084-2018,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=473495-2018

 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=518133-2018.

Ref. n. 2018PN025. 47/18.



Permalink

Negotiated invitation to tender, deadline 18.12.2018, for development works for the La Courneuve railway station and its 5 ancillary structures on lines 16 and 17 of the Grand Paris Express. The contract includes works on technical equipment, HT/LT,  Heating Ventilation and Air Conditioning, Plumbing, and Roadwork Miscellaneous Networks (VRD). The duration of the contract is 54 months. Further information from https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=391903&orgAcronyme=s2d where offers must be sent. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=421088-2018,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=475824-2018

 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=518132-2018.

Ref. n. 2018PN026. 47/18.



Permalink

Negotiated invitation to tender, deadline 08.01.2019, for systems and works for ventilation, decompression and fume disposal in the tunnels of Lines 16 and 17 of the Grand Paris Express. The duration of the contract is 96 months. Further information from

https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=394837&orgAcronyme=s2 where offers must be sent. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=518101-2018.

Ref. n. 2018PN021. 47/18.



Permalink

Negotiated invitation to tender, deadline 14.01.2019, for the development works for the 12 structures between Pont de Sevres and  Villejuif Louis Aragon stations on line 15 South of the Grand Paris Express. The duration of the contract is 59 months. Further information from https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=393064&orgAcronyme=s2d where offers must be sent. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=506705-2018.

Ref. n. 2018PN042_candidature. 48/18.



Permalink

Negotiated invitation to tender, deadline 18.01.2019, for topographic external controls as part of the construction of line 18 of the Grand Paris Express, including an 11.5 km tunnel. The duration of the contract is 48 months. Further information from

https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=402762&orgAcronyme=s2d

where offers must be sent. Contact Societe du Grand Paris,  attn. Rachel Lefevre Saenz, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=574815-2018.

Ref. n. 2018PN005. 01/19.



Permalink

Negotiated invitation to tender, deadline 21.01.2019, for the final works on the Saint-Denis Pleyel section (stations and ancillary works) of lines 14, 16 and 17 of the Grand Paris Express, after the main civil works have been carried out. The contract duration is for 48 months after award. For documents https://www.marches-publics.gouv.fr/index.php?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=404666&orgAcronyme=s2d where offers must be sent.  Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, e-mail marches-sgp@societedugrandparis.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=005642-2019 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=542272-2018.

Ref. n. 2018PN049. 02/19.



Permalink

Societe du Grand Paris (SGP) secured a EUR440 million contract for the JV Avenir, consisting of Implenia, Demathieu Bard Construction, Royal BAM Group and Pizzarotti (each with a 25 percent stake) to build Section 1 of the new metro line 17 North of the Grand Paris Express.

Section 1 consists of a 6 km tunnel, two new underground metro stations (Le Bourget Aeroport and Triangle de Gonesse), six annex structures (mainly ventilation shafts and security access shafts), the TBM interim starting shaft in Bonneuil-en-France and a 750-m preliminary cut in Gonesse. The tunnel will be dug out using a 8.7 m diameter TBM. The geological conditions are well-known based on various drillings.

Special foundations work will start in May 2019. Visit https://www.implenia.com/en/media/media-releases?year=2019#2019-01-28-251143.

05/19.




Permalink

SWS has signed a new contract for the design check of Line 16 Lot 2 of the Grand Paris Express. The works had been awarded to Salini Impregilo – NGE last autumn. The line 16 lot 2 goes from Aulnay-sous-Bois to Chelles and includes 4 underground stations, 11 shafts and 11.1 km of tunnel. SWS is in charge of the external check of the whole project. Visit http://www.swsglobal.com/2019/02/25/grand-paris-metro-new-contract-for-sws/.

09/19.



Permalink

Prior information notice without call for competition for the passenger transport service of the first operating section lines 16 and 17 of the Grand Paris Express. Envisaged start date of the contract: 01/01/2022 with a duration of 96 months.

The date of the information conference on the tenders for the management of Lines 15, 16, 17 and 18 of the Grand Paris Express will be announced on https://www.iledefrance-mobilites.fr/les-projets/grand-paris-express/ .

Registration and participation in this conference are mandatory. Contact STIF (Syndicat des transports d’Ile-de-France), Paris, attn Mrs Juliette Vinck for Mr Laurent Probst, tel +33 147532800, email juliette.vinck@iledefrance-mobilites.fr.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=137658-2019.

Ref. n. GPE-2020-01. 14/19.




Permalink

The joint venture between Techniques topo - TT geometres experts from Paris and Progexial from Longjumeau secured the contract. The contract is for external topographic controls in the construction of Section 1 of the new metro line 17 North of the Grand Paris Express. Section 1 consists of a 6 km tunnel, two new underground metro stations (Le Bourget Aeroport and Triangle de Gonesse), six annex structures (mainly ventilation shafts and security access shafts), the TBM interim starting shaft in Bonneuil-en-France and a 750-m preliminary cut in Gonesse. The tunnel will be dug out using a 8.7 m diameter TBM. Contact Societe du Grand Paris, attn Rachel Lefevre-Saenz, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.

Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=243345-2019.

Ref.n. 2018PN035. 22/19.




Permalink

The JV SPIE Batignolles Energie and  Eaubonne/Satelec  from Viry-Chatillon secured the EUR2.9 million contract, excluding VAT, for Low Tension works and lighting in the maintenance and depot site (SMR) on the Olympiades-Orly Airport extension of Line 14 (Lot BT02/SMR12). Contact RATP,  Paris, tel +33 158771925, email swann.moulin@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=245546-2019.

Ref. n. DHA_2018MOP13664. 22/19.




Permalink

The Consortium composed of Eiffage Genie Civil (leader) and Razel-Bec secured the EUR795million contract for the construction of the section between Bry-Villiers-Champigny and Creteil l'Echat stations (Lot T2B) of the Grand Paris Express 15 Sud line in Val-de-Marne. The consortium also includes Eiffage Fondations, Sefi-Intrafor, Icop, Coteg and Capocci (subcontractors), as well as the partner engineering firms Egis and Tractebel. The contract involves digging a 7.2km double-track tunnel with 8.70m inner diameter, 3 stations (Bry-VilliersChampigny, Champigny Centre and Saint-Maur Creteil), 7 related rail structures between the stations and an additional one for the future connection with the 15 Est line. The work will require the use of two TBMs. Visit

https://www.eiffage.com/files/live/sites/eiffage-v2/files/Publication/Communiqu%c3%a9%20de%20presse/2018/Anglais/CP-Ligne-15-Sud-UK.pdf.

15/17.



Permalink

The Consortium composed of Bouygues Travaux Publics (leader) and Soletanche Bachy France, Soletanche Bachy Tunnels (Vinci), BESSAC and SADE secured the EUR807 million contract, excluding VAT, for the construction of the Grand Paris Express 15 Sud line section between  Villejuif Louis-Aragon and Creteil l’Echat stations (Lot T2A). The contract involves digging a 6.6km double-track tunnel with a 8.70m inner diameter, 4 stations (Creteil l’Echat, Vert-de-Maisons, les Ardoines and Vitry Centre), the shafts for the launch of the 2 TBMs (friche Arrighi),  5 related rail structures, a disconnection work between the 15 South Line and the connection to the infrastructure maintenance site (SMI) of Vitry-sur-Seine,  a connection with the SMI composed of a 1.1km mono track tunnel with a 6.7 m diameter, a 139 m  cut&cover section and a 312 m open section. Visit

http://www.bouygues-tp.com/uploads/press_release/34/cp-attribution-march-t2a-01022017.pdf.

05/17.



Permalink

Competitive dialogue, deadline 11/03/2020, for the design and construction of the South Section on line 15 West of the Grand Paris Express (M1_Cr_15o) between Pont de Sevres and La Defense.

The contract includes:

• a fixed part relating to the design and construction of the SaintCloud, Rueil-Suresnes Mont-Valerien, Nanterre La Boule and Nanterre-La-Folie stations, with approximately 10 km of tunnels, 11 service facilities and a connecting structure; • an optional tranche relating to the design and construction of the La Defense station, the tunnels on one side and the other of this station for a total of 4 km and a service building.

