The first two of a scheduled 18 breakthroughs of Terratec TBMs have been accomplished on the CC-07 and CC-24 projects at New Delhi Metro Phase-III. Read the press release and visit www.terratec.co. 33/14.
Inside the TBM cutter head
15.09.2025 Italy
15.09.2025 Sweden
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina