The first two of a scheduled 18 breakthroughs of Terratec TBMs have been accomplished on the CC-07 and CC-24 projects at New Delhi Metro Phase-III. Read the press release and visit www.terratec.co. 33/14.
Inside the TBM cutter head
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
16.01.2026 Germany
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway