Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Navarre - es/153

Road

Open invitation to tender, deadline 8th September, 2008 for conceptual and detailed designs for the Erro and Mezkiritz tunnels on road N-135 connecting to France. In both cases, the project consists in designing the route design of the roadway and the carriageway will accomodate two 3.50 m-wide lanes and 1.50 m shoulders. The Erro tunnel, located in the Zubiri and Erro municipalities, will enable drivers to avoid the mountain pass of Erro through a tunnel. There are two possible alternatives: northern alternative which crosses the Erro pass by a 2,300 m tunnel and southern alternative which crosses the Erro pass by two tunnels, of some 1,650 metres and 250 metres respectively. The total length of the project for the northern alternative is 6.6 km while the southern variant is 6.8 km long. The Mezkiritz tunnel project consists in desigining a 2.5 km roadway. The tunnel will avoid the Mezkiritz mountain pass, with an estimated length of 500 metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195430-2008, OJ S 145, or contact government of Navarre, Pamplona, tel. +34 848427426 or fax +34 848427549. To view aerial maps of the routes, visit www.navarra.es/home_es/Actualidad/Archivo+de+notas+de+prensa/Noticias/Obras+Publicas+Transportes+y+Comunicaciones/2008/06/090608op61.htm 32-33/08.



Permalink

Spain, Canaries - es/152

Road

Open invitation to tender, deadline 22nd September, 2008 for construction of the La Aldea de San Nicolas-El Risco section on the Agaete-La Aldea de San Nicolas road link in Isle of Gran Canaria. This nearly 10.4 km road section includes a 2,339 m twin tunnel, two single tube bidirectional tunnels with three lanes, 518 m and 603 m in length, and a 87 m cut-and-cover tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195043-2008, OJ S 145, or contact Canarian government, Las Palmas de Gran Canaria, fax +34 928307020 or 928455356. 32-33/08.



Permalink

Spain, Castilla & Leon and Basque Country - es/151

High Speed Railway

Open invitation to tender, deadline 2nd September, 2008 for geological and geotechnical study for the 20.3 km Miranda del Ebro-Iruí±a de Oca section on the Burgos-Vitoria line. The section includes two tunnels (2.5 km and 3,030 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185068-2008, OJ S 138, or contact ADIF, Madrid, fax +34 917005751. 30/08.Open invitation to tender, deadline 2nd September, 2008 for geological and geotechnical study for the 8.2 km Pancorbo-Ameyugo section on the Burgos-Vitoria line. The section includes three tunnels (4,360 m, 970 m and 960 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185067-2008, OJ S 138, or contact ADIF, Madrid, fax +34 917005751. 30/08.



Permalink

Open invitation to tender, deadline 25.05.2009, for design of 7.25 km-long Pradanos de Bureba-Briviesca subsection including 1,160 m-long tunnel on Burgos-Vitoria section of new 223.8 km-long high speed line Valladolid-Burgos-Vitoria. Click here for the map. Contract value EUR1,379,310, duration 12 months. Note: the new line is on the Atlantic Axis, part of the Madrid-Valladolid-Vitoria-French Border line, with a total investment of more than EUR1.6 billion, excluding Valladolid and Vitoria access. It will be electrified, double track, UIC gauge (1,435 mm), maximum speed 350 km/h and maximum slope of 25 milliseconds per metre. Contact ADIF, Madrid, fax +34 917745814, e-mail pmardaiz@adif.eshttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=107695-2009. 17/09.



Permalink

Proyectos y Servicios (Proser), located in Madrid and part of FCC SA, secured the EUR1.6 million contract for the design of sub-section La Puebla de Arganzon (Burgos) - Iruna de Oca (Alava), length 7.4 km, on Burgos-Vitoria high speed line, including a 3,030 m tunnel. Visit www.fcc.es and www.adif.es. 42/09.



Permalink

Spain, Madrid - es/150

High Speed Railway

Open invitation to tender, deadline 13th August, 2008 for construction of the high speed train tunnel between the stations of Atocha and Chamartin in Madrid. The section is 7.33 km long, whereof 6.85 km corresponding to a UIC gauge dual-track tunnel. Most of the tunnel will be driven using a TBM (6,041 m), except for a short initial stretch (22 m), which will be built using the German method, and the final part, which will be mined using the Madrid method (563 m) and cut-and-cover techniques (170 m). The new tunnel route starts in Mendez Alvaro Street, crosses Emperador Carlos V Roundabout to reach Alfonso XII Street and from there runs along Serrano Street. Then the line heads to Republica Argentina Square to eventually arrive at Chamartin. The new tunnel will have nine emergency exits (Espalter, Puerta de Alcala, Goya, Jose Ortega y Gasset, Maria de Molina, Republica Argentina, Concha Espina, Alberto Alcocer and La Hiedra), eight of which situated in the intermediate shafts and one at grade, three ventilation shafts (Puerta de Alcala, paseo de La Habana and Maria de Molina), one of them being situated in one of the emergency exit shafts, and four pumping shafts, three of which are located at the lower level of each of the three ventilation shafts. The estimated budget (including VAT) is EUR285.6 million and the time period for construction is 32 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=177134-2008, OJ S 133, or contact ADIF, Madrid, fax +34 917005751. 29/08.ADIF, the railway infrastructure administration, received five bids for the construction of the high speed rail tunnel that will cross Madrid. It is budgeted at EUR246.2 million and will take a maximum time frame of 32 months to construct. The five bidders are a consortium formed by Ferrovial and Acciona; a second joint venture of ACS and FCC; a team of Ví­as y Construcciones, Isolux Corsí¡n and Comsa; a consortium between Sacyr Vallehermoso and Aldesa; and OHL allied with Sando and Azvi.The contract consists of the construction of the high speed connection between Madrid's main railway stations of Atocha and Chamartin, similar to the tunnel already under way in Barcelona between the stations of Sants and La Sagrera. The tunnel will articulate the railway connection of all the Spanish high speed lines. Currently, some lines already in service leave and arrive at Chamartin (the high speed line to Valladolid) while other lines have their departure/arrival in Atocha (the lines to Barcelona, Seville, Malaga and the Madrid-Toledo line). The connection will stretch for 7.3 kilometres, of which 6.9 km in tunnel. The project will be jointly financed by the EU Cohesion Fund through the regional development fund 2007-2013. The rate of co-financing is 80%. 38/08.The consortium formed by FCC, ACS, Copisa and Tecsa has been awarded a EUR206 million contract to build the high speed rail tunnel that will cross Madrid between the Atocha and Chamartin stations. The tunnel will be 7.3 km in length, 6.9 km of which will be underground. The route starts at Méndez ílvaro and then crosses Carlos V roundabout, reaching the Alfonso XII street. The contract also includes the modernisation of the railway yard south of Chamartin station to enable the arrival of high speed trains to the station through the tunnel. The project will be jointly financed by the European cohesion fund, to a rate of 80%, as part of the European regional development fund 2007-2013. Visit www.fcc.es, www.dragados.com, www.copisa.com and www.tecsa.es 40/08.



Permalink

Saitec SA of Leioa secured the contract for assistance with construction safety measures on the Madrid-Valladolid-North line tunnels on the stretches Vitoria-Bilbao in Basque Country es/100 and Atocha-Chamartin in Madrid es/150, value EUR4,613,375, duration 36 months. Visit www.saitec.es and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=107016-2009. 17/09



Permalink

The JV Tunel de Serrano (Dragados, S.A., FCC Construccion, S.A., Copisa Constructora Pirenaica, S.A. y Tecsa Empresa Constructora, S.A.) secured the EUR 5,762,359.28 contract, excluding VAT, for complementary works n.4 for platform construction of the UIC gauge section between Atocha and Chamartín in Madrid. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=003397-2014. 02/14.



Permalink


Sistemas y Montajes Industriales SA from Madrid has been awarded the EUR1.25 million contract, excluding VAT, to repair the civil protection installation in the 7km high speed rail tunnel Atocha-Sol-Chamartin in Madrid.  Duration of the contract is 10 months. Contact Adif, att.n Concepcion Fernandez-Gallardo e Maria Lopez,  Madrid, tel +34 913007005, fax  +34 913006104, e-mail maria.lopez@adif.es, cfernandez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=363312-2015. Ref.n. 3.15/27507.0135. 45/15.




