Infratrasporti TO. S.r.l. ,JV Seli (capogruppo mandataria)/Coopsette secured the contract for the construction of Lingotto-Bengasi section of line 1 of Turin driverless metro. The new underground section, length 1.9 km, double track, includes two stations and two shafts. It will be built with a TBM EPB.Contract value EUR 71.8million, excluding VAT. For further information contact Infratrasporti.To SRL Torino, tel +39 01155927-11, fax -50, e-mail infrato@infrato.it. Visit www.infrato.it, www.selitunnel.com and www.coopsette.it. 49/11