The duration of the contract is 120 months. Estimated date of dispatch of invitations to tender or to participate to selected candidates:

04/05/2020. For further information please click here where offers must be sent. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  For tender information please click here. Ref. n. 2020DC001_cand. 06/20.



Permalink

Negotiated invitation to tender, deadline 06/03/2020, for scheduling, management and coordination mission (OPC) for the southern extension of Line 14, Paris (Lot PI20). Duration of the contract is 60 months. For tender documents please click here where offers must be sent.

Contact RATP, Paris, email Swann.moulin@ratp.fr.  For further tender information please click here. Ref. n. DHA_2019MOP15142. 07/20.



Permalink

Negotiated invitation to tender, deadline  17/03/2020, for study, supply, installation of firefighting system in the southern/Northern tunnels and in the 5 station on the South section for Orly –Saint Denis Pleyel extension of Line 14, Paris (Lot SSI02). Duration of the contract is 60 months. For tender documents please click here , where offers must be sent. Contact RATP,  Paris, email  sophia.jaffar-bandjee@ratp.fr. For further information please click here and here Rif.n. 2019GDI14896. 09/20.



Permalink

Additional information on the prior information notice without call for competition for the passenger transport service of the first operating section lines 16 and 17 of the Grand Paris Express. Envisaged start date of the contract: 01/01/2022 with a duration of 84 months. Click here for the report of the information conference on the tenders for the management of Lines 15, 16, 17 and 18 of the Grand Paris Express held last 13/06/2019. Contact STIF (Syndicat des transports d’Ile-de-France), Paris, attn Mrs Juliette Vinck for Mr Laurent Probst, tel +33 147532800, email juliette.vinck@iledefrance-mobilites.fr. For tender information please click here and here. Ref. n. GPE-2020-01. 09/20.



Permalink

Postponed to 06/05/2020 the deadline for the competitive dialogue for the design and construction of the South Section on line 15 West of the Grand Paris Express (M1_Cr_15o) between Pont de Sevres and La Defense.

The contract includes:

• a fixed part relating to the design and construction of the SaintCloud, Rueil-Suresnes Mont-Valerien, Nanterre La Boule and Nanterre-La-Folie stations, with approximately 10 km of tunnels, 11 service facilities and a connecting structure; • an optional part relating to the design and construction of the La Defense station, the tunnels on one side and the other of this station for a total of 4 km and a service building.

The duration of the contract is 120 months. Postponed from 04/05/2020 to 17/07/2020 the estimated date of dispatch of invitations to tender or to participate to selected candidates. For further information please click here where offers must be sent. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  Further tender information can be found here, here and here 

Ref. n. 2020DC001_cand. 16/20.



Permalink

Negotiated invitation to tender, deadline  14/05/2020, for the technical control of structures and systems of lines 15 West and 15 East for the Grand Paris Express in France. The contract is composed of 2 lots. The duration of the contract is 168 months. For tender documents please click here, where offers must be sent. Contact Societe du Grand Paris, Paris, tel +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr.

For further tender information please click here. Ref.n. 2019PN065_Candidatures.

18/20.



Permalink

Société du Grand Paris has awarded the construction contract for works package 1 of Line 18 of Grand Paris Express to the Joint Venture comprising VINCI Construction Grands Projets (leader), VINCI Construction France, Dodin Campenon Bernard and Botte Fondations (all subsidiaries of VINCI Construction and representing 75% of the JV) together with Spie batignolles génie civil and Spie batignolles fondations, both subsidiaries of Spie batignolles and representing 25% of the JV.

This first section will link Orly airport to Massy-Palaiseau; Line 18 will then be extended to Versailles. Worth EUR799 million, of which 20% reserved for SMEs. The contract calls for digging 11.8 km of tunnels using two TBMs and building 3 stations (Antonyole, Massy Opera and Massy-Palaiseau), 13 ancillary engineering structures, 10 branches connecting with the tunnel  and 850 m of cut and cover. In total, more than 1 million m3 of material will be excavated.For further information please visit https://www.societedugrandparis.frhttps://www.vinci.com and https://www.spiebatignolles.fr/. 20/20.



