Tunnelbuilder
Home
Diary
Tenders
Awards
Archive
News Feed
Buyers Guide
Product Promotion
Jobs Gallery
Sales
Newsletter
Tracker
Contact
English
Spanish
Italian
German
Chinese
French
Dutch
Japanese
Swedish
Norwegian
Russian
Daylight at Seiro tunnel
19/11/2012
The top heading of the EUR88.7 million monotube, twin-track Seiro tunnel between Banos de Molgas and Vilar de Barrio municipalities on the 6.5 km-long Porto-Miaman section of AV Madrid-Galicia high-speed line was completed on 06.11.2012. Excavation of the bench section is proceeding. Seiro tunnel has a length of 1,842 m, of which 44 m is in cut/cover at the adits, and has an inner section 85 sq m. A 350 m-long safety tunnel will provide access for emergency vehicles. The geology consists of granite with different average degrees of alteration. Excavation is by drill/blast in hard rock and excavator in morbide morphologies. Visit
www.adif.es
. 47/12.
Tweet
Active Tenders
16.12.2025
Iceland
16.12.2025
Iceland
17.12.2025
Italy
06.01.2026
France
12.01.2026
Austria
23.01.2026
Switzerland
23.01.2026
Switzerland
Previous
Next
X