Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

MAPEI's UTT Division - Santa Lucia tunnel

26/03/2022
MAPEI's UTT Division - Santa Lucia tunnel


MAPEI's UTT Division have provided technological solutions and technical assistance for all the main applications related to excavation of the S. Lucia tunnel. The tunnel is on the new three lane Barberino di Mugello - Florence North section of the A1 motorway in Barberino di Mugello, Italy.

MAPEI have highlighted two aspects of the building of this tunnel. Firstly the dimensions: the tunnel was excavated with a TBM EPB with a diameter of 15.90 m, which is the largest machine ever used in Italy, and one of the largest ever in the world.

Secondly MAPEI want to highlight the issue of the environmental impact of the tunnel. This tunnel project was among the first in both Italy and the world, in which particular attention was paid to minimizing the environmental impact of the products used for soil conditioning during the excavation.

MAPEI UTT’s technical assistance was crucial in the following steps:-

Tunnel segments casting

MAPEI provided products for the mix design of precast concrete used to make the tunnel-segments - dimensions (55 cm thick and 2.2 m long) were particularly high precisely because of the excavation diameter of the tunnel itself. Dynamon NRG1015SC and Dynamon NRG1037, super fluidifying additives were specifically formulated for this application, and Mapeform W60, universal formwork release agent, were also used.


Ground Conditioning

During the excavation of about 8 km of tunnel, Polyfoamer ECO/100, a foaming agent based on surfactants in combination with a natural polymer, was used to condition the soil at the shield. Polyfoamer ECO/100 differs from traditional foaming agents in that it has a very low environmental impact on water and excavated soil.

This product was selected for the S. Lucia tunnel because it was the best in terms of technical and environmental performance, among all those that were tested in the preliminary phases. Testing was carried out by both the Turin Polytechnic laboratory (which carried out the technical conditioning tests) and by the Rome laboratory of the CNR (which carried out the environmental biodegradability and eco-toxicity tests).

The use of Polyfoamer ECO/100 throughout the tunnel allowed the company both to advance the excavation quickly and safely, and to minimize the environmental impact on the soil and consequently reduce the time required to store it on site before transporting it to its destination. About 1.5 million cubic meters of soil were excavated and conditioned with Polyfoamer ECO/100.

Backfill injection mix

The annular void between the segments and the soil was filled with a two-component cementitious mix, specially developed in the MAPEI laboratory using Mapequick CBS System 1L, a retarder additive with fluidifying effect, and Mapequick CBS System 3, an accelerator.

Restoration of the concrete in the segments

The defects in the concrete of the segments were repaired using MAPEI cementitious mortars and levelling compounds from the Mapefer, Mapegrout and Planitop ranges. In addition, Resfoam 1KM Flex single-component polyurethane resin was used for secondary injection on the back of the segments in the event of water infiltration.

For further information please visit https://utt.mapei.com/. 12/22.




NEED QUALIFIED PERSONNEL?