Permalink

The JV ETF from Rueil-Malmaison/Cegelec mobility from Miribel secured the EUR120 million contract, excluding VAT, for track and overhead contact line equipment and works for Line 15 South – West sector of the Grand Paris Express. The contract includes the equipment for 16.5 km of tunnels between Pont de Sevres and Les Ardoines. Duration of the works will be 64 months. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  For tender information please click here and here. 22/20



Permalink

The award of the negotiated invitation to tender for the fitting-out, once the main civil works have been completed, of Villejuif Louis Aragon station on Line 15 South of the Grand Paris Express, has been interrupted.

The contract, composed of 3 lots, has not been awarded. Contact Societe du Grand Paris,  Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  For tender information please click here Ref. n. 2019PN016-Candidature. 22/20.



Permalink

The joint venture of Vinci construction grand projets SAS from Rueil-Malmaison,  SPIE Batignolles génie civil from Nanterre,  Dodin Campenon Bernard  from Cergy-Pontoise, Botte foundations from Chevilly-Larue secured the contract for construction of tunnels, opened and covered trenches, railway stations, ancillary works on Line 18 of the Grand Paris Express, Lot 1.  The Lot 1 includes 11.4 km tunnel to be driven by TBM with 7.8 m diameter, 3 underground stations (Antonypole, Massy Opera, Massy-Palaiseau). Contact Societe du Grand Paris, att.n Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. For tender information please click here  Ref. n. 2017PN007-candidatures. 24/20.



Permalink

Negotiated invitation to tender, deadline 22/07/2020, for the design, construction, supply, installation, commissioning and test for the traction system and associated equipment for line 18 of the Grand Paris Express. The duration of the contract is 101 months. Further information please visit here where offers must be sent and full TED information can be found here . Contact Societe du Grand Paris, La Plaine-Saint-Denis, tel +33 182462000, email Marches-sgp@societedugrandparis.fr.  Ref. n. 2020PN014. 26/20.



Permalink



The contracts for the supply and installation of  dry firefighting columns in stations and tunnels on the southern extension of Line 14  in Paris have been awarded.

Yvroud from Aiton secured the EUR 2.87 million contract,  excluding VAT, for the section between Olympiades station and Morangis depot (Lot CS01.1); Samex from Clamart secured the EUR454,007 contract, excluding VAT,  for the section between Cachin and 3302 structures (Lot CS01.2). Contact RATP, Paris, email swann.moulin@ratp.fr. For tender information please click here Ref.n. DHA_2019MOP14976. 30/20.



Permalink


Negotiated invitation to tender, deadline 06/08/2020, for the  checking of foundations of the buildings and infrastructures (avenues, viaducts, tunnels etc), along the alignment of the future Line 15 West and 15 East of the Grand Paris Express. Contract duration 24 months. Further information please visit here where offers must be sent and full TED information can be found here and here. Contact Societe du Grand Paris, La Plaine-Saint-Denis, tel +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr.  Ref. n. 2019PN063. 30/20.





Permalink

Competitive dialogue, deadline 30/09/2020, for the design and construction of 6 stations, a depot/maintenance centre (SMR/SMI), 17 km of tunnel,  17 service facilities and 15 connecting structures for the South Section on line 15 East of the Grand Paris Express (M1_Cr_15e) between Champigny-sur-Marne  and Bobigny.The duration of the contract is 114 months. For further information please click here https://www.marches-publics.gouv.fr/?page=entreprise.EntrepriseAdvancedSearch&AllCons&refConsultation=609001&orgAcronyme=s2d where offers must be sent. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr.  For tender information please click here http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=355551-2020. Ref. n. 2020DC002_cand. 31/20.



Permalink


The JV GIE Eiffage energie systemes ferroviaires from Velizy-Villacoublay, Engie Axima  SA from Paris  La Defense and INEO UTS (Urban Transportation Solutions) from  Montreuil secured the contract for systems and works for ventilation, decompression and fume disposal in the tunnels for Lines 16 and 17 of the Grand Paris Express.  Contact Societe du Grand Paris, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr.  For tender information please click here  Ref. n. 2018PN021. 31/20.



