Main contractor HCC is putting its 6.2 m-diameter SELI universal double-shield TBM to good use at Kishanganga hydro in the Himalaya region of Jammu & Kashmir, India. November saw 816 m advance as the machine passed the 7 km mark on this epic 14.63 km drive, some 2.5 km ASL. Read the report to date also read previous report, and visit www.hccindia.com and www.selitunnel.com. 49/12.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria