Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Belgium

Belgium, Brussels - be/23

Road

Open invitation to tender, deadline 10.07.2009, for construction of tunnel at Boulevard Leopold III. Specs and docs from Mme Helene Godin at DIT in Brussels, e-mail helene.godin@mobilit.fgov.be fax +32 27342020. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=141512-2009 22/09.



Permalink

Postponed from 10.07.09 to 17.07.09 the deadline of the open invitation to tender for construction of tunnel at Boulevard Leopold III. Contact Mrs Isabelle Genicot, DIT, Brussels, tel +32 27390694/7390627, fax +32 27342020, e-mail aanbestedingen.beliris@mobilit.fgov.be. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=190359-2009.29/09.



Permalink

Second postponement of open invitation to tender for construction of tunnel at Boulevard Leopold III. Deadline now 07.08.2009. Visit tunnelbuilder archive be/23 for background details. Contact Mrs Isabelle Genicot, DIT, Brussels, tel +32 27390694/7390627, fax +32 27342020, e-mail aanbestedingen.beliris@mobilit.fgov.be. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195261-2009. 30/09.



Permalink

Third postponement of open invitation to tender for construction of tunnel at Boulevard Leopold III. Deadline now 14.08.2009. Visit tunnelbuilder archive be/23 for background details. Contact Mrs Isabelle Genicot, DIT, Brussels, tel +32 27390694/7390627, fax +32 27342020, e-mail aanbestedingen.beliris@mobilit.fgov.be. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=218906-2009. 33/09.



Permalink

Award of contract No 1 for tunnel construction at Boulevard Leopold III, value EUR20,340,386 including VAT at 21%, to THV-Jan de Nul-Van Laere-CIT Blaton of 9308 Hofstade-Aalst. Contract No 2 for surface works went to NV Verhaeren & Co of 1980 Zemst, value EUR8,899,748 including VAT at 21%. More from Catherine Van den Spiegel at transport infrastructure department in Brussels, tel +32 27390694, fax +32 27342020, e-mail adjudications.beliris@mobilit.fgov.be. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140352-2010. 20/10.



Permalink

Competitive dialogue, deadline 16.08.2012, for the refurbishment of the 2.6 km-long Leopold II road tunnel in Brussels. DBFM contract involves refurbishment and 25 years subsequent maintenance. Time limit for receipt of requests for documents, or for accessing documents: 13.07.2012. Tenders or requests to participate must be sent to Ministry of Brussels Region-Capital, Brussels mobility – AED, attn M. Claude Jaugnau, director, Brussels, tel +32 22041-958, fax -512, e-mail cjaugnau@mrbc.irisnet.be. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=166132-2012. 22/12.



Permalink


Negotiated invitation to tender, deadline 01.09.2016, for the refurbishment of the 2.6 km-long Leopold II road tunnel in Brussels. Design, build and maintenance contract involves the refurbishment as well as 25 years subsequent maintenance. The time limit for receipt of requests for documents, or for accessing documents is up until the 19.08.2016. For specifications and documents contact Brussels Regional Public Service (BRPS), Brussels mobility, attn Administrative Support Directorate, Bruxelles, tel +32 22041697/2980, fax +32 22042636, e-mail bmb.da@sprb.irisnet.be. Tenders to be sent to Brussels Regional Public Service (BRPS), Brussels mobility, attn Remi Van Ophem, tel +32 22042980, fax +32 22042636, e-mail rvanophem@sprb.brussels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=264279-2016. Ref.n. DAA-BMB/DGE-DBO/2016.0933 -F02_0. 31/16.




Permalink

Open invitation to tender, deadline 07.09.2017, for the replacement of the emergency power installations, no-break type, in the Belliard (2143 m) and Leopold II (2.6 km) road tunnels in Brussels. Duration of the contract 48 is months from award. Time limit for receipt of requests for documents, or for accessing documents: 17.08.2017. Contact Service public regional de Bruxelles, Bruxelles Mobilite, att.n Tshibela Kabuya, Bruxelles, tel +32 22041987, fax +32 22041503, email tkabuya@sprb.brussels for further information and att.n Geraldine Derousselle, Bruxelles, tel +32 22041697, fax  +32 22042636, email bmb.da@sprb.brussels for spec and docs.  Offers to be sent to Service public regional de Bruxelles, att.n Remi Van Ophem, Bruxelles, tel +32 22041957, fax +32 22042636, e-mail rvanophem@sprb.brussels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=264674-2017. Ref.n. DAA-BMB/DGE-DOB/2017.1123-F02_0. 28/17.



Permalink

Open invitation to tender, deadline 01.03.2018, for the assistance to the project management during refurbishment and maintenance of the  Leopold II (2.6 km) road tunnel in Brussels. Duration of the contract is 48 months from the award. For procurement documents https://enot.publicprocurement.be/enot-war/preViewNotice.do?noticeId=295644. Tenders must be submitted to https://eten.publicprocurement.be/etendering/viewWorkspacesBasedOnExtUrl.do?wsName=DAA-BMB%2FDGE-DBO%2F2017.1080-F02.

 Contact Service public regional de Bruxelles, Bruxelles Mobilite, attn Vincent Thibert, Bruxelles, tel +32 22042183, fax +32 22042636, email vthibert@sprb.brussels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=018603-2018.

Ref.n. DAA-BMB/DGE-DBO/2017.1080-F02_0. 03/18.



Permalink

Belgium 

Brussels - be/23 

Road 

Closing Date: 26/10/2023 

Open invitation to tender, deadline 26/10/2023, for the construction of the safety exits for the Loi (505 m) and Belliard (2143 m) road tunnels in Brussels.  Click here for tender documents. Contact Region of Brussels Capital, Brussesl, email tunnels@sprb.brussels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=577181-2023. 39/23. 

 

here=>https://www.publicprocurement.be/publication-workspaces/ac81d67c-08fc-432d-b19e-15a620ca4625/documents  



Permalink


Open invitation to tender, deadline 26/10/2023, for the construction of the safety exits for the Loi (505 m) and Belliard (2143 m) road tunnels in Brussels.  Click here for tender documents. Contact Region of Brussels Capital, Brussesl, email tunnels@sprb.brussels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=577181-2023. 39/23. 

 




Permalink

Belgium, Antwerp - be/22

Ring Road

The Noriant consortium formed by VINCI, as lead company, through VINCI Concessions (35%) and CFE and its subsidiaries, Aanneming Van Wellen and Dredging International (14%), in association with Besix (25%), Cordeel ZT (11%), Fabricom GTI (10%) and Victor Buyck Steel Construction (5%), has been declared preferred bidder for the concession to operate the Oosterweelverbinding by BAM (Beheersmaatschappij Antwerpen Mobiel), the public sector entity in charge of the plan to construct Antwerp's new infrastructure. The 39-year Public-Private Partnership (PPP) contract relates to the design, financing, building and maintenance of 30 km of traffic lanes in the northwest of Antwerp. Its aim is, in particular, to increase mobility in the Antwerp port area, by completing the western part of the ring road and providing a direct link between the E19 in the north and the E17 in the south to facilitate international transit. Construction work should last four years and should begin at the end of 2008 after the final negotiations for the conclusion of the contract. The project includes the construction of an immersed tunnel under the Schelde river, a curved two-level cable-stayed bridge with a main span of 603 metres on the right bank of the Schelde, interchanges and a toll station. Visit www.werkenantwerpen.be, www.vinci.com, www.cfe.be, www.vanwellen.be, www.dredging.com, www.besix.com and www.fabricom-gti.com 02/08.Open procedure, deadline 11.12.2008, for diagnostic studies about security equipment in Brussels-Capitale region tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287737-2008 OJ S 216 or contact Eric Ghilain, Region Bruxelles-Capitale, fax + 32 2 2041503, e-mail: eghilain@mbhg.irisnet.be 46/08.



Permalink

The JV THV Rots comprising Grontmij and Witteveen+Bos has been commissioned by BAM NV to conduct studies for the combined Oosterweel link, right bank contract, in Antwerp. Work commences in May, 2012. The project, part of Antwerp Ring road (R1), is split into three sub-contracts: Oosterweel junction - the connection between the Scheldt tunnel and the tunnels beneath the docks, with approach and exit ramps for the port and the north of Antwerp; the canal tunnels - two split tunnels, each with 2x2 lanes from the Oosterweel junction to the R1; and reconstruction of the R1 - the viaduct at Merksem will be removed and the R1 will travel partly underground and partly via an open construction to a new bridge across the Albert canal. Visit www.infrasite.nl, www.grontmij.nl and www.witteveenbos.com. 18/12.



Permalink

SECO – Technisch bureau voor het Bouwwezen CVBA of Brussels secured the contract for technical inspection and testing services for the combined Oosterweel link, the  completion of the Antwerp Ring (R1), including the tunnel under the Scheldt . The technical inspection carried out by the awarded company aims to reduce insurance risks of disturbances to the controlled work, covering decennial liability of the founders. The audit mainly concerns the stability and durability of the works and the waterproofing. Contact BAM (Beheersmaatschappij Antwerpen Mobiel), attn Gert Osselaer, Antwerp, tel +32 32030030, e-mail gert.osselaer@bamnv.be. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=173565-2014. Ref.n. BAM-BAM 2014_01-F03. 23/14.



Permalink

Lantis, the project developer responsible for the prestigious Oosterweel link, which will complete the Antwerp Ring Road, has awarded the EUR 570 million contract for the construction of the Scheldt tunnel to the Tijdelijke Handelsvennootschap Combinatie Oosterweeltunnel (THV COTU) consortium.THV COTU is composed of the Belgian construction groups DEME, BESIX, BAM Contractors and Jan De Nul.

The 1.8km Scheldt tunnel, to be built according to the ‘immersed tube’method, will close the Antwerp Ring Road on the north side. Eight tunnel elements of approximately 60,000 t each will be built in the inner port of Zeebrugge and then towed to Antwerp via the North Sea and the Western Scheldt, where they will be immersed in a pre-dredged trench in the River Scheldt in Antwerp.

 

The first preparatory work will start in the autumn of 2020. Construction work for the tunnel itself will begin after the summer of 2021. For further information please click here. 23/20



Permalink

Lantis has awarded to ENGIE Fabricom the contract for the design, realization and maintenance of the traffic and Scheldt tunnel Installations  (lighting, ventilation, communication and fire protection)on the last section of Antwerp Ring Road. For further information please click here. 23/20



Permalink

Belgium, Liege - be/21

Drainage

Open call for tenders, deadline 26th April, 2007 for construction of a drainage tunnel to the Meuse river at Liege Bierset airport. The project includes a 2.5 km-long 2 m-diameter sewer, to be constructed using a pipejacking method. The sewer will be extended along motorway A604 on a length of 2.1 km. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=56382-2007, OJ S 46, or contact Société wallone des aéroports, Jambes, fax +32 81313504. E-mail dva@sowaer.be 11/07.



Permalink

Belgium, Antwerpen - be/20

Railway

Negotiated procedure, deadline 15th June, 2006 for design, build, finance and maintain contract for the Liefkenshoek railway link in Antwerp between the harbour area on the left bank of the Escaut and the existing railway network on the right bank. The total length is 16.2 km, whereof 8 km in tunnel (partially bored). Read E-News Weekly 42/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=083743-2006, OJ S 79, or contact Infrabel, Brussels, fax +32 25254071. E-mail gp@infrabel.be 18/06.Negotiated procedure, deadline 25th August, 2006 for geotechnical surveying (40 core drills and lab tests) along the alignment of the second rail link under the Escaut river. The project forms part of the Liefkenshoek railway link in Antwerp between the harbour area on the left bank of the Escaut and the existing railway network on the right bank. Read E-News Weekly 42/2005. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161204-2006, OJ S 149, or contact Tuc Rail, Brussels, fax +32 25297943 or 25297810. E-mail dmc@tucrail.be 33-34/06.SMET Boring received a EUR500,000 contract for geotechnical surveying (40 core drills and lab tests) along the alignment of the second rail link under the Escaut river. The project forms part of the Liefkenshoek railway link in Antwerp between the harbour area on the left bank of the Escaut and the existing railway network on the right bank. Read E-News Weekly 42/2005. Visit www.smetboring.be 19/07.The EUR845 million Liefkenshoek railway connection project involves the construction and maintenance of the civil infrastructure for a new 16.2 km freight-only railway, whereof 8 km in tunnel, linking the western docks and eastern docks of Antwerp. The project is a design, build, finance and maintain type agreement, with a maturity period of 41½ years (3½ years for construction up to availability plus 38 years after the achievement of availability for maintenance). The promoter for the project is Infrabel. The three shorlisted teams submitted their offers in mid-June and the contract is expected to be awarded next fall. The bidders are: Besix and Eiffage; the Locorail consortium formed by BAM PPP Investments, VINCI Concessions, VINCI Construction Grands Projets and CFE; and Bouygues, Strabag, Jan de Nul, Zueblin and Macquarie. Work will take place from 2008 to 2012. 28/08.The EUR841 million PPP contract to build the 16.2 km-long Liefkenshoek twin-track rail link was awarded in November, 2008 to the Locorail consortium, formed by BAM PPP (50%), CFE (25%) and Vinci Concessions (25%). Belgian rail infrastructure manager Infrabel will rent the link for 38 years at around EUR50 million/year before assuming full ownership. The alignment includes the existing 1,475 m-long Beveren tunnel and almost 6 km of double-bored 7.3 m ID tunnel under the Schelde river. Work started in late-2008 and will be completed in mid-2013 for handover by mid-2014. Click be/20. Visit www.infrabel.be. 08/09.



Permalink

Negotiated procedure, deadline 02.05.2012, for telecommunications equipment on Liefkenshoek railway line. For spec and docs contact Tuc Rail SA, attn Patrick Mille, Bruxelles, tel +32 24327903, e-mail ppcell@tucrail.be. Tenders have to be sent to Infrabel, attn H. de Groof, Antwerpen, site https://enot.publicprocurement.be/enot-war/preViewNotice.do?noticeId=117509. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=112537-2012. 16/12.



Permalink

Negotiated procedure, deadline 29.05.2012, for temporary site ventilation equipment in the Liefkenshoek rail tunnels. For specs and docs contact Lindsey Vergote at Tuc Rail SA in Bruxelles, tel +32 24327345, e-mail ppcell@tucrail.be. Tenders have to be sent to Michel Renard, address as above. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=145211-2012. 20/12.



Permalink

Open invitation to tender, deadline 17.08.2012, for lighting, chauffage and forza motrice for the Liefkenshoek railway link in Antwerp between the left and the right banks of the Escaut. Nel contempo sarà effettuato il cablaggio per le altre instalaazioni all’interno e all’esterno del tunnel. Duration contract 17 months after award. Contact Tuc Rail SA, att.n Bart Lips, Bruxelles, tel +32 24327497, fax +32 25297810, e-mail bart.lips@tucrail.be for info and att.n Patrick Mille, Bruxelles, tel +32 24327903, e-mail ppcell@tucrail.be for spec and docs. Tenders to Infrabel SA, att.n H. De Groof, Antwerpen. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=192526-2012. Bid Code n. TR 056373. 26/12.



Permalink

Swietelsky Baugesellschaft MBH (Traunstein) secured the EUR7,569,800 contract, VAT not included, for track laying inside and outside the tunnel for the Liefkenshoek railway link in Antwerp between the harbour area on the left bank of the Escaut and the existing railway network on the right bank. Contact Mr Bart Lips, Infrabel/Tuc Rail, Bruxelles, tel +32 24327497, fax +32 25297140, e-mail bli@tucrail.be. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=245563-2012. 32/12.



Permalink

Compagnie Belge de Ventilateurs of Tilff secured the EUR644,852 contract, excluding VAT,  for temporary site ventilation equipment in the Liefkenshoek rail tunnels. Contact Werner Deceur at Tuc Rail SA in Bruxelles, e-mail wdc@tucrail.be. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=373387-2012. 48/12.



Permalink

Fabricom SA at Bruxelles secured the EUR8.56 million contract, excluding VAT, for lighting, heating and motive force electrics for the Liefkenshoek railway link in Antwerp between the left and the right banks of the Escaut. At the same time the cabling for the other installations, inside and outside the tunnel, will be done. Contact Tuc Rail SA, att.n Bart Lips, Bruxelles, tel +32 24327497, fax +32 25297810, e-mail bart.lips@tucrail.be. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=015154-2013. Bid Code n. TR 056373. 04/13.



Permalink

Infrabel granted Van den Berg, a Heijmans subsidiary, final contract award for a subcontract for the realisation of the Liefkenshoek railway connection in the port of Antwerp. The contract concerns the construction and 15-year maintenance of the technical systems for the railway tunnel that links the Linkeroever and Rechteroever districts bordering on the left and right shores of the Schelde river. The contract value exceeds EUR28 million. The project comprises the design, construction and maintenance of a number of technical tunnel safety systems and the control systems for the railway tunnel. Visit www.heijmans.nl. 10/13.



Permalink

Open invitation to tender, deadline 12/06/2019, for the maintenance of fire boxes and firefighting equipment in the following 4 railway tunnels of the Antwerp Area North-East: Antigoon tunnel (6750 m), also known as the Liefkenshoekspoor tunnel, Kennedy tunnel (1655 m), Diabolo tunnel and North-South connection Antwerp. Duration of the contract is 120 months. For bid documents https://enot.publicprocurement.be/enot-war/preViewNotice.do?noticeId=328326.

Offers must be sent to

https://eten.publicprocurement.be/etendering/viewWorkspacesBasedOnExtUrl.do?wsName=I-I.NO-7153216040-F05.

Contact Mr Jeroen Hoeben, Infrabel - Area North-East, Antwerpen, tel +32 490525208, email 51m05.aanneming@INFRABEL.BE. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=214255-2019.

Ref.n. : I-I.NO-7153216040-F05_0. 19/19.



Permalink

Belgium, Brussels - be/19

Railway

Negotiated procedure, deadline 10th October, 2005 for construction of the Diabolo project, designed to provide a northern rail connection to Brussels-National airport in Zaventem, section from motorway E19 to the airport. The project mainly includes the completion and redevelopment of the dead-end underground station; entrance and exit shafts for a 8.2 m-diameter slurry mixshield; and two single-track cross-connected tunnels under the runways, the taxi areas and a hangar built on piles, with cut-and-cover stretches from the station to the exit shaft (beneath the taxi areas) and north of the bored tunnels (beneath Bataviastraat, Haecht road, Luchthavenlaan, motorway E19 and its exit and entrance). Click here for a 9-page technical description of the project. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=173143-2005, OJ S 174, or contact Infrabel, Brussels, fax +32 25254071 or TUC Rail, Brussels, fax +32 25297810. E-mail gp@infrabel.be or mip@tucrail.be 38/05.THV Dialink, a consortium consisting of Belgian contractor CEI-De Meyer, Germany's Wayss & Freytag Ingenieurbau (both Royal BAM Group operating companies), MBG of Belgium (affiliated to CFE, who belongs to VINCI), VINCI Construction Grands Projets and Smet Tunnelling, has been awarded a contract to build a 2,270 m-long underground rail link under Brussels National airport in Zaventem to provide a railway access to the north of Belgium. The EUR290 million underground line forms part of a scheme named Diabolo, worth EUR540 million. The underground line will be implemented through a PPP agreement between Infrabel, the state-owned railroad infrastructure manager, and two financial institutions, HSH Nordbank and Babcock & Brown, who set up a specific company for the purpose, named Northern Diabolo NV. Infrabel negotiated a 35-year contract to finance, implement and operate the tunnel with the team of financiers and at the same time negotiated with the construction consortium. Now the deal is concluded, the banks and contractors will join forces to undertake the project. Infrabel will install railroad equipment under a subcontract with Diabolo's builders. A separate subcontract will give Infrabel maintenance responsibility. The tunnel will connect Brussels airport to Mechelen and Brussels. Work is scheduled to commence at the end of October for entry in service in June 2012. Click here. Visit www.cei-demeyer.be, www.bam.nl, www.mbg.be, www.wf-ingbau.de, www.vinci-construction.com and www.smetboring.be 41/07. Ein Shemer Rubber Industries, a rubber manufacturer with over 40 years in the rubber industry, has been chosen by THV Dialink to supply rubber tunnel gaskets for the Diabolo project in Brussels. The project's aim is to connect Brussels Airport to the country's northern railway system, thus promoting rail use for airway passengers and improving accessibility to Brussels Airport. Click here and be/19. Visit www.esrubber.com or click on the banner at the top of the page. 26/08



Permalink


Negotiated invitation to tender, deadline 18.03.2016, for the complete renewal and expansion of security installations in the railway tunnel of the North–South connection (Brussels North - Brussels-South) in Brussels. The time limit for receipt of requests for documents or for accessing documents is the 17.03.2016. The duration of the contract is 24 months from the award. For further information contact TUC Rail SA, att.n Stephanie Mourin, Bruxelles, e-mail ppcell@tucrail.be for the specifications and documents. For electronic access to information go to https://enot.publicprocurement.be/enot-war/preViewNotice.do?noticeId=225718.

Tenders must be sent to TUC Rail SA, att.n Michel Renard, Bruxelles, e-mail ppcell@tucrail.be. For electronic submission of tenders and requests to participate click on the link https://eten.publicprocurement.be/etendering/viewWorkspacesBasedOnExtUrl.do?wsName=I-Build-TR+300302-F05. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=52216-2016. Ref.n. I-Build-TR 300302-F05_0. 07/16.




Permalink

SM Yvan Paque - Valens from Rocourt secured the EUR32,70 million contract, excluding VAT, for the provision of safety equipment  inside the railway tunnel on the North–South connection (Brussels North - Brussels-South) in Brussels. For electronic access to information go to https://enot.publicprocurement.be/enot-war/preViewNotice.do?noticeId=225718. Contact TUC Rail SA, Bruxelles, e-mail ppcell@tucrail.be. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=085442-2017. Ref.n. I-Build-TR 300302-F06. 10/17.



Permalink

Belgium, Brussels - be/18

Sewage

  Denys is building 7.6 km of sewers on the left bank of the Canal of Willebroek and the Senne River in North Brussels, as part of a Build-Own-Operate-Transfer (BOOT) contract awarded to Aquiris, a Franco-Belgian consortium led by Veolia Water for the Brussels North wastewater treatment plant. The entirety of the sewers is constructed by no-dig techniques. There are 11 rectangular start and exit shafts and 15 pipejacked sections built at a depth of 10-18 m, with variable diameters (900 cm, 1.6 m, 1.8 m, 2.2 m and 2.5 m), in alluvial water-bearing ground composed of sand and grind, with lime and clay layers. Five Herrenknecht mixshield TBMs, four already owned by Denys and one newly purchased machine, are being used to excavate the sewer sections. The longest section totals 1,023 m and is driven with the new 2.2 m-diametre TBM. Laser guidance is provided for each drive by SLS-RV systems from VMT GmbH with reinforced concrete pipes supplied by Socea. Warman hydraulic pumps and 6" to 8" discharge ducts remove the slurry. Difficult conditions under Leopold II tunnel requiring to clear wood piles at the cutter head through a man-hole air lock access. Glassfibre rebar cages supplied by Fortius to allow smooth, efficient arrival of TBM at exit shafts. Total investment by Aquiris will be around EUR290 million. Sewers to be complete in September 2005. The plant will be commissioned in September 2007. Visit www.denys.com, www.herrenknecht.com, www.vmt-gmbh.com and www.fortius.be 35/04.



Permalink

Belgium, Antwerp - be/17

Railway

  Award of $60 million construction contract for 1.2 km-long twin-tube TBM tunnels to consortium of CEI, Wayss & Freytag, CFE/MBG/Dumez/GTM, with Jan De Nul, Van Laere and Smet for completion 2004. Visit www.wf-ingbau.de 22/01. Award of contract to construct 1 km of small connections and reconstruct 200 m of Bolivar tunnel to consortium of MBG, CFE, Van Wellen and Frateur for completion 2004. Visit www.cfe.be 24/01.



Permalink

Belgium, Brussels - be/16

Railway

Single tube, two-track, 1.7 km, $110 million Schuman-Josaphat tunnel to be built with rectangular 12 m x 6 m section using diaphragm wall techniques beneath existing road. Tenders in 2002 for construction start 2003 and opening 2007.Visit www.tucrail.com 08/01.Open tendering, deadline 12th November, 2001, for technical design of Schuman-Josaphat tunnel in sands and sandstone. Estimated cost Euro125 million financed by the State. Visit http://ted.eur-op.int, document S 181-124497 or contact the Ministry, fax +32 2 7342020. Also visit www.mcidtff.be 41/01.Open invitations to tender, deadlines 13th October, 2003 and 28th October, 2003 for preliminary research, tests and ground investigation works as part of the Léopold-Josaphat rail connection, including the 2 km twin-track Schuman-Josaphat tunnel. This tunnel will run 300 m under the Residence Palace building and Rue de la Loi, a 100 m concrete box under Berlaymont (already built), 1,250 m near Archimède Street up to tram line 26 and a 350 m section (already built) used by tram line 26. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=159148-2003, OJ S 176, and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=166773-2003, OJ S 185, or contact Service public fédéral mobilité et transports, Brussels, fax +32 27342020. E-mail cbo@mcidtff.be 41/03.Technical design for section 1 of the Schuman-Josaphat tunnel, from Archimède Street to Jamblinne de Meux Square, has been awarded to Bagon and SGI. Visit www.bagon-set.be and www.sgiconsulting.com. For section 2 from Jamblinne de Meux Square to tram line 26, the successful bidder is the Grontmij Belgroma / Maunsell JV. Tenders for construction in 2005. Commissioning in 2010. Visit www.belgroma.be and www.maunsell.com 41/03.Negotiated procedure, deadline 16th August, 2005 for civil engineering works for the Schuman-Josaphat rail connection, including two contracts. Contract Beliris - Infrabel - I.1.21.1. is for 300 m of tunnel under the Residence Palace building and Rue de la Loi and Schuman multimodal station. Contract Beliris - Infrabel - I.1.21.2. is for the 1,250 m twin-track Schuman-Josaphat tunnel between Archimede Street and the tram line 26 junction running under Archimede Street, the Archimede-Stevin-Cortenberg complex, Cortenbergh Avnue, Jamblinne de Meux Square, Plasky Avenue, the Plasky-E. Max-Victor Hugo complex. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=095205-2005, OJ S 96, or contact Service public fédéral, Mobilité et transports, Brussels, fax +32 27342020. E-mail valerie.vanderkelen@mobilit.fgov.be. More info in E-News Weekly 23/2005. 23/05.Three operating companies of Dutch builder Royal BAM Group, namely CEI-De Meyer, Galère and Wayss & Freytag, have won a contract in joint venture with Jan De Nul and Franki Geotechnics for the construction of the Schuman-Josaphat rail link in Brussels. The contract value amounts to approximately EUR210 million. The project includes the reconstruction of the current Schuman rail and underground station, as well as the construction of a 1.5 km-long rail tunnel in the European quarter of Brussels. Visit www.bam.nl, www.cei-demeyer.be, www.galere.be, www.wf-ingbau.de, www.jandenul.com and www.franki-geotechnics.be 21/08.



Permalink

SM Cegelec/Putman/SPIE of Brussels secured the EUR19.51 million contract, excluding VAT, for the equipment of tunnels Schuman-Josaphat (1,250 m), Cinquantenaire (2,331 m) and Schuman, Phase 2. Contact TUC Rail SA, att.n W. Deceur, Brussels, tel +32 24327187, e-mail wdc@tucrail.be. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=102093-2014. Ref. n. TR 012363. 13/14.



Permalink

Negotiated procedure, deadline 14.04.2017, for small civil engineering and electrical works for the Schuman-Josaphat rail connection in Brussels, which includes two lots - in the Schuman, Luxembourg, Germoire, Merode, Meiser & Evere stations on regional lines 26, 26/2 and 161 and for the 1,250 m twin-track Schuman-Josaphat tunnel and tunnel Schuman-Josaphat (1250 m). Duration of the contract is 8 months from the award. For further information contact TUC RAIL SA, Bruxelles, email ppcell@tucrail.be, web  https://eten.publicprocurement.be/etendering/viewWorkspacesBasedOnExtUrl.do?wsName=I-Build-TR+012333-F05 where tenders have to be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=098922-2017. Ref.n. I-Build-TR 012333-F05_0. 11/17.




Permalink


Open invitation to tender, deadline 27.08.2019, for equipment maintenance in the 1250 m Schuman-Josaphat rail tunnel in Brussels.. Duration of the contract is 36 months. For bid documents https://enot.publicprocurement.be/enot-war/preViewNotice.do?noticeId=329392, where tenders have to be sent. Contact Infrabel SA, attn Marieke Blieck, Brussels, tel +32 22248852, email marieke.blieck@infrabel.be. Visit

http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=301700-2019

and

http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=295359-2019.

Ref.n. I-I.CE-57/53/1/18/042-F05_0. 26/19.




Permalink

Belgium, Antwerp-Amsterdam - be/15

High Speed Railway

Invitation to tender for 1.5 km-long Anvers tunnel comprising 1.183 km bored central section with cut-and-cover at both ends to include underground station on the south side. Twin tube will be bored in Antwerpian sand at 7.3 m diameter using a slurry shield from a shaft on the north side. Contact NMBS, Brussels fax +32 252 97810. March 2000.Twin-track 1.2 km-long x 7.3 m-internal diameter tubes to be constructed from Central Station to Damplein in tertiary sand with glauconite clay for Belgium Railways by TBM installing 350 mm-thick 7+1 concrete segmental lining. Seven prequalified consortia awaiting award in February, 2001 for start in April and completion July, 2004. Consultants are TUC Rail with CSL. Visit www.tucrail.com November 2000.



Permalink

Belgium, Braine - be/14

Sewer

Open tendering by deadline 21st October, 1999 for construction of sewer by pipejacking at diameters of 700 mm, 1.2 m and 1.4 m. Contact Intercommunale du Brabant Wallon, fax +32 672 16928. Sept 1999.



Permalink