Spain

Spain, International - es/51

High Speed Railway

Work groups to carry out technical, economic and financial studies for Porto-Vigo and Madrid-Lisbon-Porto high speed railway lines. Visit www.gif.es and www.rave.pt 18/01. Invitations to tender expected for 18.5 km of tunnels on 43 km-long section from Guadalcazar to Fuente Palmero including 7 km-long Abdalajis tunnel. Visit www.gif.es 21/01.Open tendering for technical, economical and environmental feasibility of the Madrid-Lisbon-Porto and the Vigo-Porto high speed connections. Deadline 18th February, 2002. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 248, documents 171254- and 171255-2001 or contact AVEP, Alta Velocidad Espaí±a-Portugal, c/ Miguel Angel, 21 28010 Madrid, tel. +34 917004700. 03/02.



Permalink

Spain, Madrid-Segovia - es/50

High Speed Railway

Open invitation to tender, deadline 7th May, 2001, for construction of 6.7 km-long railway section between Santa Marí­a la Real de Nieva and Ortigosa del Pestaí±o including 3.5 km-long Tabladillo tunnel. Visit www.gif.es 16/01. Award of a 6.7 km section with 4.3 km-long 14 m-diameter (100 sq m) Tabladillo tunnel to a jv of Ploder and Obras Subterrí¡neas. Preparatory works underway. Drill/blast method for 2,725 metres plus cut-and-cover method for 790 metres on the south side and 835 metres on the north side. Contract value of €49 million. Time frame of 21 months. Visit www.gif.es 17/02.



Permalink

Spain, San Sebastian - es/49

Railway

Invitation to negotiate contract, deadline 7th May, 2001, for construction of 1.75 km-long railway tunnel for Ferrocarriles Vascos, fax +34 94 401 9901. Visit www.boe.es 17/01. Open tendering, deadline 20th December, 2001, for the south variant between Aí±orga and Amara stations on the Bilbao-San Sebastian railway. Includes a 900 m tunnel and a 100 m underground station. Visit http://ted.eur-op.int, document S 214-147100 or contact the Basque Railways, Bilbao, fax +34 94 4330602. Budget is €18.5 million. Also visit www.euskotren.es 47/01.Dualling of the EuskoTren line between the Easo and Aí±orga stations awarded to a jv of Construcciones Altuna y Urí­a, and Construcciones Mariezkurrena for €18 million. Time frame for construction of 23 months. The 3,366 m section includes two tunnels in Aiete and Amara totalling 1,606 m as well as a 101 m-long subterranean station in Gerií¡trico. Visit www.euskotren.es 09/02.Open call for tenders, deadline 5th September, 2005 for design of section Anorga-Rekalde on the Bilbao-San Sebastian line. This 2.5 km section includes a 1.3 to 1.4 km single-tube dual-track tunnel, finished section 60 sq m, to be built in marly limestone in urban area, using a roadheader. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=135276-2005, OJ S 136, or contact Red Ferroviaria Vasca, Bilbao, fax +34 944329189. E-mail jortega@ets-rfv.es 33-34/05.Open call for tenders, deadline 20th February, 2006 for design of the dualling of the Loiola-Herrera section on the Lasarte-Hendaya rail line operated by Euskotren, in San Sebastian province. The new route of the Loiola-Herrera section will enable the existing 2.5 km single-track tunnel to carry freight traffic only, thereby separating freight and passenger traffic. The planned section is 2,701 m long, whereof 1,628 m in tunnel, a 480 m semi-underground station in Herrera, a 452 m stretch of open air and a 141 m concrete box. Work will commence at the end of 2006 or in early 2007 to end in early 2010. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=249375-2005, OJ S 252, or contact Red Ferroviaria Vasca, Bilbao, fax +34 944329189. E-mail jortega@ets-rfv.es 03/06.Typsa bagged a EUR781,500 contract to design the dualling of the Loiola-Herrera section on the Lasarte-Hendaya rail line operated by the Basque railway operator Eusko Tren. The 2,701 m-long section, whereof 1,628 m in tunnel, includes a 480 m semi-underground station in Herrera, a 452 m stretch of open air and a 141 m concrete box. Visit www.typsa.es 26/06.Periodic notice, deadline unspecified, being a call for bids aiming at reducing time limits for the receipt of tenders, for 2.7 kilometres of double tracking between Loiola and Herrera stations, including a 1.6 km tunnel, redevelopment of Herrera station, a new station in Intxaurrondo and refurbishment of the existing tunnel to be used by freight trains only. Read E-News Weekly 37/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=36593-2008, OJ S 27, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 07/08.Open invitation to tender, deadline 3rd July, 2008 for construction of a 2.7 km double tracking between Loiola and Herrera stations, including a 1,628 m tunnel, a 141 m in situ concrete box, the Herrera partially underground station and the Intxaurrondo underground station. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=127126-2008, OJ S 93, and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151991-2008, OJ S 114, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 21/08.Open invitation to tender, deadline 4th August, 2008 for construction management for the 2.7 km Loiola-Herrera track dualling, including a 1,628 m tunnel, a 141 m in situ concrete box, the Herrera partially underground station and the Intxaurrondo underground station. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=151901-2008, OJ S 113, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 25/08.Ví­as y Construcciones will partner with Altuna y Uria to construct a 2.7 km double tracking between Loiola and Herrera stations, including a 1,628 m tunnel, a 141 m in situ concrete box, the Herrera partially underground station and the Intxaurrondo underground station. Their contract is worth EUR51.8 million. Visit www.vias.es 42/08.



Permalink


Open invitation to tender, deadline 01/03/2024, for the Amara freight bypass in Donostia-San Sebastián. The project involves the construction of a new railway branch line to connect the Lugaritz and Anoeta freight stations once the Lugaritz-Easo bypass is in service, seeking to make the best use of the Aiete tunnel, which will remain unused except for freight. The 450 m projected new line will be developed entirely in tunnel and cut-and-cover tunnel and it will connect the Aiete tunnel with the Morlans tunnel, thus allowing goods trains to run in the Pasaia direction. Click here for bid/tender documents and here where tenders must be sent. Contact Euskal Trenbide Sarea - ETS - Euskal Trenbide Sarea, Bilbao, tel +34 946572600. E-mail kontratazioa@ets-rfv.eus.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=038062-2024. 04/24. 

 




Permalink

Spain, Barcelona - es/48

Metro

    Preannouncement of invitation to tender for design and construction of metro line 9 from Sagrera to Can Peixauet, Can Zam and Gorg. Contact GISA, fax +34 9 34 300124. Monitor http://ted.eur-op.eu.int 14/01. Three open invitations to tender, deadline 17th July, 2001, for 10 km-long x 11.9 m-diameter section of line 9 with thirteen 35-65 m-deep stations. Y-shaped line will run from Gorg and Can Zam to Bon Pastor and on to Sagrera Meridiana in mixed ground requiring hardrock TBM and EPB. Commencement early-2002 for completion end-2004. Further 30 km with 30 stations in design to be tendered as three sections. Contact fax +34 934 300124 or visit www.gisa.es 27/01. Two contracts awarded by the Catalan government for Line 9 to connect Gorg in Badalona and Can Zam in Santa Coloma, both forming the upper branches of a Y, with Parc Logí­stic. First section is open cut. Pta48.6 billion second section including subsections from Bon Pastor to Gorg and from Parc Logí­stic up to Zona Universitaria secured by Dragados, Necso, Comsa, ACS, and Sorigué. EPB shield to be used with launch shafts in Zona Universitaria and Gorg. Time frame of 54 months. Pta64.4 billion third section including subsections from Can Zam to Bon Pastor and from Zona Universitaria to Sagrera scooped by FCC, OHL, Ferrovial-Agromí¡n and Copisa. EPB TBM. Time frame of 64 months. All tunnels 10.9 m-diameter with two levels for both directions. Excavation to start in 2002 at a depth of 35-60 m. Three machines needed altogether. Section between Can Zam, Gorg and Sagrera to open in 2004. Sagrera-Parc Logí­stic stretch to open in 2006. Visit www.gencat.es and www.gisa.es 44/01. A jv of Riazu, Tec-Cuatro, and GPO Ingenierí­a has secured the work supervision for a 3 km section of Line 9 for €1.8 million. Visit www.gencat.es and www.gisa.es 51/01. Work supervision for the bulk of Line 9, including the bored tunnels, awarded to Paymacotas and Nicola Della Valle for €16.4 million. Visit www.paymacotas.com and www.nicdv.it 03/02. Open call for bids, deadline 25th February, 2003 for construction of the infrastructure and stations for Line 9, section 1 Airport-Parc Logí­stic, subsection Llobregat-Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Includes the construction of stations Mercabarna, Parc Logí­stic and Fira de Barcelona, and one tunnel between river Llobregat and the Fira station. Tender value: €149.2 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001119-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03. The 44 km-long line 9 will be the longest in Europe connecting Badalona and Santa Coloma de Gramanet with the port and the airport, running through the exhibition and fair area. It is also the first metro line in the world for trainsets in each direction in a single two-level tunnel. The project requires to invest approximately €2 billion. Construction will not be finished before mid-2007. 02/03. Open call for bids, deadline 25th February, 2003 for structural work inside the section 2 tunnel, track laying and catenary installation. Tender value: €71.9 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001115-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of the tunnel on section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³, section Bifurcacií³-Fira. Tender value: €93.7 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001107-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of the stations on section 2 Parc Logí­stic-Zona Universitaria, subsection Zona Universitaria-Bifurcacií³, and subsection Bifurcacií³-Start shaft in Motors street. Tender values: €63.4 million and €57.8 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001117-2003 and http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001118-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of infrastructure, stations, workshops and depots on section 2 Parc Logí­stic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Tender value: €154.9 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001108-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for structural works inside section 3 tunnel, track laying and catenary installation. Tender value: €59.1 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001109-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Zona Universitaria, Campus nord, Manuel Girona and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €41.7 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001111-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Prat de la Riba, Sarrií , Mandri and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €49.7 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001112-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Putxet, Lesseps, Muntanya and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €39.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001116-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for construction of stations Sanllehy, Guinardí³, Maragall and ventilation shafts, section 3 Zona Universitaria-Sagrera Meridiana. Tender value: €42.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001120-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for installation of escalators and lifts in the 40 stations. Tender value: €52.9 million and €58.8 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001110-2003 and http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001121-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.Open call for bids, deadline 25th February, 2003 for installation of ticketing equipment. Tender value: €28.3 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=es&docid=001113-2003, OJ S 2, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es. 02/03.The total budget of these tenders amounts to €963 million. The administration will pay for the works, interests included, as the construction companies complete and commission the sections.To date, section 4 has been fully awarded (Can Zam and Gorg branches to Sagrera-Meridiana) and work is underway as well as the tunnels on almost all section 2 and all section 3. It is foreseen that section 4 will be operational in 2004. Open call for bids, deadline 25th February, 2003, for construction of the infrastructure and stations of line 9, section 1 Airport-Parc Logí­stic, subsection km 4+500 to Llobregat. Budget: €197.6 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=002625-2003, OJ S 4, or contact GISA, Barcelona, fax +34 934300124. 03/03.Open call for bids, deadline 25th March, 2003, for design and construction of the telecom systems for line 9. Traction substations, power substations and energy distribution system. Budget: €161.2 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=002632-2003, OJ S 4, or contact GISA, Barcelona, fax +34 934300124. 03/03. Open invitation to tender, deadline 11th April, 2003 for work supervision of Line 9, section 2 Parc Logí­stic-Zona Universití ria, subsection Bifurcacií³, stretch Bifurcacií³-Fira, and subsection Start shaft in Motors street-Zona Franca Zal. Tender value: €6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031751-2003, OJ S 37, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ATC, signalling and Centralized Control Room as well as the platform edge doors (PEDs) system. Tender value: €3.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035370-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9, section 1 Airport-Parc Logí­stic, subsections Airport Terminal to km 4+500, km 4+500 to Llobregat and Llobregat to Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Tender value: €10.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035364-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision for the stations of Line 9, section 2 Parc Logí­stic-Zona Universitaria, subsections Zona Universitaria-Bifurcacií³ and Bifurcacií³-Start shaft in Motors street. Tender value: €4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035381-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for telecom systems, traction substations, power substations and energy distribution system. Tender value: €3.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035374-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ticketing system, and installation of elevators and escalators. Tender value: €2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035371-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03. Open invitation to tender, deadline 11th April, 2003 for work supervision of Line 9, section 2 Parc Logí­stic-Zona Universití ria, subsection Bifurcacií³, stretch Bifurcacií³-Fira, and subsection Start shaft in Motors street-Zona Franca Zal. Tender value: €6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031751-2003, OJ S 37, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ATC, signalling and Centralized Control Room as well as the platform edge doors (PEDs) system. Tender value: €3.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035370-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9, section 1 Airport-Parc Logí­stic, subsections Airport Terminal to km 4+500, km 4+500 to Llobregat and Llobregat to Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Tender value: €10.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035364-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision for the stations of Line 9, section 2 Parc Logí­stic-Zona Universitaria, subsections Zona Universitaria-Bifurcacií³ and Bifurcacií³-Start shaft in Motors street. Tender value: €4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035381-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for telecom systems, traction substations, power substations and energy distribution system. Tender value: €3.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035374-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03.Open invitation to tender, deadline 15th April, 2003 for work supervision of Line 9 for the ticketing system, and installation of elevators and escalators. Tender value: €2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035371-2003, OJ S 41, or contact GISA, Barcelona, fax +34 934300124. E-mail dlh@gisa.es 10/03. The construction of the tunnel on section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³, section Bifurcacií³-Fira on Line 9 has been commissioned to FCC, Copisa and Comapa for €74.2 million. Visit www.gisa.es, www.fcc.es and www.copisa.com 22/03.Dragados, Copcisa, Construcciones Rubau and Comapa have been appointed to build the infrastructure, stations, workshops and depots on section 2 Parc Logí­stic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Contract value: €128.9 million. Visit www.gisa.es, www.dragados.es and www.copcisa.com 22/03.Dragados, Necso, Comsa, ACS and Sorigué have scooped a €59 million contract for structural works inside the section 2 tunnel, track laying and catenary installation, section Start shaft in Motor street-Zona Universitaria. Visit www.gisa.es, www.dragados.es and www.necso.es 22/03.Copisa, FCC, Copcisa, OHL and Ferrovial-Agromí¡n have been awarded a €51 million contract for structural works inside section 3 tunnel, track laying and catenary installation on section Zona Universitaria-Sagrera Meridiana. Visit www.gisa.es, www.copisa.com and www.fcc.es 22/03.A JV of Dragados, Necso, Comsa and Sorigué has won for €124 million the construction of the infrastructure and stations, section 1 Airport-Parc Logí­stic, subsection Llobregat-Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. Includes the construction of stations Mercabarna, Parc Logí­stic and Fira de Barcelona, and one tunnel between river Llobregat and Fira station. Visit www.gisa.es, www.dragados.es and www.necso.es 22/03.The stations on section 2 Parc Logí­stic-Zona Universitaria, subsection Zona Universitaria-Bifurcacií³ will be built by Dragados, Necso and ACS at a cost of €54.7 million. Visit www.gisa.es, www.dragados.es and www.necso.es 22/03.The stations on section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³-Start shaft in Motors street will be built by Scrinser, Comsa and Sorigué for €49.8 million. Visit www.gisa.es and www.comsa.es 22/03.Corsí¡n-Corviam will construct stations Zona Universitaria, Campus nord, Manuel Girona and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €35.6 million. Visit www.gisa.es and www.corsan-corviam.es 22/03.Copcisa, FCC, Ferrovial-Agromí¡n, OHL and Copisa will build stations Prat de la Riba, Sarrií , Mandri and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €42.3 million. Visit www.gisa.es, www.copcisa.com and www.fcc.es 22/03.Copcisa, FCC, Ferrovial-Agromí¡n, OHL and Copisa will also build stations Putxet, Lesseps, Muntanya and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €33.6 million. Visit www.gisa.es, www.copcisa.com and www.fcc.es 22/03.Copcisa, FCC, Ferrovial-Agromí¡n, OHL and Copisa will finally build stations Sanllehy, Guinardí³, Maragall and the ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Contract value: €36 million. Visit www.gisa.es, www.copcisa.com and www.fcc.es 22/03.FCC, Ferrovial-Agromí¡n, OHL, Scrinser and Copisa will construct the infrastructure and stations on section 1 Airport-Parc Logí­stic, subsection km 4+500 to Llobregat. Contact value: €169 million. Visit www.gisa.es, www.fcc.es and www.ferrovial.es 22/03.Indra Sistemas and Sainco Trí¡fico have won a €22.9 million contract for the supply and installation of the ticketing equipment. Visit www.gisa.es, www.indra.es and www.saincotrafico.com 22/03.ThyssenKrupp Elevadores has won a €28.4 million contract for the supply and installation of escalators and another contract worth €32.3 million for the supply and installation of lifts in the 40 stations. Visit www.gisa.es and www.thyssenkrupp.com 22/03.A JV between Agelèctric, Elecnor, Emte, Instalaciones Inabensa and Isolux Wat has secured a €130.7 million design and equipment contract for line 9 including the telecom systems, the traction substations, the power substations and the energy distribution system. Visit www.elecnor.es, www.grupemte.com, www.inabensa.com and www.isolux.es. Work supervision goes to Auditorí­as e Ingenierí­as and Sener for €2.9 million. Visit www.sener.es 29/03.Typsa, Europrincipia and Idom have won a €3.26 million contract for work supervision for the stations on section 2 Parc Logí­stic-Zona Universitaria, subsections Zona Universitaria-Bifurcacií³ and Bifurcacií³-Start shaft in Motors street. Visit www.typsa.es and www.idom.es 29/03.GPO Ingenierí­a, Catalana d'Ingenyeria and Payma Cotas have won a €4.3 million contract for work supervision of stations Campus nord, Manuel Girona, Prat de la Riba, Sarrií , Mandri, Putxet, Lesseps, Muntanya and the associated ventilation shafts on section 3 Zona Universitaria-Sagrera Meridiana. Visit www.gpo.es and www.paymacotas.com 29/03.A JV between Payma Cotas, Riazu and Tec-Cuatro has pocketed a €8.5 million contract for work supervision of the infrastructure and stations on section 1 Airport-Parc Logí­stic, subsections Airport terminal to Km 4+500, Km 4+500 to Llobregat, Llobregat to Parc Logí­stic, and section 2 Parc Logí­stic-Zona Universitaria, subsection Parc Logí­stic-Fira. 29/03.A JV of AZM Ingenyers, SGS Tecnos, Ardanuy Ingenierí­a and Sener has gained a €1.8 million contract for work supervision of the ticketing system, elevators and escalators. Visit www.ardanuy.com and www.sgs.es 29/03.Sener has won a €2.6 million contract for work supervision for the ATC, signalling and Centralized Control Room as well as the platform edge doors (PEDs) system. 29/03.Open call for bids, deadline 9th February, 2004 for construction of section Airport-Parc Logí­stic, subsection Terminal station between runways-Km 4+500. Cut-and-cover method from Terminal station between runways to Km 1+250 and EPB TBM. The tunnel will accomodate two tracks and feature an outer diameter of 9.07 m and inner diameter of 8.43 m. Includes also three cut-and-cover stations. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=220683-2003, OJ S 248, or contact GISA, Barcelona, fax +34 934444488. Visit dlh@gisa.es 02/04.GISA has awarded the construction of subsection Terminal between runways-Km 4+500 of Line 9 between the airport and Parc Logistic which will connect the Mas Blau business park to the new airport terminal to a JV between FCC, Ferrovial-Agroman, Scrinser, OHL and Copisa. The contract is worth EUR139 million. Work will commence by two months and last 20 months. The section is 3,934 m in length, whereof 3,050 m in tunnel, with three stations temporarily known as Terminal entre pistas, Terminal actual and Mas Blau. The double-track tunnel features an outer diameter of 9.4 m and an inner diameter of 8.4 m. Visit www.fcc.es, www.ferrovial.com, www.ohl.es and www.copisa.com 14/04.Open call for bids, deadline 10th May, 2004 for construction of the Sagrera Meridiana interchange on Line 9. Tender value: EUR105.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=051109-2004, OJ S 60, or visit GISA, Barcelona, fax +34 934444488. E-mail dlh@gisa.es 16/04.It was initially planned to construct in open cut the subsection running from Sagrera-Meridiana to the exit shaft of the TBMs near the future high speed station in La Sagrera. Because of a planning clash between the construction of this subsection and the future high speed railway station, the project has been modified and will be TBM-driven. GISA has awarded the construction of this subsection, running from Onze de Setembre station to Sagrera-Meridiana to Dragados, Necso, Comsa, ACS and Sorigué for EUR89.8 million and a time frame to complete the job of 24 months. The contract also includes an extension to Line 4 from Santander to Sagrera TAV and Sagrera-Meridiana, with a 12 m-diameter tunnel and the new Line 4 station at Sagrera-Meridiana. The Sagrera TAV - Sagrera-Meridiana stretch of Line 4 will be used by Line 9 trains while the Onze de Setembre - Sagrera-Meridiana parallel section is used for spoil removal when work continues on Line 9 between Sagrera-Meridiana and Zona Universití ria. The new Line 4 section will be commissioned as Line 9 without being connected to La Pau, the current head of the line. Construction of both sections implies therefore that Lines 9 and 4 will run in parallel in separated tunnels between Sagrera TAV and Sagrera Meridiana. Sagrera-Meridiana will also be an interchange station between four metro lines (4, 9, 1 and 5) and the Renfe station. These companies are currently excavating the Gorg-Bon Pastor section by means of a 12.06 m-diameter Herrenknecht EPB shield. This machine has excavated over 1 km and recently passed Llefia station. The other EPB shield, 11.95 m in diameter, built by NFM Technologies launched from Can Zam on 20th June, 2003 is on schedule, having driven 1.7 km. The machine is between Singuerlin and Esglesia stations. Visit www.gisa.es, www.gencat.net, www.herrenknecht.com and www.nfm-technologies.com 16/04.Open call for bids, deadline 19th July, 2004 for work management of the Sagrera Meridiana interchange on Line 9 of the Barcelona metro. Tender budget: EUR3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=086071-2004, OJ S 105, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 25/04.Comsa, Scrinser and Isolux Wat will construct Sagrera Meridiana interchange on Line 9, for EUR75.1 million. Visit www.comsa.com 30/04.Idom, Europrincipia and Typsa have secured a EUR2.3 million contract for work management of the Sagrera Meridiana interchange on Line 9 of the Barcelona metro. Visit www.idom.es, www.europrincipia.es and www.typsa.com 45/04.Open call for tenders, deadline 2nd September, 2005 for quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Can Zam and the tunnel on the Zona Universitaria-Sagrera Meridiana section and during the design of the infrastructure and station of the access to the railway triangle, as part of Line 9 of the Barcelona metro. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=133995-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 29/05.Open call for bids, deadline 2nd September, 2005 for quality control during construction of the infrastructure, stations, workshops and depots on section 2 Parc Logistic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134039-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/05.Open call for bids, deadline 2nd September, 2005 for quality control during construction of section 2n Parc Logistic-Zona Universitaria, subsection Bifurcacion, section Bifurcacion-Fira. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134038-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/05.Open call for bids, deadline 2nd September, 2005 for quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Gorg, of the tunnel on section Parc Logistic-Zona Universitaria and of the infrastructure and stations on subsection Sagrera-TBM shaft (end of section at Sagrera high speed rail-Bon Pastor). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134026-2005, OJ S 135, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, stations on the subsection Zona Universitaria-Bifurcacion (Gornal, Torrassa, Collblanc, Campus Sud and Zona Universitaria). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=201911-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, subsection Llobregat-Fira. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=201909-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, subsection Parc Logistic-Zona Universitaria. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=202045-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Open call for tenders, deadline 12th December, 2005 for design of the modified project for Line 9, subsection TBM shaft-Sagrera Meridiana. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=201956-2005, OJ S 204, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 45/05.Payma Cotas won a EUR530,000 contract to undertake the quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Can Zam and the tunnel on the Zona Universitaria-Sagrera Meridiana section and during the design of the infrastructure and station of the access to the railway triangle, as part of Line 9 of the Barcelona metro. Visit www.paymacotas.comEptisa secured a EUR590,000 contract to undertake the quality control during construction of the infrastructure and stations on section 4t Bon Pastor-Gorg, of the tunnel on section Parc Logistic-Zona Universitaria and of the infrastructure and stations on subsection Sagrera-TBM shaft (end of section at Sagrera high speed rail-Bon Pastor). Visit www.eptisa.es 47/05.Eptisa also secured a EUR303,300 contract to undertake the quality control during construction of section 2n Parc Logistic-Zona Universitaria, subsection Bifurcacion, section Bifurcacion-Fira. Visit www.eptisa.es 47/05.LGAI Technological Center and Applus Construccií³n Técnica pocketed a EUR887,300 contract to undertake the quality control during construction of the infrastructure, stations, workshops and depots on section 2 Parc Logistic-Zona Universitaria, subsection Start shaft in Motors street-Zona Franca Zal. Visit www.lgai.es and www.appluscorp.com 47/05.Open call for bids, deadline 10th April, 2006 for design of the airport loop on section 1 Airport-Logistic Park, between Mas Blau station (not included in the contract) at Km 0.750 of the original project and the terminal station between the runways (Km 3.595 in the original project). The alignment change to the project originally designed in 2002 is motivated by the need to serve the new airport city under development northeast of the airport. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040175-2006, OJ S 37, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 09/06.Auding secured a EUR304,000 contact to design the modified project for Line 9, subsection TBM shaft-Sagrera Meridiana. Visit www.auding.com 12/06.Tec-Cuatro, Intraesa and Geocontrol received three contracts to design the modified project for Line 9. The first contract, worth EUR210,800, is to design subsection Parc Logistic-Zona Universitaria. The second contract is to design the stations on subsection Zona Universitaria-Bifurcacion (Gornal, Torrassa, Collblanc, Campus Sud and Zona Universitaria). It is worth EUR370,700. The third contract is to design subsection Llobregat-Fira. It is worth EUR210,340. Visit www.tec-cuatro.es, www.intraesa.com and www.geocontrol.es 12/06.Open call for tenders, deadline 2nd May, 2006 for conceptual design of section 3r Zona Universitaria-Sagrera meridiana on Line 9 of the Barcelona metro. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=054507-2006, OJ S 52, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 13/06.The call for tenders for the conceptual design of section 3r Zona Universitaria-Sagrera meridiana on Line 9 of the Barcelona metro has been cancelled. Click es/48. 19/06.Open call for tenders, deadline 29th May, 2006 for general supervision of safety and health during construction of Line 9 of the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=088116-2006, OJ S 83, or contact GISA, Barcelona, fax +34 93 4444488. E-mail contractacio@gisa.es 20/06.Peyco and Inpasa secured a EUR563,500 contract to design the airport loop (tunnel, stations and ventilation shaft) on section 1 Airport-Logistic Park, between Mas Blau station (not included in the contract) at chainage 0.750 of the original project and the terminal station between the runways (chainage 3.595 in the original project). Visit www.peyco.es 23/06.Darzal Consultoria y Prevencion received a EUR327,600 contract for general supervision of safety and health during construction of Line 9 of the Barcelona metro. 29/06.Open call for tenders, deadline 15th September, 2006 for quality control on Line 9 on the Barcelona metro, section 1 Airport- Parque Logistico, subsection Terminal between runways-Ch 4,500 and Ch 4,500-Llobregat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158878-2006, OJ S 147, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 15th September, 2006 for quality control on Line 9 on the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Parque Logistico-Fira, and section 1 Airport-Parque Logistico, subsection Llobregat-Parque Logistico. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158874-2006, OJ S 147, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 15th September, 2006 for quality control on Line 9 on the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Bifurcacion-Launch shaft in Motors Street. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158866-2006, OJ S 147, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 18th September, 2006 for quality control of studies and projects for Line 9 of the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=161116-2006, OJ S 149, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 33-34/06.Open call for tenders, deadline 26th September, 2006 for conceptual design of section 3, Zona Universitaria-Sagrera Meridiana (tunnel and stations) on Line 9 on the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=169694-2006, OJ S 157, or contact GISA, Barcelona, fax +34 934444488. E-mail contractacio@gisa.es 35/06.Intemac received a EUR540,300 contract for quality control on Line 9 on the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Parque Logistico-Fira, and section 1 Airport-Parque Logistico, subsection Llobregat-Parque Logistico. Visit www.intemac.es 46/06.Payma Cotas won a EUR260,800 contract for quality control on Line 9 of the Barcelona metro, section 2 Parque Logistico-Zona Universitaria, subsection Bifurcacion-Launch shaft in Motors Street. Visit www.paymacotas.com 46/06.LGAI Technological Center secured a EUR835,300 contract for quality control on Line 9 on the Barcelona metro, section 1 Airport-Parque Logistico, subsections Terminal between runways-Ch. 4+500 and Ch. 4+500-Llobregat, and Fira station on section 2. Visit www.lgai.es 46/06.Typsa has bagged a EUR1.2 million contract for quality control of studies and projects for Line 9 of the Barcelona metro. Visit www.typsa.es 46/06.Open call for tenders, deadline 2nd January, 2007 for quality control during construction of the Zona Universitaria-Bifurcacion subsection on section 2 Parc Logistic-Zona Universitaria on Line 9. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232019-2006, OJ S 216, or contact GISA, Barcelona, fax +34 934444488. E-mail cpublic@mfom.es 50/06.Payma Cotas received a EUR290,000 contract to control quality during construction of the Zona Universitaria-Bifurcacion subsection on section 2 Parc Logistic-Zona Universitaria on Line 9. Visit www.paymacotas.com 08/07.Open invitation to tender, deadline 20th May, 2008 for safety and health coordination for Line 9 of the Barcelona metro related to subsection Bifurcacií³n-Fira, in particular ground improvement; subsection Entry shaft in Motors Street-Zona Franca Zal (infrastructure, stations, workshops and rolling stock depot); subsection Zona Universitaria-Bifurcacií³n (stations); Torrassa interchange station; subsection Bifurcacií³n-Entry shaft in Motors Street and its stations; subsection Entry shaft in Motors Street-Zona Universitaria (complementary interior fit-out, tracks and catenaries as well as ground improvement measurements); and section Parc Logistic-Zona Universitaria (tunnel). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=86772-2008, OJ S 64, or contact GISA, Barcelona, fax +34 934444488. E-mail correu@gisa.es 15/08.Open invitation to tender, deadline 2nd June, 2008 for safety and health coordination for Line 9 of the Barcelona metro related to the infrastructure, stations and installations of several sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=98894-2008, OJ S 73, or contact GISA, Barcelona, fax +34 934444488. E-mail correu@gisa.es 17/08.Open invitation to tender, deadline 9th June, 2008 for design for stations Zona Universitaria, Campus Norte, Manuel Girona and ventilation shafts, as part of the revised section 3 Zona Universitaria-Sagrera Meridiana of Line 9 of the Barcelona metro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104396-2008, OJ S 77, or contact GISA, Barcelona, fax +34 934444488. E-mail correu@gisa.es 18/08.Open invitation to tender, deadline 16th July, 2008 for work control and construction supervision of the New airport terminal-Parc Logistic section 1r. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136952-2008, OJ S 102, or contact GISA, Barcelona, fax +34 934444488. E-mail esm@gisa.cat 23/08.Open invitation to tender, deadline 16th July, 2008 for work control and construction supervision of the Parc Logistic-Bifurcation shaft and Zona Franca entry shaft-Zona Universitaria section 2n. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136951-2008, OJ S 102, or contact GISA, Barcelona, fax +34 934444488. E-mail esm@gisa.cat 23/08.Open invitation to tender, deadline 16th July, 2008 for work control and construction supervision of the Zona Universitaria-Sagrera Meridiana section 3r and section 4t. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136950-2008, OJ S 102, or contact GISA, Barcelona, fax +34 934444488. E-mail esm@gisa.cat 23/08.Cygsa secured a EUR565,100 safety and health coordination contract for Line 9 of the Barcelona metro related to subsection Bifurcacií³n-Fira, in particular ground improvement; subsection Entry shaft in Motors Street-Zona Franca Zal (infrastructure, stations, workshops and rolling stock depot); subsection Zona Universitaria-Bifurcacií³n (stations); Torrassa interchange station; subsection Bifurcacií³n-Entry shaft in Motors Street and its stations; subsection Entry shaft in Motors Street-Zona Universitaria (complementary interior fit-out, tracks and catenaries as well as ground improvement measurements); and section Parc Logistic-Zona Universitaria (tunnel). Visit www.cygsa.com 30/08.Payma Cotas secured a EUR468,600 safety and health coordination contract for Line 9 of the Barcelona metro related to the infrastructure, stations and installations of several sections. Visit www.paymacotas.net 30/08.Auding received a EUR1.2 million contract to design the Zona Universitaria, Campus Norte and Manuel Girona stations and ventilation shafts, as part of the revised section 3 Zona Universitaria-Sagrera Meridiana of Line 9 of the Barcelona metro. Visit www.auding.com 36/08.Prior information notice for execution of construction work at Pozo Campus Norte on Barcelona metro line 9, value EUR6 million. Contract period 14 months commencing February, 2009. http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=267741-2008 OJ S 202 Award procedures start 10.12.2008. Contact Gestio d'Infraestructures, tel +34 9 34 44 44 44, e-mail esm@gisa.cat 43/08.ATI, a consortium of OHL, FCC Construction and Copisa, has been awarded the EUR1 billion concession for construction, maintenance and management of section 1 of line 9 of Barcelona Metro involving 13 stations and 17 km of line serving Prat airport, Llobregat hospital and the terminus at Amadeu Torner station. Line 9 will be the longest metro line in Europe at 46.6 km. Visit www.ohl.es, www.fcc.es, and www.copisa.com. 48/08.



Permalink

Barcelona - es/48MetroLine 9JV Linia 9 secured the EUR12.5 million contract for complementary project no 3, section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacií³-Fira on Line 9. Code TM-00509.5A-C3. Contact GISA, Barcelona, fax +34 934444488, e-mail dlh@gisa.cat. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=127688-2009. 21/09.



Permalink

JV Cerdí  (Scrinser, Comsa, Sorigué) secured the EUR 9.4 million contract for construction of section 2n, subsection fork-access shaft calle Motors, for complementary project n. 2 of line 9 of Barcelona Metro. Contract duration 13 months, code TM-00509.5D-C2. Contact GISA, Barcelona, tel +34 9344444-44, fax -88, e-mail dllobet@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=304564-2009. 47/09.



Permalink

JV Gorg secured the EUR10.3 million contract, VAT not included, for complementary project n.1, section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacio-Fira on Line 9; internal structure complements and tunnel 2 catenaria, section Pozo C/Motors-Zona Universití ria; TBM and shaft adaptation. Contract duration 13.5 months. Bid code TM-00509.5E-C1. Contact GISA, Barcelona, tel +34 9344444-44, fax -88, e-mail dllobet@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129638-2010. 20/10.



Permalink

Open invitation to tender, deadline 31.05.2010, for consultative engineering and construction services for Metro Line 9 in Barcelona, section 3, Zona Universitaria-Sagrera Meridiana: Muntanya Station, shaft enclosure, hall and connection tunnels. Contract duration four months, value EUR344,827.59 excluding VAT. Contact GISA, attn Sigra Elena Sole Minguell, Barcelona, tel +34 9344444-44, fax -88, e-mail: esole@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103718-2010.Bid Code TM-00509.4C-BIS.2. 20/10.Open invitation to tender, deadline 31.05.2010, for consultative engineering and construction services for Metro Line 9 in Barcelona, section 3, Zona Universitaria-Sagrera Meridiana: Putxet, Lesseps and Muntanya stations, inner structures and urbanization. Contract value EUR271,551.72 excluding VAT, duration six months. Contact GISA, attn Sigra Elena Sole Minguell, Barcelona, tel +34 9344444-44, fax -88, e-mail: esole@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103719-2010. Bid code: TM-00509.4C-BIS.1. 20/10.Open invitation to tender, deadline 31.05.2010, for consultative engineering and construction services for Metro Line 9 in Barcelona, section 3, Zona Universitaria-Sagrera Meridiana: Prat de la Riba station, shaft enclosure, hall and connection tunnels.Contract value EUR362,068.96 excluding VAT, duration six months. Contact GISA, attn Sigra Elena Sole Minguell, Barcelona, tel +34 9344444-44, fax -88, e-mail: esole@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103720-2010. Bid code: TM-00509.4B-BIS.2. 20/10.Open invitation to tender, deadline 31.05.2010, for consultative engineering and construction services for Metro Line 9 in Barcelona, section 3, Zona Universitaria-Sagrera Meridiana: Prat de la Riba, Sarria and Mandri stations, inner structures and urbanization. Contract value EUR219,827.59 excluding VAT, duration six months. Contact GISA, attn Sigra Elena Sole Minguell, Barcelona, tel +34 9344444-44, fax -88, e-mail: esole@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103721-2010. Bid code Codice gara: TM-00509.4B-BIS.1. 20/10.



Permalink

Open invitation to tender, deadline 16.06.2010, for the supervision of works during construction of Metro Line 9 in Barcelona, section 3, Zona Universitaria-Sagrera Meridiana: inner structures complements and tunnel 3 catenary. Contract duration 30 months, value EUR1,988,888.89 excluding VAT. Contact GISA, attn Sigra Elena Sole Minguell, Barcelona, tel +34 9344444-44, fax -88, e-mail esole@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=121505-2010. Bid code: TM-00509.4E. 20/10.Open invitation to tender, deadline 16.06.2010, for Baix Llobregat Intermodal Centre construction at Prat de Llobregat. Value contract: EUR68,854,707.65 excluding VAT, duration 34 months. Contact GISA, attn Sigra Elena Sole Minguell, Barcelona, tel +34 9344444-44, fax -88, e-mail esole@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136349-2010. Bid code: TM-00509.6A2-C1. 20/10.



Permalink

JV Gorg secured the EUR10.3 million contract, VAT not included, for complementary project n.1, section 2 Parc Logí­stic-Zona Universitaria, subsection Bifurcacio-Fira on Line 9; internal structure complements and tunnel 2 catenary, section Pozo C/Motors-Zona Universitaria; TBM and shaft adaptation. Contract duration 13.5 months. Bid code TM-00509.5E-C1. Contact GISA, Barcelona, tel +34 9344444-44, fax -88, e-mail dllobet@gisa.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129638-2010. 20/10.



Permalink

The JV Comsa, SA & Dragados, SA & FCC Construccion, SA secured the EUR59.08 million construction contract, VAT not included, for Baix Llobregat Intermodal Centre at Prat de Llobregat. Contact GISA, Barcelona, tel +34 9344444-44, fax -88, e-mail dllobet@gisa.cat.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388662-2010. Bid code: TM-00509.6A2-C1. 01/11.



Permalink

Open invitation to tender, deadline 03.06.2013, for high-voltage electricity supply on Line 9 of the Barcelona metro, value EUR3.99 million, excluding VAT. Duration contract 12 months after award. Contact Infraestructures Ferroviaries de Catalunya, att.n Asun Aspas Blasco, Barcelona, tel +34 934444444, fax +34 934444488, e-mail maaspas@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=124234-2013. 16/13.



Permalink


Open invitation to tender, deadline 08/09/2021, to provide technical assistance for auscultation (sound tests) of the works of the construction project of metro Line 9 in Barcelona to enable tunnel and stations completion.

For tender documents, please click here. Value of the contract is EUR5.50 million, excluding VAT. Duration of the contract will be 90 months. Contact Infraestructures de la Generalitat de Catalunya, attn Xavier Fernandez Urban, Barcelona, tel +34 934444444, fax +34 934444488, email xfernandez@infraestructures.cat. For further on the TED tender, please click here and here. Ref.n. ATDO. TM-00509.AU. 31/21. 

 




Permalink


Open invitation to tender, deadline 10/01/2022, for environmental technical assistance for tunnel works and additional works in the Zona Universitària - Sagrera Meridiana section of Metro Line 9 in Barcelona. For tender documents please click here. The value of the contract is EUR 288,413.60, excluding VAT. Duration of the contract will be 40 months. Contact Infraestructures de la Generalitat de Catalunya SAU, att.ne Xavier Fernandez Urban, Barcelona, tel +34 934444444, fax +34 934444488, email xfernandez@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=624581-2021. Ref.n. ATAM. TM-00509.4F. 49/21.

 



Spain-Barcelona: Environmental engineering consultancy services

2021/S 237-624581

Contract notice

Services

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Infraestructures de la Generalitat de Catalunya, SAU
National registration number: A-59.377.135
Postal address: Calle dels Vergós, 36-42
Town: Barcelona
NUTS code: ES511 Barcelona
Postal code: 08017
Country: Spain
Contact person: Xavier Fernández Urbán
E-mail: xfernandez@infraestructures.cat
Telephone: +34 934444444
Fax: +34 934444488
Internet address(es):
Main address: http://infraestructures.gencat.cat/
Address of the buyer profile: https://contractaciopublica.gencat.cat/perfil/Infraestructures

I.3)Communication

The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contractaciopublica.gencat.cat/ecofin_pscp/AppJava/perfil/Infraestructures

Additional information can be obtained from the abovementioned address

Tenders or requests to participate must be submitted to the abovementioned address

I.4)Type of the contracting authority

Regional or local agency/office

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

Contrato de servicios asistencia técnica ambiental conjunta de las obras de túnel y de las obras adicionales Zona Universitària - Sagrera Meridiana de la línea 9 metro Barcelona. Clave: TM-00509. 4F

Reference number: ATAM. TM-00509.4F

II.1.2)Main CPV code

71313000 Environmental engineering consultancy services

II.1.3)Type of contract

Services

II.1.4)Short description:

Contrato de servicios para la asistencia técnica ambiental conjunta de las obras de Ejecución de las obras de túnel y de las obras adicionales del tramo Zona Universitària - Sagrera Meridiana de la línea 9 de Metro de Barcelona. Claves: TM-00509.4F1 y TM-00509.4F2 y modificados. Clave: TM-00509.4F

II.1.5)Estimated total value

Value excluding VAT: 288 413.60 EUR

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.3)Place of performance

NUTS code: ES511 Barcelona

Main site or place of performance:

Barcelonès

II.2.4)Description of the procurement:

Consultar la documentación técnica asociada a la licitación.

II.2.5)Award criteria

Price is not the only award criterion and all criteria are stated only in the procurement documents

II.2.6)Estimated value

Value excluding VAT: 288 413.60 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in days: 40

This contract is subject to renewal: no

II.2.10)Information about variants

Variants will be accepted: no

II.2.11)Information about options

Options: no

II.2.13)Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation

III.1.2)Economic and financial standing

Selection criteria as stated in the procurement documents

III.1.3)Technical and professional ability

Selection criteria as stated in the procurement documents

III.2)Conditions related to the contract

III.2.2)Contract performance conditions:

Las condiciones de ejecución son las que se indican en el Pliego de Cláusulas Administrativas de la licitación.

Section IV: Procedure

IV.1)Description

IV.1.1)Type of procedure

Open procedure

IV.1.3)Information about a framework agreement or a dynamic purchasing system

IV.1.8)Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: yes

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 10/01/2022

Local time: 13:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Catalan, Spanish

IV.2.6)Minimum time frame during which the tenderer must maintain the tender

Tender must be valid until: 25/05/2022

IV.2.7)Conditions for opening of tenders

Date: 15/02/2022

Local time: 10:05

Place:

Reunión interna.

Information about authorised persons and opening procedure:

Reunión interna.

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no

VI.2)Information about electronic workflows

Electronic ordering will be used

Electronic invoicing will be accepted

VI.3)Additional information:

La presentación se realizará electrónicamente mediante la aplicación de «Sobre Digital», accesible en el espacio virtual de esta licitación, en la dirección web (http://contractaciopublica.gencat.cat/perfil/Infraestructures&gt).

La apertura del sobre núm. 2 (propuesta técnica) se realizará de manera interna a las 12:05 horas del día 25 de enero de 2022.

La apertura del sobre núm. 3 (propuesta económica) se realizará de manera interna a las 10:05 horas del día 15 de febrero de 2022.

VI.4)Procedures for review

VI.4.1)Review body

Official name: Tribunal Català de Contractes del Sector Públic
Postal address: Carrer del Foc, 57
Town: Barcelona
Postal code: 08038
Country: Spain
Telephone: +34 93316200

VI.4.3)Review procedure

Precise information on deadline(s) for review procedures:

Contra este acuerdo se puede interponer recurso especial en materia de contratación, de conformidad con lo que establece el artículo 44 y siguientes de la LCSP y el Real decreto 814/2015, de 11 de septiembre, por el que se aprueba el Reglamento de los procedimientos especiales de revisión de decisiones en materia contractual y de organización del Tribunal Administrativo Central de Recursos Contractuales.

Este recurso tiene carácter potestativo, es gratuito para los recurrentes, se podrá interponer ante el Tribunal Catalán de Contratos del Sector Público, previamente o alternativamente, a la interposición del recurso contencioso administrativo, de conformidad con la Ley 29/1998, de 13 de junio, reguladora de la jurisdicción contencioso administrativa.

VI.5)Date of dispatch of this notice:

02/12/2021




Permalink


Open invitation to tender, deadline 07/03/2022, for technical assistance for coordination of safety and health works at the Zona Universitària - Sagrera Meridiana section of Metro Line 9 in Barcelona. For tender documents please click here. The value of the contract is EUR 930,841.38, excluding VAT. Duration of the contract will be 40 months. Contact Infraestructures de la Generalitat de Catalunya SAU, att.ne Xavier Fernandez Urban, Barcelona, tel +34 934444444, fax +34 934444488, email xfernandez@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=069002-2022. Ref.n. CSS. TM-00509.4F.  06/22.

 

Spain-Barcelona: Civil engineering consultancy services

2022/S 027-069002

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Infraestructures de la Generalitat de Catalunya, SAU
National registration number: A-59.377.135
Postal address: Calle dels Vergós, 36-42
Town: Barcelona
NUTS code: ES511 Barcelona
Postal code: 08017
Country: Spain
Contact person: Xavier Fernández Urbán
E-mail: xfernandez@infraestructures.cat
Telephone: +34 934444444
Fax: +34 934444488
Internet address(es):
Main address: http://infraestructures.gencat.cat/
Address of the buyer profile: https://contractaciopublica.gencat.cat/perfil/Infraestructures
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Contrato servicios para la asistencia técnica conjunta de coordinación de seguridad y salud de las obras tramo Zona Universitaria – Sagrera Meridiana de la línea 9 de Metro de Barcelona. TM-00509.4F

Reference number: CSS. TM-00509.4F
II.1.2)Main CPV code
71311000 Civil engineering consultancy services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 930 841.38 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES511 Barcelona
II.2.6)Estimated value
Value excluding VAT: 930 841.38 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 40
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 07/03/2022
Local time: 13:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Catalan, Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
03/02/2022



Permalink


Postponed from 07/03/2022 to 14/03/2022 the deadline of the open invitation to tender for technical assistance for coordination of safety and health works at the Zona Universitària - Sagrera Meridiana section of Metro Line 9 in Barcelona. For tender documents please click here. The value of the contract is EUR 930,841.38, excluding VAT. Duration of the contract will be 40 months. Contact Infraestructures de la Generalitat de Catalunya SAU, att.ne Xavier Fernandez Urban, Barcelona, tel +34 934444444, fax +34 934444488, email xfernandez@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=122914-2022. Ref.n. CSS. TM-00509.4F.  10/22. 

 




Permalink


Open invitation to tender, deadline 04/04/2022, for the construction management during the building of internal structures, track and catenary accessories for tunnel 3. on the Zona Universitària - Sagrera Meridiana section of Metro Line 9 in Barcelona. For tender documents please click here. The value of the contract is EUR 2.34 million, excluding VAT. Duration of the contract will be 34 months. Contact Infraestructures de la Generalitat de Catalunya SAU, attn Asun Aspas Blasco, Barcelona, tel +34 934444444, fax +34 934444488, email maaspas@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=124621-2022. Ref.n. DO.TM-00509.4E.  12/22.

 

Spain-Barcelona: Construction project management services


2022/S 048-124621

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Infraestructures de la Generalitat de Catalunya, SAU
National registration number: A-59.377.135
Postal address: Calle dels Vergós, 36-42
Town: Barcelona
NUTS code: ES511 Barcelona
Postal code: 08017
Country: Spain
Contact person: Asun Aspas Blasco
E-mail: maaspas@infraestructures.cat
Telephone: +34 934444444
Fax: +34 934444488
Internet address(es):
Main address: http://infraestructures.gencat.cat/
Address of the buyer profile: https://contractaciopublica.gencat.cat/perfil/Infraestructures
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Dirección de las obras de Línea 9 del Metro de Barcelona. Tramo 3º. Zona Universitaria – Sagrera Meridiana. Complementos de estructura interior, vía y catenaria del túnel 3.


Reference number: DO.TM-00509.4E
II.1.2)Main CPV code
71541000 Construction project management services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 2 342 155.20 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES511 Barcelona
II.2.6)Estimated value
Value excluding VAT: 2 342 155.20 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 40
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 04/04/2022
Local time: 13:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Catalan, Spanish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
04/03/2022



Permalink


UTE Auscultación L9 Barcelona from Alcobendas have secured the EUR 4.67 million contract, excluding VAT,  to provide technical assistance for auscultation (sound tests) of the works for the construction of metro Line 9 in Barcelona. Contact Infraestructures de la Generalitat de Catalunya, attn Xavier Fernandez Urban, Barcelona, tel +34 934444444, fax +34 934444488, email xfernandez@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185898-2022. Ref.n. ATDO. TM-00509.AU. 14/22.



Permalink


DAC Enviro SL from Barcellona secured the EUR 247,428 contract, excluding VAT, for environmental technical assistance for tunnel works and additional works in the Zona Universitària - Sagrera Meridiana section of Metro Line 9 in Barcelona. Contact Infraestructures de la Generalitat de Catalunya SAU, att.ne Xavier Fernandez Urban, Barcelona, tel +34 934444444, fax +34 934444488, email mhernandez@infraestructures.cat. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=524566-2022. Ref.n. ATAM. TM-00509.4F. 39/22. 



Permalink

Spain, Barajas - es/47

Airport Services

Work commencing on one-year construction programme for $75 million, 1.47 km-long two-level, three-lane cut-and-cover extension to new airport terminal. Upper level for passenger transport and lower level for baggage movements. Visit www.aena.es 14/01.Award of one-year contract to Constructora Hispanica SA for construction of 1.45 km, two-level extension to service tunnel, value $7.5 million. Visit www.aena.es 20/01.



Permalink

Spain, Burgos - es/46

Motorway

Open invitation to tender, deadline 28th March, 2001, for upgrading of CN-1 highway in Condado de Trevino including construction of twin-tube, three-lane, 1 km-long NATM tunnels with 200 sq m cross-section in sandy loams, calcareous sandstone and siltstone. Contact Ministry of Works, Madrid, fax +34 91 5978537. Visit www.boe.es 12/01. Consultancy contract awarded to Sercal to establish alternative alignments, for report end-2001. Visit www.sercal.es 22/01. Open invitation to tender, deadline 8th August, 2001, for engineering design of a section of the N-1 Madrid-Irun road with one tunnel for Ministry of Works, Madrid, fax +34 91 5978536. Visit www.boe.es and www.sercal.es 30/01.Pancorbo-Ameyugo section of N-1 motorway may require 11.5 m-diameter, 4 km-long, single tube tunnel in clayey ground and limestone. Decision expected late-2002. Visit www.sercal.es 43/01.



