The State of Ceará’s Secretary for Infrastructure secured to the FTS East Line consortium composed by Sacyr Engineering and Infrastructure and the Brazilian construction company Ferrera Guedes (Beloniging to Agis Group) the EUR350 million (BRL1.47 bn) contract to build the Phase 1 of East Line of the Fortaleza Metro (Brazil). Duration works 48 months. The contract involves the construction of the track from Tirol-Moura Brasil station to the train depot, located beyond Papicu station. The project includes 7.3 km of tunneling, of which 6 km will be built by TBM, in addition to four underground stations (Central Chico da Silva, Colegio Militar, Nunes Valente and Papicú) and one ground-level station (Tirol-Moura Brasil). Visit http://www.sacyr.com and https://sacc.cge.ce.gov.br/UploadArquivos/20181030.1063358.Integra.CONTRATO.PDF. 28/18.