Main contractor HCC is putting its 6.2 m-diameter SELI universal double-shield TBM to good use at Kishanganga hydro in the Himalaya region of Jammu & Kashmir, India. November saw 816 m advance as the machine passed the 7 km mark on this epic 14.63 km drive, some 2.5 km ASL. Read the report to date also read previous report, and visit www.hccindia.com and www.selitunnel.com. 49/12.
25.11.2024 Austria
27.11.2024 Poland
28.11.2024 Austria
03.12.2024 Austria
05.12.2024 France
05.12.2024 Germany
06.12.2024 United States
09.12.2024 France
09.12.2024 Austria
12.12.2024 Belgium
12.12.2024 Switzerland
13.12.2024 Norway
13.12.2024 Germany
15.12.2024 Austria
09.01.2025 Switzerland
15.01.2025 Germany
17.01.2025 Spain