Main contractor HCC is putting its 6.2 m-diameter SELI universal double-shield TBM to good use at Kishanganga hydro in the Himalaya region of Jammu & Kashmir, India. November saw 816 m advance as the machine passed the 7 km mark on this epic 14.63 km drive, some 2.5 km ASL. Read the report to date also read previous report, and visit www.hccindia.com and www.selitunnel.com. 49/12.
19.03.2026 Bulgaria
20.03.2026 Italy
20.03.2026 Germany
23.03.2026 France
24.03.2026 Romania
24.03.2026 Italy
30.03.2026 Italy
31.03.2026 Ireland
07.04.2026 Austria
09.04.2026 France
09.04.2026 Germany
23.04.2026 Sweden
24.04.2026 United Kingdom
30.04.2026 Switzerland
30.04.2026 Sweden
04.05.2026 Switzerland
04.06.2026 Switzerland