Permalink


Additional information on the Competitive dialogue, deadline 30/09/2020, for the design and construction of 6 stations, a depot/maintenance centre (SMR/SMI), 17 km of tunnel,  17 service facilities and 15 connecting structures for the South Section on line 15 East of the Grand Paris Express (M1_Cr_15e) between Champigny-sur-Marne  and Bobigny. The duration of the contract is 114 months. For further information please click here 

where offers must be sent. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr.  For tender information please click here. Ref. n. 2020DC002_cand. 32/20.






Permalink


Negotiated invitation to tender, deadline 08/09/20, for counting of workers inside tunnel during the South ligne 14 extension from Olympiades to Orly (Lot TP10) for Grand Paris Express project in Paris. Duration contract of the contract 40 months. Click here for tender documents and for offers to be sent. Contact RATP,  Paris, email Swann.MOULIN@ratp.fr For tender information please click here. Ref. n. DHA_2020MOP15727. 32/20.





Permalink


The Joint Venture Planitec BTP from Paris and EGIS rail from Lyon secured the EUR6.29 million contract, excluding VAT,  for scheduling, management and coordination mission (OPC) for the southern extension of Line 14, Paris (Lot PI20). Contact RATP, Paris, email Swann.moulin@ratp.fr.  For further tender information please click here. Ref. n. DHA_2019MOP15142. 39/20.

 




Permalink


Postponed from 30/09/2020 to 14/10/2020 the deadline of the competitive dialogue for the design and construction of 6 stations, a depot/maintenance centre (SMR/SMI), 17 km of tunnel,  17 service facilities and 15 connecting structures for the South Section on line 15 East of the Grand Paris Express (M1_Cr_15e) between Champigny-sur-Marne  and Bobigny. The duration of the contract is 114 months. For further information please click here and here. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel +33 182462000, fax +33 182462031, email marches-sgp@societedugrandparis.fr. Ref. n. 2020DC002_cand. 39/20. 

 




Permalink


The JV SPIE Batignolles Energie (Eaubonne), La Detection française DEF (Massy) and Metiss (Paris)  secured the contract for study, supply, installation of firefighting system in the Southern/Northern tunnels and in the 5 stations on the South section of the Orly –Saint Denis Pleyel extension of Line 14, Paris (Lot SSI02). Contact RATP,  attn Jaffar Bandjee Sophia, Paris, email  sophia.jaffar-bandjee@ratp.fr. For further information please click here. Ref.n. 2019GDI14896. 46/20. 

 




Permalink


The JV Axima Concept (Paris), GIE Eiffage Energie Systemes Ferroviaires (Velizy-Villacoublay) and Ineo UTS (Montreuil) secured the contract for the supply and installation of the main equipment for the disposal of fumes in tunnels on the section between Olympiades station and Orly Airport, a southern extension of Line 14, Paris (Lot DES01). Duration of the contract is 56 months. Contact RATP,  attn Frederic Grando, Paris, tel +33 158770687,email  frederic.grando@ratp.fr. For further information please click here. Ref.n. DHA_2019GDI14972. 51/20. 

 




Permalink


Nomosense from  Gardanne secured the EUR378,150 contract, excluding VAT, for counting of workers inside tunnel during the South ligne 14 extension from Olympiades to Orly (Lot TP10) for Grand Paris Express project in Paris. Contact RATP,  Paris, email Swann.MOULIN@ratp.fr.  For tender information please click here. Ref. n. DHA_2020MOP15727. 53/20. 