Permalink

Spain, Galicia - es/45

High Speed Railway

Open invitations to tender for engineering design of three sections of the high-speed railway line planned through the region, deadlines 23rd January, 2001 to 9th February, 2001. Fax Ministerio de Fomento at +34 91 597 9342 or visit www.gif.es 05/01. Open invitation to tender, deadline 31st July, 2001, for design of railway line to include tunnels. Contact Ministry of Works, Madrid, fax +34 91 5979341. Visit www.boe.es 28/01. Tenders imminent for the Variante de Bregua on the La Coruña-Santiago de Compostela section of the high speed train in Galicia that will connect together Ferrol, La Coruña, Santiago, Pontevedra, Vigo, and the Portuguese border. There will be a 2,834 m-long double-track tunnel. Tender value will be €63 million with a time frame for construction of 28 months. 10/02. Open tendering, deadline 1st April, 2002 for the work supervision of the Variante de Bregua on the La Coruña-Santiago de Compostela section of the high speed train. Includes a 2,834 m-long double-track tunnel. Tender value of €2.3 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 45, document 35365-2002 or contact ministry of development, Madrid, fax +34 915979341/2/3. 11/02. Open tendering, deadline 20th May, 2002 for the construction of the Bregua variant between Boedo and Uxes on the La Coruña-Santiago de Compostela high speed link. Includes a 2.8 km-long double-track tunnel. Tender value of €63 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 77, document 59846-2002 or contact Ministry of development, Madrid, fax +34 915631574. 18/02. Call for tenders imminent further to government approval of the 7.7 km Portela-Portas subsection of the Ferrol-La Coruña-Santiago-Pontevedra-Vigo-Portuguese border high speed line. Includes the 4 km Lantaño tunnel. Cost of €77.6 million and construction time of 34 months. Visit www.gif.es 23/02. Call for tenders imminent further to government approval of the 7.2 km Variante de Ordes on the Santiago-La Coruña line. Includes two tunnels, 446 m and 570 metres in length. Cost of €54.5 million and construction time of three years. Already 20% of the 64.4 km line is under construction. Visit www.gif.es 24/02. Award to Euroconsult of the Variante de Bregua work supervision on the La Coruña-Santiago de Compostela section of the high speed train. Includes a 2.8 km double-track tunnel. Contract value of €1.5 million. 26/02. Open call for bids, deadline 22nd July, 2002 for construction of section 1 Portela-Portas of the Variante de Portas in Pontevedra. The 4 km Lantaño tunnel will be built on this section. Tender value €77.6 million. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 122, document 94905-2002 or contact ministry of development, Madrid, fax +34 915979942 or +34 915978470. E-mail vrpascual@mfom.es and cpublic@mfom.es 27/02. Open call for bids, deadline 25th July, 2002 for construction of the Variante de Ordes in La Coruña. Tender value €54.5 million. Includes two tunnels, 446 m and 570 m. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 124, document 96614-2002 or contact ministry of development, Madrid, fax +34 915979942 or +34 915978470. E-mail vrpascual@mfom.es and cpublic@mfom.es 28/02. Two open call for bids, deadline 28th August, 2002 for work supervision. First is for the Portela-Portas section, including a 4 km tunnel. Tender value €2.7 million. Second is for the Ordes variant, including two tunnels totalling approximately 1 km. Tender value €2.6 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=112289-2002 and http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=112297-2002, OJ S 142, or contact Ministry of development, Madrid, fax +34 915979942 or +34 915979342. E-mail vrpascual@mfom.es and cpublic@mfom.es 31/02. Award by the ministry of development to a jv of Sacyr, Construcciones Paraño and Cavosa of a €54.3 million contract to build the Bregua bypass between La Coruña and Santiago de Compostela including a single 2,834 m-long double-track tunnel. Drill/blast excavation. Visit www.sacyr.com and www.cavosa.es. E-mail marubio@mfom.es 40/02. Award to a joint venture of Aldesa Construcciones, Obras Subterráneas, Dicaminos, and Tableros y Puentes of a €58.7 million contract to build the Portelas-Portas section of the Variante de Portas in Pontevedra, including the 4 km Lantaño tunnel. E-mail marubio@mfom.es 41/02. OHL and its subsidiary Guinovart & Obras y Servicios Hispania have scooped a €46.8 million contract to dual the 7.2 km Oroso-Ordes section in La Coruña, known as Variante de Ordes. Two tunnels will be required, 446 m and 570 m in length. Time frame for construction 30 months. Visit www.ohl.es 45/02. Award to Norcontrol of a €1.8 million contract for work control and supervision of the Portela-Portas section in Pontevedra. Includes the 4 km Lantaño tunnel. Visit www.gif.es 48/02. Public inquiry is open for the León-Ponferrada high speed rail section. The inquiry is based on option 1 from the draft design study undertaken by Iberinsa. This 112.4 km-long option has an estimated cost of €573.7 million. Ten tunnels will be necessary, the longest of which being 3.4 km in length. 13/03. The Ministry of development has requested the environment impact study to the Ministry of environment for the Vigo-Pontevedra high speed section. Option 2 has been selected, 27.7 km in length for an estimated budget of €293.1 million. There are 11 km of tunnels on the alignment. There will be one tunnel under the Vigo-Pontevedra highway, two 5,910 m-long one-track tunnels near A Madroa, a 1,225 m tunnel in Redondela, another two tunnels prior to arriving in Arcade (2,155 m and 925 m) and a 720 m tunnel at the exit of Arcade. 13/03. Open call for bids, deadline 3rd June, 2003 for engineering for section Cerceda-Meirama (8 km) on the high speed train link in Galicia, including two tunnels (190 m and 1,770 m). Tender value: €966,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=076913-2003, OJ S 86, or contact Ministry of development, Madrid, fax +34 915979342. E-mail vrpascual@mfom.es 20/03. Open call for bids, deadline 30th June, 2003 for construction of the Queixas bypass on section Santiago-La Coruña. Length is 6.1 km, whereof a 2,140 m double-track tunnel. Tender budget: €43.9 million. Time frame for construction: 32 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087065-2003, OJ S 97, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es and cpublic@mfom.es 22/03. Open call for bids, deadline 30th June, 2003 for construction of the Portas-Vilagarcía bypass, section II. The length is 6.6 km, whereof the El Pousadoiro double-track tunnel (2,355 m). Tender budget: €43.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087070-2003, OJ S 97, or contatc Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es and cpublic@mfom.es 22/03. Open call for bids, deadline 30th July, 2003 for consultancy and assistance during work control and supervision of section Portas-Vilagarcía de Arousa on the Portas bypass in Pontevedra province. This section includes the Pousadoiro tunnel, 2,355 m in length, for a double track. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=109945-2003, OJ S 122, or contact Ministry of development, Madrid, fax +34 915979342 or 8470. E-mail cpublic@mfom.es 28/03. A €590,950 contract has been awarded to Ginprosa for assistance to the design of the Cerceda-Meirama section of the high speed train in La Coruña province. This section includes two tunnels, 190 m and 1,770 m in length. 32/03. The ministry of development has awarded to Intecsa-Inarsa the design of the Meirama-Bregua section of the high speed line that will link Ferrol, La Coruña, Santiago, Pontevedra, Vigo and the Portuguese border. Includes a 3,390 m tunnel. Budget estimated at €71.5 million. Design will take 12 months. Visit www.intecsa-inarsa.es 35/03. A JV of Aldesa Construcciones, Dicaminos, Tableros y Puentes, and Obras Subterráneas has won a contract to build the Queixas bypass, 6.1 km in length, including a 2,140 m-long 13.3 m-wide single-tube double-track tunnel. Contract value: €33.4 million. Time frame for construction: 32 months. The Queixas bypass is part of the Santiago-La Coruña high speed link. Visit www.aldesaconstrucciones.es and www.obrassubterraneas.es 42/03. Coprosa in JV with Construcciones Sánchez Domínguez have secured a €52.8 million contract to build the second section of the 6.6 km Portas bypass. This section between Portas and Vilagarcía de Arousa includes the 2,355 m-long dual-track Pousadoiro tunnel. Time frame for construction: 28 months. The Portas bypass is part of the Santiago-Vigo high speed rail link. Visit www.coprosa.es 42/03. GPO Ingeniería has secured a €1.2 million contract for work supervision and construction management of the Queixas bypass, which includes a 2,140 m-long 13.3 m-wide dual-track tunnel. Visit www.gpo.es 46/03. Open call for bids, deadline 6th February, 2004 for design and construction of subsection Silleda (Dornelas)-Vedra (6.4 km) and Vedra-Boqueixon (6.9 km) on section Lalin-Santiago. There are six tunnels: O Portino (600 m), O Curro (870 m), Castro (475 m), Caldelas (623 m), O Reboredo (810 m) and Ardilleiro (725 m). Tender budget: 174.4 million euros. Time frame: 36 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=000484-2004, OJ S 1, or contact GIF, Madrid, fax +34 913198535. 03/04. Open call for bids, deadline 28th January, 2004 for design and construction of subsections Amoeiro-Maside (6.3 km) and Maside-Carballino (5.8 km) on section Ourense-Lalin. There are three tunnels: the first is 1,140 m in length, Mundin (1,112 m) and Os Palleiros (360 m). Tender budget: 154 million euros. Time frame: 24 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=001270-2004, OJ S 2, or contact GIF, Madrid, fax +34 913198535. Open call for bids, deadline 28th January, 2004 for design and construction of subsections Carballino-O Irixo (6.7 km) and O Irixo-Lalin (6.5 km) on section Ourense-Lalin. There are three tunnels: Piteira (2,135 m), Barro (1,494 m) and Outeiro (2,866 m). Tender budget: 196.5 million euros. Time frame: 34 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=003056-2004, OJ S 4, or contact GIF, Madrid, fax +34 913198535. For other tunnels tendered, read E-News Weekly 3/2004. 03/04. Open call for bids, deadline 26th February, 2004 for design of the Das Maceiras-Redondela section in Pontevedra province. This 4 km section includes a 1,225 m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=016390-2004, OJ S 19, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 07/04. Open call for bids, deadline 26th February, 2004 for design of the Redondela-Soutomaior section in Pontevedra province. This 3.5 km section includes a 2,155 m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=016364-2004, OJ S 19, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 07/04. Open call for bids, deadline 26th February, 2004 for design of the Vigo-Das Maceiras section in Pontevedra province. This 9 km section includes a 5,910 m twin bore tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=017269-2004, OJ S 20, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es 07/04. Open call for bids, deadline 4th March, 2004 for design of the Uxes-Pocomaco section in La Coruña province. This 4.3 km section includes two tunnels, 320 m in length and 1,850 m under Mount do Espinle. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020232-2004, OJ S 23, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470. E-mail vrpascual@mfom.es or cpublic@mfom.es. Read E-News Weekly 34/2003. More tunnels tendered in E-News Weekly 7/2004. 07/04. Corsan-Corviam has pocketed a EUR90.8 million contract to build the 6.4 km Ourense-Amoeiro section of the Ourense-Santiago line. Includes two tunnels, 679 m and 4,062 m in length. Visit www.corsan-corviam.es 11/04. OHL secured a EUR57.4 million contract for the design and construction of subsection Boqueixon-Santiago de Compostela. This 5.84 km stretch runs entirely in La Coruna province and requires the building of two tunnels in Marrozos (1,260 m) and Santiago (620 m). Visit www.ohl.es 11/04. Construction management and work control of the Ourense-Lalin line goes to Getinsa, for EUR7.6 million. Visit www.getinsa.es 11/04. FCC and Comsa have won a EUR117.8 million contract for the design and construction of subsection Amoeiro-Maside-Carballino (12.1 km) on section Ourense-Lalín, including three tunnels totalling 3.6 km (1,140 m, 1,112 m and 360 m). Time frame for design: six months. Time frame for construction: 21 months. Visit www.fcc.es and www.comsa.com 12/04. Sacyr Vallehermoso, Cavosa and Obras y Servicios de Galicia y Asturias won a EUR115.7 million contract for the design and construction of subsection Carballino-O Irixo-Lalin (13.2 km) on section Ourense-Lalin, including three tunnels totalling 6.5 km (2,135 m, 1,494 m and 2,866 m). Visit www.sacyr.com and www.cavosa.es 12/04. Construction management of section Lalin-Santiago has been awarded to a JV between Idom Internacional and Geocontrol. Subsection Lalin (Baxan)-Lalin (Anzo)-Silleda (Carboeiro), 14.4 km in length, includes five tunnels for a total of 4,725 m (810 m, 1,215 m, 490 m, 790 m and 1,420 m). Subsection Silleda (Dornelas)-Vedra-Boqueixon, 13.3 km in length, includes six tunnels totalling 4,103 m. Subsection Boqueixon-Santiago incorporates two tunnels, 1.2 km and 620 m in length. There are also tunnels on subsection Silleda (Carboeiro)-Silleda (Dornelas). Read E-News Weekly 3/2004. Visit www.idom.es and www.geocontrol.es 12/04. Dragados and Tecsa won a EUR109.5 million contract to design and build subsection Silleda (Dornelas)-Vedra (6.4 km) and Vedra-Boqueixon (6.9 km) on section Lalin-Santiago. There are six tunnels in O Portino (600 m), O Curro (870 m), Castro (475 m), Caldelas (623 m), O Reboredo (810 m) and Ardilleiro (725 m). Visit www.dragados.com 16/04. Payma Cotas has been apppointed designer of the 4.3 km Uxes-Pocomaco section in La Coruna province, which includes two tunnels, 320 m and 1,850 m in length. Contract value: EUR448,900. Visit www.paymacotas.com 24/04. Typsa won a EUR829,190 contract for the design of the 9 km Vigo-Das Maceiras section in Pontevedra province. The section includes a 2 x 5,910 m-long single-track tunnel. Visit www.typsa.es 24/04. Proser won a EUR408,760 contract to design the 3.5 km Redondela-Soutomaior of the high speed line in Pontevedra province. This 3.5 km section includes a 2,155 m tunnel. Visit www.proser.es 26/04. GPO Ingenieria secured a EUR430,900 contrac to to design the 4 km Das Maceiras-Redondela section in Pontevedra province, including the 1,225 m A Madroa tunnel. Visit www.gpo.es 26/04. Open call for bids, deadline 19th August, 2004 for design of the Lalin (Baxan)-Lalin (Anzo)-Silleda (Carboeiro) section, 14.4 km in length, which includes five tunnels for a total of 4,725 m (810 m, 1,215 m, 490 m, 790 m and 1,420 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107740-2004, OJ S 127, or contact GIF, Madrid, fax +34 913198535. This is a rebid further to the decision of the Ministry of public works to cancel a previous design and build tender and to invite tenders separately for design and construction. 29/04. Apia XXI will design the 7.5 km Puebla San Julian bypass, on the Orense-Monforte-Lugo high speed line. The contract is worth EUR1 million. There will be a 570 m tunnel under Mount Castelvelo and a 1,520 m tunnel under Mounts Chaia and Porqueiro. Subscribe to E-News Weekly 19/2003. Visit www.apiaxxi.es 41/04. Apia XXI has secured a EUR1.3 million contract to design section Lalin (Baxan)-Lalin (Anzo)-Silleda (Carboeiro) on the Ourense-Santiago line. This 14.4 km section includes five tunnels (810 m, 1,215 m, 490 m, 790 m and 1,420 m). Visit www.apiaxxi.es 42/04. Open call for bids, deadline 7th February, 2005 for construction of section Ordes-Queixas (3.9 km), which includes two tunnels totalling 1 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221251-2004, OJ S 255, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es or cpublic@mfom.es 02/05. Open call for bids, deadline 24th January, 2005 for work control and supervision during construction of section Ordes-Queixas (3.9 km), which includes two tunnels totalling 1 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213102-2004, OJ S 247, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es or cpublic@mfom.es 02/05. Norcontrol secured a EUR972,500 contract for work control and management of the 3.9 km Ordes-Queixas section, including two tunnels for a total length of 1 km. Visit www.norcontrol.es 16/05. Corsan-Corviam and Copasa won a EUR28.4 million contract for construction of the 4,298 m Ordes-Queixas section, which includes two twin-track tunnels (233 m and 1.023 m). This section connects the Ordes and Queixas bypasses. Visit www.corsan-corviam.es 21/05. Open call for tenders, deadline 11th August, 2005 for construction management of section Cerceda-Meirama (8 km) in La Coruna province. This section includes two tunnels, 190 m and 1,770 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=125922-2005, OJ S 127, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. 28/05. Open call for tenders, deadline 5th September, 2005 for work control and inspection during construction of section Meirama-Bregua, including a 3,390 km tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=137814-2005, OJ S 139, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. 30/05. Open call for bids, deadline 8th September, 2005 for construction of the 9 km Lalin (Baxan)-Lalin (Anzo) section. This section includes three tunnels: A Pena (810 m), Vilar do Xestal (1.215 m) and Anzo (540 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148601-2005, OJ S 149 or contact ADIF, Madrid, fax +34 917005751. 35/05. Open call for bids, deadline 8th September, 2005 for construction of the 5.3 km Lalin (Anzo)-Silleda (Carboeiro) section. This section includes two tunnels, 790 m and 1,420 m in length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148592-2005, OJ S 149 or contact ADIF, Madrid, fax +34 917005751. 35/05. Open call for bids, deadline 19th September, 2005 for construction of the 5 km Meirama-Bregua section. This section includes a 3,469 m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=152716-2005, OJ S 153 or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es or cpublic@mfom.es 35/05. Open call for bids, deadline 28th September, 2005 for construction of the 8.1 km Cerceda-Meirama section. This section includes two tunnels, 1,735 m and 180 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=155729-2005, OJ S 156, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es or cpublic@mfom.es 36/05. A consortium including Sacyr (35%), its affiliate Cavosa (30%), and GEA 21 (35%) will build section Meirama-Bregua on the high speed line in La Coruna province, for EUR75.65 million. The project will convert an existing non-electrified single-track section into a dual track suitable for high speed. The new alignment spans 5.34 km, whereof 88% represents a tunnel and a viaduct. The 3.47 km Meirama tunnel under Mounts Xalo will have two emergency exits (three galleries), advanced safety equipment and plates on the tracks to facilitate the driving with rescue vehicles. Visit www.gruposyv.com, www.cavosa.es and www.gea21.es 44/05. In addition, ADIF awarded contracts worth EUR187.4 million for the construction of sections Lalin (Baxan)-Lalin (Anzo) and Lalin (Anzo)-Silleda (Carboeiro), two sections on the Ourense-Santiago high speed connection. The first bidding process had been cancelled by the ministry of public works to separate design and construction in different contracts. The first section, 9 km in length, will be built by Ferrovial Agroman. It includes three tunnels: A Pena (810 m), Vilar do Xestal (1.215 m) and Anzo (540 m). Visit www.ferrovial.com 44/05. The second section between Lalin (Anzo) and Silleda (Carboeiro), 5.3 km in length, has been awarded to Comsa. It includes two tunnels, 790 m and 1,420 m in length. Visit www.comsa.com 44/05. GPO secured a EUR1.6 million contract for work control and inspection of the 8.1 km Cerceda-Meirama section in La Coruna province, which includes two tunnels (1,735 m and 180 m). Visit www.gpo.es 47/05. Apia XXI secured a EUR1.4 million contract for the work control and inspection during construction of section Meirama-Bregua, including a 3,390 km tunnel. Visit www.apiaxxi.es 48/05. Ferrovial Agroman will construct, for EUR53.4 million, section Cerceda-Meirama (8.1 km) in La Coruna province. This section includes two tunnels, 1,735 m and 180 m in length. Visit www.ferrovial.com 03/06. Open call for tenders, deadline 23rd February, 2006 for construction of the Uxes-Pocomaco section (4.3 km) in La Coruna province, including two tunnels, 1,880 m and 490 m long. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=08578-2006, OJ S 8, or contact Ministry of public works, Madrid, fax +34 915979342 o 915978470. E-mail vrpascual@mfom.es 05/06. Open call for tenders, deadline 4th April, 2006 for control and work supervision during construction of sections Uxes-Pocomaco and Pocomaco-San-Cristobal in La Coruna province. Section Uxes-Pocomaco includes two tunnels (1,880 m and 490 m) while section Pocomaco-San-Cristobal has two (387 m and 282 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=045618-2006, OJ S 43, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es 11/06. Open call for tenders, deadline 10th May, 2006 for design of the Vilargarcia de Arousa-Catoira section (8.3 km) of the Atlantic coast high speed line in Pontevedra province, including three tunnels (1,320 m, 950 m and 490 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077756-2006, OJ S 74, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 18/06. Open call for tenders, deadline 10th May, 2006 for design of the Rialino-Padron section (8.7 km) of the Atlantic coast high speed line in La Coruna province, including one tunnel (1,700 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077730-2006, OJ S 74, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 18/06. Open call for tenders, deadline 27th June, 2006 for safety equipment in a 2,140 m double-track tunnel on the Queixas bypass and in two tunnels totalling 1 km on the Ordes-Queixas bypass on the Santiago-La Coruna high speed link. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105901-2006, OJ S 99, or contact Ministry of public works, Madrid, fax +34 915979342. E-mail vrpascual@fomento.es 23/06. Open call for tenders, deadline 10th July, 2006 for work control and supervision during installation of the safety equipment in a 2,140 m double-track tunnel on the Queixas bypass and in two tunnels totalling 1 km on the Ordes-Queixas bypass on the Santiago-La Coruna high speed link. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=116842-2006, OJ S 109, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 25/06. ACS, through its affiliated companies Dragados and Tecsa, has bagged a EUR51.11 million contract for the construction of section Uxes-Pocomaco on the Atlantic corridor, the high speed link which will connect La Coruna, Santiago de Compostela, Pontevedra and the Portuguese border. This is the first section, 4,346 metres in length, of the two on the 8 km Uxes-La Coruna railway bypass, which will connect the Bregua bypass with La Coruna San Cristobal station. The section includes two tunnels, 490 metres and 1.8 km long. Visit www.dragados.com and www.tecsa.es 27/06. Open call for tenders, deadline 25th September, 2006 for supervision of construction works of the Vigo-Das Maceiras section (9 km) on the Atlantic coast high speed link between La Coruna and Vigo. This section includes the 2 x 6 km Das Maceiras tunnel under Mount A Madroa. Both tubes will lie 30 metres apart and be cross connected every 250 metres. Read E-News Weekly 46/2004. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167256-2006, OJ S 155, or contact Ministry of public works, Madrid, fax +34 91 5979342 or 915978470. E-mail vrpascual@mfomento.es or cpublic@fomento.es 35/06. Open call for tenders, deadline 27th September, 2006 for construction of the Redondela-Soutomaior section (3.5 km) on the Atlantic coast high speed link between La Coruna and Vigo. This section includes a 2,155 m tunnel in Arcade. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168630-2006, OJ S 156, or contact Ministry of public works, Madrid, fax +34 91 5979342 or 915978470. E-mail vrpascual@mfomento.es or cpublic@fomento.es 35/06. AEPO signed a EUR806,000 contract to design the Vilargarcia de Arousa-Catoira section (8.3 km) of the Atlantic coast high speed line in Pontevedra province, including three tunnels (1,320 m, 950 m and 490 m). Visit www.aepo.es 39/06. Inocsa pocketed a EUR660,000 contract to design the Rialino-Padron section (8.7 km) of the Atlantic coast high speed line in La Coruna province, including one tunnel (1,700 m). Visit www.inocsa.es 39/06. GPO received a EUR1.6 million contract to control and supervise the construction of sections Uxes-Pocomaco and Pocomaco-San-Cristobal in La Coruna province. Section Uxes-Pocomaco includes two tunnels (1,880 m and 490 m) and section Pocomaco-San-Cristobal has two as well (387 m and 282 m). Visit www.gpo.es 41/06. The bidding process for supervision of construction works of the 3.5 km Redondela-Soutomaior section on the Atlantic coast high speed link between La Coruna and Vigo has been cancelled. This section includes a 2,155 m tunnel in Arcade. 41/06. Dimetronic won a EUR5 million contract for safety equipment in a 2,140 m double-track tunnel on the Queixas bypass and in two tunnels totalling 1 km on the Ordes-Queixas bypass on the Santiago-La Coruna high speed link. Visit www.dimetronic.es 44/06. Open call for tenders, deadline 20th November, 2006 for work control and supervision during construction of the 9 km Vigo-Das Maceiras section on the Atlantic coast high speed link between La Coruna and Vigo. This section includes the 2 x 6 km Das Maceiras tunnel under Mount A Madroa. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=212891-2006, OJ S 200, or contact Ministry of public works, Madrid, fax +34 91 5979342 or 915978470. E-mail vrpascual@mfomento.es or cpublic@fomento.es 45/06. Open call for tenders, deadline 18th December, 2006 for construction of the 2,540 m-long Soutomaior-Vilaboa section on the Atlantic coast high speed line, including the Xesteira tunnel (782 m), the Pontesampaio tunnel (176 m) and a 243 m cut-and-cover tunnel to cross the N-550 in Arcade. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231655-2006, OJ S 216, or contact Ministry of public works, Madrid, fax +34 915979342 and 915978470. E-mail vrpascual@fomento.es and cpublic@fomento.es 50/06. Open call for bids, deadline 23rd January, 2007 for construction of the Redondela-Soutomaior section in Pontevedra province. This 3.5 km section includes the 2,155 m-long Arcade tunnel. This is a re-bid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=256552-2006, OJ S 240, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@mfom.es or cpublic@mfom.es 01-02/07. Ferrovial Agroman and Obras Subterraneas pocketed a EUR78 million contract to build the Puebla de San Julian railway bypass on the new Orense-Monforte-Lugo high speed line in Lugo province. The section includes three tunnels, of 300 m, 520 m y 1.450 m respectively. Visit www.ferrovial.es and www.obrassubterraneas.es 01-02/07. FCC and Acciona Infraestructuras secured a EUR157.9 million contract to build the Vigo-Das Maceiras section on the Atlantic coast high speed line. This 7,123 m-long section runs from the intersection of the railway with Buenos Aires Avenue in Vigo up to Das Maceiras valley in Redondela. A 6 km tunnel will be built, consisting of two single-track bores built 30 metres apart and connected to each other by safety cross passages every 250 metres. Visite www.fcc.es y www.acciona.es 01-02/07. Applus Norcontrol secured a EUR159,352 contract for site supervision during installation of the safety equipment in a 2,140 m double-track tunnel on the Queixas bypass and in two tunnels totalling 1 km on the Ordes-Queixas bypass on the Santiago-La Coruna high speed link. Visit www.appluscorp.com 03/07. Sener and Geoconsult España secured a EUR3.1 million contract for site supervision during construction of the 9 km Vigo-Das Maceiras section on the Atlantic coast high speed link between La Coruna and Vigo. This section includes the 2 x 6 km Das Maceiras tunnel under Mount A Madroa. Visit www.sener.es and www.geoconsult.es 03/07. Ineco pocketed a EUR1.7 million contract for site supervision during construction of the Puebla de San Julian railway bypass on the new Orense-Monforte-Lugo high speed line in Lugo province. The section includes three tunnels of 300 m, 520 m and 1,450 m respectively. Read E-News Weekly 44/2006. Visit www.ineco.es 03/07. Open call for tenders, deadline 20th February, 2007 for construction of the Das Maceiras-Redondela section on the Atlantic coast high speed line from Ferrol to the Portuguese border through La Coruña, Santiago de Compostela, Pontevedra and Vigo. This 3,922 m-long subsection, in Pontevedra province, requires to construct the 1,220 m-long 88 sq m twin-track Novelle tunnel and cut-and-cover tunnels in Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=18199-2007, OJ S 16, or contact Ministry of public works, Madrid, fax +34 915979342 o 915979938. E-mail vrpascual@fomento.es or cpublic@fomento.es 06/07. Open call for tenders, deadline 16th April, 2007 for on-site supervision and work control during construction of the 2.5 km Soutomaior-Vilaboa section on the Atlantic coast high speed line, including the Xesteira tunnel (782 m), the Pontesampaio tunnel (176 m) and a 243 m cut-and-cover tunnel to cross the N-550 in Arcade. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=50463-2007, OJ S 41, or contact Ministry of Development, Madrid, fax +34 915979342 and 915978470. E-mail vrpascual@fomento.es and cpublic@fomento.es 12/07. Open call for tenders, deadline 8th May, 2007 for work control and on-site supervision on the Atlantic coast high speed link between Vigo and Pontevedra for the 3.9 km Das Maceiras-Redondela section, including the 1.2 km Novelle tunnel and cut-and-cover tunnels in Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length, and for the 3.5 km Redondela-Soutomaior section, including a 2,155 m tunnel in Arcade. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=70472-2007, OJ S 57, or contact Ministry of Development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 14/07. Comsa bagged a EUR34.1 million contract to construct the 2,540 m-long Soutomaior-Vilaboa section on the Atlantic coast high speed line, including the 782 m Xesteira tunnel, the 176 m Pontesampaio tunnel and a 243 m cut-and-cover tunnel to cross the N-550 in Arcade. Visit www.comsa.com 22/07. Construction of the 3.9 km Das Maceiras-Redondela section on the Atlantic coast high speed line from Ferrol to the Portuguese border through La Coruña, Santiago de Compostela, Pontevedra and Vigo has been awarded to Vias y Construcciones and Corsan-Corviam. This EUR39.9 million subsection includes the 1,220 m-long 88 sq m twin-track Novelle tunnel and cut-and-cover tunnels in Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length. Visit www.vias.es and www.corsan-corviam.es 23-24/07. A EUR37.8 million contract has been awarded to Copasa and Tableros y Puentes to construct the Redondela-Soutomaior section in Pontevedra province. This 3.5 km section includes the 2,155 m-long Arcade tunnel. Visit www.copasa.es and www.tapusa.es 23-24/07. Saitec pocketed a EUR2.3 million contract for on-site supervision and work control during construction of the 2.5 km Soutomaior-Vilaboa section on the Atlantic coast high speed line, including the Xesteira tunnel (782 m), the Pontesampaio tunnel (176 m) and a 243 m cut-and-cover tunnel to cross the N-550 in Arcade. Visit www.saitec.es 27-28/07. Open call for tenders, deadline 4th September, 2007 for site supervision and work inspection during construction of the 6.2 km Cerponzons-Portela section on the Atlantic coast high speed line in Pontevedra province. This section includes the 1.3 km San Amaro tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167802-2007, OJ S 136, or contact Ministry of Development, Madrid, fax +34 915979342. E-mail vrpascual@fomento.es and cpublic@fomento.es 30/07. Open call for tenders, deadline 6th September, 2007 for construction of the 6.2 km Cerponzons-Portela section on the Atlantic coast high speed line in Pontevedra province, including the 1.3 km San Amaro tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=174770-2007, OJ S 141, or contact Ministry of Development, Madrid, fax +34 915979342 or 5978470. E-mail vrpascual@fomento.es and cpublic@fomento.es 31/07. Typsa signed a EUR3 million contract for supervision of construction works on the Das Maceiras-Redondela and Redondela-Soutomaior sections, respectively 3.9 km and 3.5 km long, on the Atlantic coast high speed link between La Coruna and Vigo. The first section includes the 1.2 km Novelle tunnel and cut-and-cover tunnels in Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length. The second section includes the 2,155 m Arcade tunnel. Visit www.typsa.es 31/07. Open call for bids, deadline 13th September, 2007 for design of the safety and telecommunication equipment for the Vilagarcía de Arousa-Padrón section on the Atlantic coast high speed link. The Vilagarcía de Arousa-Catoira subsection includes three tunnels, of 1,320, 950 and 490 metres in length. The A Vacariza-Rialiño subsection includes two tunnels, of 300 and 650 metres in length. The Rialiño-Padrón subsection includes a 1.7 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=184135-2007, OJ S 148, or contact ADIF, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 33/07. Enmacosa secured a EUR2 million contract for site supervision and work inspection during construction of the 6.2 km Cerponzons-Portela section on the Atlantic coast high speed line in Pontevedra province. This section includes the 1.3 km San Amaro tunnel. Visit www.enmacosa.com 45/07. Ardanuy scooped a EUR374,500 contract to design the safety and telecommunication equipment for the Vilagarcía de Arousa-Padrón section on the Atlantic coast high speed link. The Vilagarcía de Arousa-Catoira subsection includes three tunnels, of 1,320, 950 and 490 metres in length. The A Vacariza-Rialiño subsection includes two tunnels, of 300 and 650 metres in length. The Rialiño-Padrón subsection includes a 1.7 km tunnel. Visit www.ardanuy.com 47/07. Open call for tenders, deadline 14th March, 2008 for construction of the 8.6 km Rialiño-Padrón section on the Atlantic coast high speed line. This section includes the 1,460 m-long 85 sq m Bustelo tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=46794-2008, OJ S 34, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 09/08. Open call for tenders, deadline 22nd April, 2008 for construction of the Vilagarcia de Arousa-Catoira section in Pontevedra province on the Atlantic coast high speed link. This 8.3 km section includes the 1,970 m Quinteiro tunnel, the 1,335 m Valicobas tunnel, the 625 m Abalo tunnel and the 560 m Outeiro cut-and-cover tunnel. All will accommodate two tracks and feature a minimum cross-section of 85 square metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=74297-2008, OJ S 55, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 14/08. Open call for tenders, deadline 22nd April, 2008 for construction of the A Vacariza-Rialiño section in La Coruña province on the Atlantic coast high speed link. This 8 km section includes the 372 m Monte Ceán tunnel and the 866 m Monte Pozas tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=74296-2008, OJ S 55, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 14/08. Open call for tenders, deadline 13th May, 2008 for construction supervision of the 8 km A Vacariza-Rialiño and 8.6 km Rialiño-Padrón sections in La Coruña province on the Atlantic coast high speed link. This includes the 372 m Monte Ceán tunnel, the 866 m Monte Pozas tunnel and the 1,460 m Bustelo tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=78663-2008, OJ S 58, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 14/08. Open invitation to tender, deadline 12th June, 2008 for execution of works to install the safety systems on the Cerceda-Meirama-Bregua section. The 8.1 km Cerceda-Meirama section includes two tunnels (1,735 m and 180 m) and the 5 km Meirama-Bregua section includes a 3,469 m tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105360-2008, OJ S 78, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 18-19/08. Open invitation to tender, deadline 17th June, 2008 for work management during installation of the safety systems on the Cerceda-Meirama-Bregua section on the Atlantic coast high speed line. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=110301-2008, OJ S 81, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 19/08. The Ministry of development has awarded a joint venture of FCC and Convensa the construction of the A Vacariza-Rialiño section, in La Coruña province, at a price of EUR91.4 million and a time frame for execution of 36 months. This 8 km section forms part of the Atlantic coast line that goes from Ferrol to the border with Portugal. Of particular interest are the Monte Cean and Monte Pozas tunnels, 372 and 866 m in length respectively. Visit www.fcc.es 29/08. The Ministry of development has awarded a joint venture of Acciona Infraestructuras and Obras Subterraneas the construction of the Vilagarcia de Arousa-Catoira section, in Pontevedra province, at a contractual price of EUR126.4 million and a time period for execution of 36 months. This 8.3 km section forms part of the Atlantic coast high speed line from Ferrol to the Portuguese border. The project includes the construction of several tunnels: Quinteiro (1,970 m), Valicobas (1,335 m), Abalo (625 m) and a cut-and-cover tunnel in Outeiro (560 m), all of them being dual-track tunnels. The new line abandons the route followed by the current line, which runs along the Arousa estuary and the Vilagarcia urban area, to adopt an hinterland path across the hills of Monte Xiabre to connect with the Ulla river. South of Vilagarcia de Arousa, it connects with the Portas railway bypass, which is going to be put in service soon, and in the north with a viaduct on the Ulla river, which will be awarded soon. Visit www.acciona-infraestructuras.es and www.obrassubterraneas.es 29/08. Ferrovial Agroman scooped a EUR82.1 million construction contract for the 8.6 km Rialiño-Padrón section on the Atlantic coast high speed line. This section includes the 1,460 m-long 85 sq m Bustelo tunnel. Visit www.ferrovial.es 31/08.Ineco pocketed a EUR2.9 million contract for construction supervision of the 8 km A Vacariza-Riali?o and 8.6 km Riali?o-Padr?n sections in La Coru?a province on the Atlantic coast high speed link. This includes the 372 m Monte Ce?n tunnel, the 866 m Monte Pozas tunnel and the 1,460 m Bustelo tunnel. Visit www.ineco.es 34-35/08.



Permalink

Open invitation to tender, deadline 22.08.2011, for construction of the 6.6 km-long O Canizo tunnel section, through A Mezquita and A Gudina municipalities, Ourense province, on Madrid-Galicia high speed railway. The tender includes the right tube of the 5,372.2 m O Canizo tunnel and the platforms of Puerta de Galicia/Porta de Galicia station at A Gudina. Contract value EUR75.6 million excluding VAT, duration 35 months. Time limit for access to documents 16.08.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210772-2011. 28/11.



Permalink

Open invitation to tender, deadline 03.08.2011, for trackbed installation on Tunnel de la Canda-Vilavellala sub-section, Zamora-Ourense section, on high-speed line Madrid-Galicia, including Vilavella tunnel (902 m). Contract duration 28 months, value EUR49,907,724.73 excluding VAT. Time limit for access to documents 26.07.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179923-2011 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185499-2011. 28/11.



Permalink

Open invitation to tender, deadline 21.09.2011, for the construction of 5,369.9 m-long O Canizo tunnel (left tube) section on the Madrid-Galicia high speed line. Contract value EUR75.9 million excluding VAT, duration 35 months. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=249534-2011 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/21EF6FA512BB7545C12578D100314910?Opendocument. 35/11.



Permalink

Open invitation to tender, deadline 25.10.2011, for construction of 2.3 km Portocamba-Cerdedelo section, including 1.7 km-long Cerdedelo tunnel, on Madrid-Galicia high speed railway. Contract value EUR98,873,481 excluding VAT, duration 35 months. Time limit for access to documents 18.10.2011. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285434-2011. 40/11.Closing Date: 25.10.2011Open invitation to tender, deadline 25.10.2011, for construction of 4.2 km Campobecerros-Portocamba section, including 3,745 m-long Portocamba tunnel, on Madrid-Galicia high speed railway. Contract value EUR88,628,240 excluding VAT, duration 30 months. Time limit for access to documents 18.10.2011. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285433-2011. 40/11.Closing Date: 26.10.2011Open invitation to tender, deadline 26.10.2011, for engineering services during construction of 4.2 km Campobecerros-Portocamba section, including 3,745 m-long Portocamba tunnel, on Madrid-Galicia high speed railway. Contract value EUR3,000,347 excluding VAT, duration 34 months. Time limit for access to documents 19.10.2011. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro,adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286074-2011. 40/11.



Permalink

The JV Copasa Obras y Servicios/Tableros y Puentes/Imathia Construccion secured the EUR73.56 million contract for construction of the 6.6 km-long O Canizo tunnel section through A Mezquita and A Gudina municipalities, Ourense province, on the Madrid-Galicia high speed railway. The tender includes the right tube of the 5,372.2 m O Canizo tunnel and the platforms of Puerta de Galicia/Porta de Galicia station at A Gudina. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit www.adif.es .46/11.



Permalink

The JV SA de Obras y Servicios Copasa (60%), Tableros y Puentes, SA (30%) and Imathia Construcción SI (10%) secured the EUR62.34 million, VAT not included, for construction of the 6.6 km-long O Canizo tunnel section, through A Mezquita and A Gudina municipalities, Ourense province, on Madrid-Galicia high speed railway. The contract includes the right tube of the 5,372.2 m O Canizo tunnel and the platforms of Puerta de Galicia/Porta de Galicia station at A Gudina. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=393287-2011. 02/12.

The JV COMSA SAU (85%) and Anchelergues & Asociados SL (15%) secured the EUR43.68 million contract, VAT not included, for trackbed installation on Tunnel de la Canda-Vilavellala sub-section, Zamora-Ourense section, on high-speed line Madrid-Galicia, including Vilavella tunnel (902 m). Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=375383-2011. 02/12.



Permalink

The JV Inocsa Ingenieria SL (50 percent)/Prointec SA (50 percent) secured the EUR3.53 million contract, VAT not included, for engineering and planning services during the construction of 5,369.9 m-long O Canizo tunnel (left and right tubes) section on the Madrid-Galicia high speed line. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053016-2012. 09/12.



Permalink

JV Petisa Servicios de Ingeniería/Applus Norcontrol secured the EUR2,655,141 contract for engineering services during construction of 2.3 km-long Portocamba-Cerdedelo section, including 1,700 m-long Cerdedelo tunnel, on Madrid-Galicia high speed railway. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument and www.applus.com. 10/12.



Permalink

JV Getinsa Ingenieria y Control Total secured the EUR2,495,933 contract for engineering services during construction of 4.2 km-long Campobecerros-Portocamba section, including 3,745 m-long Portocamba tunnel, on Madrid-Galicia high-speed railway. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument and www.getinsa.es. 10/12.



Permalink

JV Petisa Servicios de Ingeniería/Applus Norcontrol secured the EUR2,655,141 contract for engineering services during construction of 2.3 km-long Portocamba-Cerdedelo section, including 1,700 m-long Cerdedelo tunnel, on Madrid-Galicia high speed railway. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument and www.applus.com. 10/12.



Permalink

The JV Assignia Infraestructuras, SA (40 percent) Copcisa, SA (40 percent) and Velasco Obras y Servicios, SA (20 percent) secured the contract, value EUR61.12 million excluding VAT, for the construction of 5,369.9 m-long O Canizo tunnel (left tube) section on the Madrid-Galicia high speed line. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093911-2012. 15/12.



Permalink

Open invitation to tender, deadline 04.06.2012, for the assistance services during the construction of the tunnel El Corno (right-hand bore) and Cerdedelo-Prado (left-hand bore) sections of the Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense line. Duration of contract 44 months. Time limit for accessing documents 28.05.2012. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=128926-2012 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/251187F5201FC72EC12579D4002A94EB?Opendocument. 18/12.



Permalink

The JV Vias y Construcciones, Torrescamara and Vimac secured the EUR123.25 million contract, duration 34 months, for civil works on the right-hand track of the 9.1 km Prado-Porto section, including the 7.6 km Prado tunnel, plus half of bypasses for the left-hand track, and both tracks of the 1.71 km tunnel at Corga de Vela. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/251187F5201FC72EC12579D4002A94EB?Opendocument. 18/12.



Permalink

Two civil works contracts for the Cerdedelo-Prado section of the Madrid-Ourense route have been awarded. A separate bore is being constructed for each track. The 8.9 km left-hand bore is to be built by JV Coprosa/Insersa for EUR104,477,107, while the El Corno tunnel 8.8 km right-hand bore is to be built by Corsan-Corviam and Taboada y Ramos for EUR88,445,654. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/251187F5201FC72EC12579D4002A94EB?Opendocument. 18/12.



Permalink

Open invitation to tender, deadline, 21.06.2012, for construction of the platform of the right track 8.1 km long Espino tunnel section, on Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR121.02 million, VAT not included, duration 33 months. Time limit for accessing documents 14.06.2012. Contact Adif, C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142758-2012. 19/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.3 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR105.14 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142756-2012. 19/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the right track 7.4 km-long tunnel de la Canda section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR110.9 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142757-2012. 19/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.9 km-long Vilarino-Campobecerros section, on Madrid-Galicia high-speed railway, North-North West corridor. The section includes the Bolanos tunnel (right track 6,800 m, left track 6,780 m) and two viaducts. Contract value EUR107.03 million, VAT not included, duration 38 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=146143-2012. 20/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.6 km Prado tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR107.98 million, VAT not included, duration 34 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=147971-2012. 20/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the right track 7 km-long Vilarino-Campobecerros section, including the 6.8 km right tube of Bolanos tunnel on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR102.06 million, VAT not included, duration 38 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148003-2012. 20/12.



Permalink

Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 8.2 km-long Espino tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR131.84 million, VAT not included, duration 33 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148004-2012. 20/12.



Permalink

Open invitation to tender, deadline 26.06.2012, for engineering services during construction of the platform of the right and left tunnel de la Canda section, on Madrid-Galicia high-speed railway, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense. Contract value EUR9.98million excluding VAT, duration 39 months. Time limit for accessing documents, 19.06.2012. Contact Adif, C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154251-2012. 21/12.



Permalink

Open invitation to tender, deadline 26.06.2012, for engineering services during the construction of the platform of the left and right tracks Espino tunnel section, on the Madrid-Galicia high speed railway, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense. Contract value EUR9.47 million excluding VAT, duration 37 months. Time limit for accessing documents, 19.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154257-2012. 21/12.



Permalink

Open invitation to tender, deadline 26.06.2012, for architectural, engineering and planning services during construction of the platform of the Prada-Porto and left track Prado tunnel section on the Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR4.86 million, VAT not included, duration 38 months. Time limit for accessing documents 19.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154250-2012. 22/12.



Permalink

The JV Ginprosa Ingenieria (40 percent)/Inzamac Asistencias Tecnicas (30 percent)/SERS Consultores en Ingenieria y Arquitectura (30 percent) secured the EUR3.8 million contract, VAT not included, for assistance services during the construction of the tunnel El Corno (right-hand bore) and Cerdedelo-Prado (left-hand bore) sections of the Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense line. Contact Adif C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275329-2012. 36/12.



Permalink

The JV Euroestudios SL, Geocontrol, SA/Geoconsult Espana Ingenieros Consultores, SA/Investigacion y Control de Calidad SA secured the EUR3.2 million contract, VAT not included, for engineering services during the construction of the platform of the left and right tracks Espino tunnel section, on the Madrid-Galicia high speed railway, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense. Contact Adif C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275333-2012. 36/12.



Permalink

The JV Obrascon Huarte Lain SA (70 percent)-Construcciones Adolofo Sobrino SA (15 percent) - Asfaltos y Cnes Elsan SA (15 percent) secured the EUR95.68 million contract, VAT not included, for construction of the platform of the left track 8.2 km-long Espino tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288094-2012. 38/12.



Permalink

The JV Rover Alcisa SA (20 percent)-Construcciones Sanchez Dominguez Sando SA (29 percent)-Construred Obras y Servicios SA (19 percent)-Conacon (10 percent)-Ogensa (22 percent) secured the EUR79.35 million contract, VAT not included, for construction of the platform of the right track 7.4 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288095-2012. 38/12.



Permalink

The JV Dragados/Tecsa secured the EUR78.3 million contract, VAT included, for construction of the platform of the left track 7.6 km Prado tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/C41CF24C869C49E1C1257AC9002D0F7F?Opendocument. 03/13.



Permalink

Open invitation to tender, deadline 10.06.2013, for delivery and installation of safety equipment in tunnels longer than 1 km on the section Vigo-Santiago di Compostela on the Atlantic coast high-speed link. The equipment includes emergency signalling and lighting systems, power and hydraulic systems, detection, fire fighting and control systems. The main tunnels are Redondela (2,491 m), Quinteiro (1,970 m), Bustelo (1,486 m), San Amaro (1,190 m) and Valicobas (1,351 m). Tender value EUR9.35 million, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 06.06.2013. Contact Adif, att.n Ramon Cabello Alvarez, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112182-2013 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/F6116C0CD40B9073C1257B39005C46D1?Opendocument. 15/13.



