The consortium composed of Budimex SA (leader), Gulermak Agir Sanayi Insaat ve Taahhut AS (partner) and Gulermak Sp. z o.o. (partner) have secured the EUR 447,28 million (PLN1.93 bn) contract, excluding VAT, for the demolition, reconstruction, widening and construction of section D from km 48+600 to km 61+220 and for technical infrastructure in the section from km 48+600 to km 61+581 as part of the project to modernise railway line n. 104 Chabowka - Nowy Sacz. The contract includes construction of two tunnels totalling 7.5 km: the main tunnel - external diameter 10.6 m - will be excavated by TBM.
Open invitation to tender, deadline 15/10/2024, for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/530403-2024, https://www.podleze-piekielko.pl and https://www.gov.pl/. Ref.n. 9090/IRZR1/14771/03784/24/P. 36/24.
Postponed to 21/10/2024 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/586552-2024 and https://ted.europa.eu/en/notice/-/detail/530403-2024. Ref.n. 9090/IRZR1/14771/03784/24/P. 40/24.
Postponed to 16/12/2024 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/734659-2024, https://ted.europa.eu/en/notice/-/detail/710587-2024, https://ted.europa.eu/en/notice/-/detail/695603-2024, https://ted.europa.eu/en/notice/-/detail/663863-2024 and https://ted.europa.eu/en/notice/-/detail/622275-2024. Ref.n. 9090/IRZR1/14771/03784/24/P. 49/24.
Postponed to 05/03/2025 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/81036-2025, https://ted.europa.eu/en/notice/-/detail/18036-2025, and https://ted.europa.eu/en/notice/-/detail/756630-2024. Ref.n. 9090/IRZR1/14771/03784/24/P. 06/25.
Postponed to 15/04/2025 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/201151-2025, https://ted.europa.eu/en/notice/-/detail/165432-2025, and https://ted.europa.eu/en/notice/-/detail/132875-2025. Ref.n. 9090/IRZR1/14771/03784/24/P. 14/25.
Open invitation to tender, deadline 14/05/2025, for supervision during the construction of C1 Limanowa -Tymbark section on the railway line n. 104 and of section H Szczyrzyc - Tymbark on railway line n. 622, part of including the new railway line n.622 Podleze - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabowka - Nowy Sacz - Stage II. Click here for bid/tender documents and where tenders must be sent. Duration of contract 57 months. Contact PKP Polskie Linie Kolejowe SA, attn Justyna Leczkowska, Warsaw, tel +48 224733029, fax +48 224732399, email justyna.leczkowska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/226736-2025 and https://www.podleze-piekielko.pl. Ref.n. 9090/IRZU/01587/01276/25/P. 16/25.
Postponed to 24/04/2025 the deadline of the open invitation to tender for the design and construction works of the section H Szczyrzyc - Tymbark on the railway line n. 622 as part of the new railway line Podłęże - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabówka - Nowy Sącz - Stage II. The tracks between Szczyrzyc and Tymbark will pass through two tunnels 3.8 and 1 km long, railway bridges and viaducts. This part of the new railway connection in Małopolska will be ready in 2029. The estimated construction cost is over EUR 468.23 million (2 billion Polish Slots), which will be financed from budget funds. Click here for bid/tender documents and where tenders must be sent. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 (22) 4732482, email agata.wieczorek@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/227884-2025. Ref.n. 9090/IRZR1/14771/03784/24/P. 16/25.
Postponed to 30/05/2025 the deadline of the open invitation to tender for the design and construction works of the C1 Tymbark -Limanowa section on the railway line n. 104, part of project including the new railway line n.622 Podleze - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabowka - Nowy Sacz - Stage II. In total 14 km of new tracks will be built with a new 2 km tunnel between Tymbark and Koszary. Click here for bid/tender documents and where tenders must be sent. Duration of contract 44 months. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 224732488, email agata.biskupska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/286728-2025 and https://ted.europa.eu/en/notice/-/detail/251558-2025. Ref.n. 090/IRZR1/00635/00375/25/P. 19/25.