 




Permalink


The Consortium led by ATOS (Bull), combined with  Axione and  Siemens secured the EUR153 million contract for the development and deployment of Multi-Service Network (RMS) of  lines 15, 16 and 17 for Grand Paris Express project. The Multi-Services Network is a secure communication network serving all stations, tunnels and service works. It allows very high-speed communication between the centralized control center which supervises automatic subways, trainsets and all equipment (13,000 cameras, 11,000 controlled access points, 975 call points) with a high level of reliability and availability. Contact Societe du Grand Paris, attn Jérémy Huppenoire, Saint-Denis, tel +33 06 34 47 16 18,  email jeremy.huppenoire@societedugrandparis.fr. Visit https://media-mediatheque.societedugrandparis.fr/pm_1_138_138508-n8lkdinb4h.pdf. 06/21.  



Permalink


The Joint Venture Razel-Bec (mandataire), Sefi-Intrafor and Fayat Metal secured the EUR 325 million contract, excluding VAT, for the construction of the section between the stations Clichy-Montfermeil  and Noisy-Champs of Grand Paris Express’s line 16( lot 3). The contract includes the construction of a 5.5km tunnel between Bel-Air building at Chelles and the back of  Noisy-Champs, of the new Chelles station and 6 service structures. Works will begin on September 2021 and will end 7 years later. For further information please click here. Visit https://www.societedugrandparis.fr/. 08/21.  

 




Permalink


Competitive dialogue, deadline 08/04/2021, for the design and construction of the North section of the Line 15 West from 2803 structure near Defense station at Courbevoie to the 32e01 interface structure with Line 15 East at Saint-Ouen. The section includes a 7.5 km tunnel, 4 stations and 7 ancillary structures  and an optional tranche. For tender documents click here, where tenders have to be sent. Duration of the contract is 108 months. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel  +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr. For further on the TED tender, please click here. Ref.n. 2021DC001_cand. 09/21. 

 




Permalink


Altempo from Bennwihrl (FR) secured theEUR4.80 million contract, excluding VAT, for the support services on systems management  in the Cachin building (3000 mq)and the L14 tunnel (1.7 km)  sites, during the North and South extensions of Line 14, Grand Paris Express (Lot TP06). The contract includes study and installation of working ventilation in tunnel and safety-firefighting services in surface and tunnel sites. Duration of the contract is 51 months. Contact RATP, Paris, email Swann.MOULIN@ratp.fr. For further information please click here. Ref.n. DHA_2019MOP15217. 10/21.  

 




Permalink


Postponed from 04/06/2021 to 18/06/2021 the estimated date of dispatch of invitations to tender or to participate to selected candidates for the competitive dialogue for the design and construction of the North section of the Line 15 West from 2803 structure near Defense station at Courbevoie to the 32e01 interface structure with Line 15 East at Saint-Ouen. The section includes a 7.5 km tunnel, 4 stations and 7 ancillary structures and an optional part.  The estimated date of dispatch of invitations to has been postponed  from 04/06/2021 to 18/06/2021 for selected candidates. For tender documents click here, where tenders have to be sent. Duration of the contract is 108 months. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel  +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr. For further on the TED tender, please click here. Ref.n. 2021DC001_cand. 15/21.

 




Permalink


Competitive dialogue, deadline 01/06/2021, for the design and construction of the North section of the Line 15 East from the 32e01 interface structure (included) with Line 15 West - at Saint-Ouen to the 6701 service structure (not included)  at Bobigny. The section includes a 6 km tunnel, 3 stations and 4 ancillary structures , as well as the construction of installations, systems and works on existing structures.  Estimated date of dispatch of invitations to tender or to participate to selected candidates: 17/09/2021. For tender documents click here, where tenders have to be sent. Duration of the contract is 106 months. Contact Societe du Grand Paris, attn Selma Mouloud, Saint-Denis, tel  +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr. For further on the TED tender, please click here, here and here. Ref.n. 2021DC002_cand. 21/21.

 




Permalink


Open invitation to tender, deadline 07/07/2021, for evaluation of the functionalities and safety level of fire safety supervision systems on line 18 of the Grand Paris Express. The duration of the contract is 120 months. For further information please click here. Offers must be sent here. Full TED information can be found here . Contact Societe du Grand Paris, La Plaine-Saint-Denis, tel +33 182462000, fax +33 182462031, email Marches-sgp@societedugrandparis.fr.  Ref. n. 2020MAPA001. 20/21.