Permalink

Open invitation to tender, deadline 05.09.2013, for safety and control equipment in tunnel Da Maceiras (2 x 6 km) on Vigo-Das Maceiras section of the Atlantic high-speed line. Contract value EUR9.65 million contract, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 04.09.2013. Contact Adif, att.n Ramon Cabello Alvarez, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=236875-2013. 30/13.



Permalink

The JV Tuneles Eje Atlantico (Sociedad Iberica de Construcciones Electricas, S.A. – Enclavamientos y Senalizacion Ferroviaria Enyse, S.A.) of Alcobendas secured the EUR4.98 million contract, excluding VAT, for delivery and installation of safety equipment in tunnels longer than 1 km on the section Vigo-Santiago di Compostela on the Atlantic coast high-speed link. The equipment includes emergency signalling and lighting systems, power and hydraulic systems, detection, fire fighting and control systems. The main tunnels are Redondela (2,491 m), Quinteiro (1,970 m), Bustelo (1,486 m), San Amaro (1,190 m) and Valicobas (1,351 m). Contact Adif, att.n Ramon Cabello, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290695-2013. 36/13.



Permalink

Sacyr Construccion and Neopul secured the EUR33.6 million contract for superstructure works on the 25.7 km-long section between Vilagarcia de Arousa (Pontevedra) and Padron (A Coruna) on the Atlantic coast high-speed link, including the tunnels Quinteiro (1,970 m), Valicobas (1,351 m) and Bustelo (1,486 m) for a 7.6 km total. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/C3A0256960B3F4C7C1257BF6002D02CE?Opendocument, http://www.sacyr.com/syv/repositorio/syv/gestion/gestorAcc_noticias_es/20/montajeviaVilagarciaaPadron.pdf and http://www.somague.pt. 42/13.



Permalink

FCC Servicios Industriales y Energeticos secured the EUR5,843,084 contract, VAT included, for safety and control equipment in tunnel Da Maceiras (2 x 6 km) on Vigo-Das Maceiras section of the Atlantic high-speed line. Duration of contract 8 months. Contact Adif, att.n Ramon Cabello Alvarez, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit

http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/1A31FC17E670ABA5C1257C1200350082?Opendocument. 45/13.



Permalink

FCC Servicios Industriales y Energeticos di Madrid secured the EUR4,828,995 contract, excluding VAT, for safety and control equipment in tunnel Da Maceiras (2 x 6 km) on Vigo-Das Maceiras section of the Atlantic high-speed line. Contact Adif, att.n Ramon Cabello, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=387285-2013. 47/13.



Permalink


The JV Tuneles Galicia, Sociedad Iberica de Construcciones Electricas SA (75 %) — Sociedad Iberica de Construcciones Electricas de Seguridad SI (25 %) from Alcobendas, Madrid, secured the EUR1,437,072 contract, excluding VAT, for maintenance of civil defense and safety equipment in the Galicia tunnels on the sections which include Orense-Santiago de Compostela on the High-speed North-North West Corridor and the Vigo-La Coruna Atlantic Axis. Contact Adif, Madrid, tel +34 913007450, fax +34 913007692, e-mail contrataciondgdi@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=390351-2015. Ref.n. 2.15/28520.0003. 46/15.




Permalink


Open invitation to tender, deadline 18.01.2016, for the design of civil protection and safety equipment in the tunnels of the Vilarino-Taboadela section, on Madrid-Galicia high-speed railway. The section includes the tunnels Corno (8.5 km, 8.5 km) and Prado (7.6 km, 7.6 km). The contract value is EUR 437,710.98, VAT not included, and the duration of the contract is 12 months. Time limit for accessing documents is up until the 11.01.2016. Contact Adif C/Hiedra, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422606-2015. Ref.n. 3.15/20830.0196 - P011/15. 49/15.




Permalink


Open invitation to tender, deadline 18.01.2016, for the design of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The section includes the tunnels Espino (7.9 km and 7.8 km), O Canizo (5.4 km and 5.4 km), A Canda (7.3 km and  7.3 km) as well as the Padornelo-Lubian (7.3 km and 7.3 km). The contract value is EUR 457,201.03, VAT not included, duration of the contract is 12 months. The time limit for accessing documents is until the 11.01.2016. Contact Adif C/Hiedra, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422603-2015. Ref.n. 3.15/20830.0195 - P 010/15. 49/15.




Permalink

Acciona Infraestructuras, SA (90 %) - CYES Infraestructuras, SA (10 %) secured the EUR79.22 million contract, excluding VAT, for construction of the platform of the right track 7 km-long Vilarino-Campobecerros section, including the 6.8 km right tube of Bolanos tunnel on the Madrid-Galicia high speed railway, North-North West corridor. Contattare  Adif, Madrid, tel  +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282001-2012. 36/12.



Permalink

FCC Construccion, SA (60 %) - Contratas y Ventas, SA (30 %) - Collosa (10 %) secured the EUR82.94 million contract, excluding VAT, for construction of the platform of the left track 7.9 km-long Vilarino-Campobecerros section, on Madrid-Galicia high-speed railway, North-North West corridor. The section includes the Bolanos tunnel (right track 6,800 m, left track 6,780 m) and two viaducts. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282000-2012. 36/12.



Permalink

Prior information notice without call for competition for the provision of protection and safety equipment in the tunnels of the Vilarino-Taboadela section, on Madrid-Galicia high-speed railway. The section includes the tunnels Corno (8.5 km, 8.5 km) and Prado (7.6 km, 7.6 km). The contract value is EUR867,768.60, VAT not included, and the duration of the contract is 15 months from award. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=190792-2018. 25/18.



Permalink

Prior information notice without call for competition for the civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The contract value is EUR805,785.12 EUR, VAT not included. Duration of the contract is 15 months. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188924-2018.

25/18.



Permalink


Prior information notice without call for competition for the ACO (Asistencia para el Control de las Obras) for installation of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The contract value is

EUR805,785.12 EUR, VAT not included. Duration of the contract is 15 months. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188924-2018.

25/18.




Permalink

Prior information notice without call for competition for the project to provide protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. Value of the contract is EUR32.23million, excluding VAT. Duration of the contract 15 months from award.

Contact Adif-Alta Velocidad, Madrid, tel  +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185758-2018.

27/18.



Permalink

Prior information notice without call for competition for the design of refurbishment and upgrading protection and safety installations in the Atlantic Axis tunnels on the Santiago de Compostela-A Coruna section. Value contract EUR400,00, excluding VAT. Duration contract 9 months.

Contact Adif, Madrid, email gestionadministrativaAV@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=081104-2019.

08/19.



Permalink

Elecnor SA from Madrid secured the  EUR27.31 million contract, excluding VAT, for  the design and maintenance of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111179-2019.

Ref.n. 4.18/20830.0283 – OM 001/18. 11/19.



Permalink

Open invitation to tender, deadline 18.03.2019, for the maintenance of civil protection and safety equipment in tunnels in Galicia, on the Ourense-Santiago de Compostela section of the North-North West Corridor high speed line and on Vigo-A Coruna section on the Atlantic Aje. For bid documents please visit http://www.adif.es/es_ES/empresas_servicios/licitaciones/licitaciones.shtml.

The value of the contract is EUR5.94 million, excluding VAT. The duration of the contract is 24 months. Contact Adif, attn Rosa Cabrerizo Ruiz, Madrid, tel +34 913007689, fax +34 913006623, email  rcabrerizo@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103152-2019.

Ref.n. 2.18/28520.0146. 11/19.



Permalink

Postponed from 18.03.2019 to 21.03.2019, the deadline of the open invitation to tender,  for the maintenance of civil protection and safety equipment in the tunnels in Galicia. Located on the Ourense-Santiago de Compostela section of the  North-North West Corridor high speed line and on Vigo-A Coruna section on the Atlantic Aje. For bid documents http://www.adif.es/es_ES/empresas_servicios/licitaciones/licitaciones.shtml.

Value of the contract is EUR5.94 million, excluding VAT. Duration contract 24 months. Contact Adif, attn Rosa Cabrerizo Ruiz, Madrid, tel +34 913007689, fax +34 913006623, email  rcabrerizo@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118002-2019.

Ref.n. 2.18/28520.0146. 11/19.



Permalink

The JV Tuneles Galicia II from Alcobenda, which includes SICE - Sociedad Iberica de Construcciones Electricas SA (75 %) and SICE Seguridad SL (25%) secured the EUR2.21 million contract, excluding VAT, for the maintenance of civil protection and safety equipment in tunnels in Galicia, on the Ourense-Santiago de Compostela section of the North-North West Corridor high speed line and on Vigo-A Coruna section on the Atlantic Aje. Contact Adif, attn Rosa Cabrerizo Ruiz, Madrid, tel +34 913007689, fax +34 913006623, email  rcabrerizo@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399242-2019.

Ref.n. 2.18/28520.0146. 35/19.



Permalink


Open invitation to tender, deadline 21/01/2021, for the construction of the new 1804 m Oural tunnel on the Monforte-Lugo section, of Line 800. Value of the contract is EUR53.59 million, excluding VAT. Duration of the contract 29 months. Click here for tender documents and here where tenders must be sent.  Contact Adif, Madrid, tel +34 913007005, email cfernandez@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0319. 51/20.

 




Permalink


Open invitation to tender, deadline 15/02/2021, for the supply, transport and unloading of bi-block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Click here for tender documents and here where tenders must be sent.  Value of the contract is EUR718,705.50, excluding VAT. Duration of the contract 6 months. Contact Adif, Madrid, tel +34 913007689, fax  +34 913006623, email rcabrerizo@adif.es. For further tender information, please click here. Ref.n. 3.20/27510.0106. 02/21. 

 




Permalink


Open invitation to tender, deadline 02/03/2021, for the treatment of infrastructure, bridges, tunnels and earthworks on the Monforte-Lugo section (km375 + 305 - km379 + 750) of Line 800. Value of the contract is EUR7.46 million, excluding VAT. Duration of the contract 9 months. Click here for tender documents and here where tenders must be sent.  Contact Adif, Madrid, tel +34 913007661, email jmartinezfuentes@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0246. 06/21. 

 



Permalink


Open invitation to tender, deadline 02/03/2021, for the treatment of infrastructure (bridges, tunnels and earthworks) on the Monforte-Lugo section (km379 + 750 - km386 + 474) of Line 800. Value of the contract is EUR7.69 million, excluding VAT. Duration of the contract 11 months. Click here for tender documents and here where tenders must be sent.  Contact Adif, Madrid, tel +34 913007661, email jmartinezfuentes@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0250. 06/21. 

 



Permalink


Open invitation to tender, deadline 02/03/2021, for the treatment of infrastructure features (bridges, tunnels and earthworks) on the Monforte-Lugo section (km386 + 474 - km396 + 299) of Line 800. Value of the contract is EUR11.55 million, excluding VAT. Duration of the contract 12 months. Click here for tender documents and here where tenders must be sent.  Contact Adif, Madrid, tel +34 913007661, email jmartinezfuentes@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0320. 06/21. 

 



Permalink


Prior information notice for the treatment of infrastructure features (bridges, tunnels and earthworks) on the Monforte-Lugo section (km375+305  - km379+750) of Line 800. Value of the contract is EUR 11.55 million, excluding VAT. Duration of the contract 12 months. Click here for tender documents and here where tenders or requests to participate must be sent. Estimated date of publication of contract notice: 30/06/2021. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. For further tender information please click here. 17/21.  

 




Permalink


The JV Luso Galaica de Traviesas SA  (50 %) /Traviesas del Norte SA (50 %) was provisionally awarded the EUR 662,817.85 contract, excluding VAT, for the supply, transport and unloading of twin-block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Duration of the contract is 6 months. If the administrative documentation is not in order within 10 days, a new tender will be published. Contact Adif, Madrid, tel +34 913007689, fax  +34 913006623, email rcabrerizo@adif.es. For further tender information, please click here. Ref.n. 3.20/27510.0106. 19/21.  

             




Permalink


Prior information notice for the supply, transport and unloading of twin -block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Click here for tender documents where tenders/requests to participate must be sent. Value of the contract is EUR 718,705.50, excluding VAT. Duration of the contract is 3 months. Estimated date of publication of the contract notice will be :31/12/2021. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. For further tender information, please click here. 21/21.  

 




Permalink


Ferrovial Construccion SA from  Madrid secured the EUR 41.95 million contract, excluding VAT, for the construction of the new 1804 m Oural tunnel on the Monforte-Lugo section, of Line 800. Contact Adif, Madrid, tel +34 913007005, email cfernandez@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0319. 27/21. 

 




Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.



Permalink


Prior information notice for technical assistance for the waterproofing works on the Vigo das Maceiras tunnel  (2 x 6 km), Line 850 bifurcation Arcade - Vigo Urzaiz, km 0+658 – km 8+937, Vigo Urzaiz - Redondela HS (Pontevedra) section. Click here for tender documents and here for requests to participate. Value of the contract is EUR3 million, excluding VAT. Estimated date of publication of the contract notice will be 31/12/2024. Contact Adif, Madrid, tel +34 913007260, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/129025-2024. 10/24.

 




Permalink

Spain, Badajoz - es/44

Highway

Award of one-year design contract for Badajoz to Venta del Alto section of La Plata N-630 motorway with 1.5 km-long twin-tube to jv of Geoconsult and Ayesa. Visit www.ayesa.es 11/01.



Permalink

Spain, Bages - es/43

Highway

Open invitation to tender, deadline 23rd January, 2001, for construction of San Salvador de Guardiola road with tunnels. Contact GISA, fax +34 93 4300 124 or visit www.boe.es 03/01. Open invitation to tender, expired 8th February, 2001, for preliminary investigation of the section of the proposed Teruel-Zaragoza line from Villareal de Huerva to Carinena which will include a 7-10 km-long tunnel. Contact DGF, Madrid fax +34 91 597 9342. Visit www.boe.es 07/01.Award to GPO Ingeniera SA of engineering design contract for C-37 motorway with tunnels from Igualada to Manresa in Catalonia. Visit www.gisa.es 33/01.



Permalink

Spain, National - es/42

Railways

Open invitations to tender, deadline 9th January, 2001, for three separate feasibility studies for railway lines that will require tunnels: Calatayud in Aragon 80 km to Soria in Castilla y Leon; La Coruna 40 km to El Ferrol in Galicia; and Castejon to Logrono in Navarra. Contact Spanish National Railways, fax +34 91 597 9342 or visit http://ted.eur-op.eu.int 02/01.



Permalink