Permalink

Open invitation to tender, deadline 17.12.2018, for signalling equipment in a tunnel on the Madrid-Atocha and Madrid-Chamartínsection. The value of the contract is EUR9.74 million, excluding VAT. Duration of the contract will be 7 months. Contact Adif, attn Gregorio Garrido Hernández, Madrid, tel +34 913007644, fax +34 913006104, email ggarrido@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=483764-2018.

Ref.n. 3.18/27507.0159. 45/18



Permalink

Alstom Transporte SA from Madrid secured the EUR8.37 million contract, excluding VAT, for signalling equipment in a tunnel on the Madrid-Atocha and Madrid-Chamartin section. Contact Adif, Madrid, tel +34 913007644, email ggarrido@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=341610-2019.

Ref.n. 3.18/27507.0159. 30/19.



Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.



Permalink

Open invitation to tender, deadline 25/04/2022, for the comprehensive management service for civil protection equipment  in the tunnels on the Madrid-Valencia-Alicante High-Speed Line and the Valencia-La Encina section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR2,996,000, excluding VAT. Duration of the contract will be  48 months. Contact Adif, attn David Fernandez Ramirez, Madrid, tel +34 913007453,  email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165941-2022. Ref.n. 2.21/21506.0032. 13/22. 

  



Permalink


Sistemas y Montajes Industriales SA from Getafe secured the EUR2.05 million contract, excluding VAT, for the comprehensive management service for civil protection equipment  in the tunnels on the Madrid-Valencia-Alicante High-Speed Line and the Valencia-La Encina section. Contact Adif, attn David Fernandez Ramirez, Madrid, tel +34 913007453,  email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=506573-2022. Ref.n. 2.21/21506.0032. 37/22.  



Permalink

Spain, Granada - es/149

Light Rail

The Andalusia regional government has awarded a joint venture of Ferrovial and Ucop a EUR62.8 million contract to build the 3.5 km section from Genil river to La Salud industrial park of the Granada light metro. Due to take 30 months to complete, this section runs underground for its first 1,120 metres (30% of the length), including one underground station among its six stations. A EUR1.7 million construction management contract has been awarded to Iberinsa and Estudio Pereda 4. The cut-and-cover method will be used. Visit www.ferrovial.es, www.iberinsa.es and www.estudiopereda4.com 26/08.The Andalusian regional government awarded a joint venture formed by Dragados, Garasa and Otero the construction of the Méndez Níºí±ez-Genil River section of Granada's light rail for EUR58.1 million and a time frame of 23 months. The Méndez Níºí±ez-Genil River section is 1.26 km long and runs entirely underground. Two stations will be built, named Méndez Níºí±ez and Recogidas. Slurry walls will be constructed for the tunnels and stations and the bulk excavation will be carried out below the roof slab to the bottom level. Visit www.grupoacs.com 28/08.



Permalink


Open invitation to tender, deadline 21/01/2022, for the maintenance of the firefighting and ventilation equipment in the 3 km underground section between Mendez Nunez and Alcazar Genil station of the Granada metro light line. Value of the contract EUR 376,234.70 excluding VAT. Duration of the contract will be 36 months. Contact Agencia de Obra Publica de la Junta de Andalucia, attn Victoria Zambrana, Madrid, tel +34 955007400, fax +34 955007477, email contratacion@aopandalucia.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=667090-2021. Ref.n. T-MG7139/CSV0. 52/21. 

Spain-Madrid: Repair and maintenance services of firefighting equipment

2021/S 251-667090

Contract notice

Services

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Agencia de Obra Pública de la Junta de Andalucía
National registration number: Q4100686G
Postal address: C/ Ponzano
Town: Madrid
NUTS code: ES618 Sevilla
Postal code: 41018
Country: Spain
Contact person: Victoria Zambrana
E-mail: contratacion@aopandalucia.es
Telephone: +34 955007400
Fax: +34 955007477
Internet address(es):
Main address: http://www.juntadeandalucia.es/temas/contratacion-publica/perfiles-licitaciones/perfiles-contratante/detalle/FYV09.html

I.3)Communication

The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.juntadeandalucia.es/temas/contratacion-publica/perfiles-licitaciones/perfiles-contratante/detalle/FYV09.html

Additional information can be obtained from the abovementioned address

Tenders or requests to participate must be submitted to the abovementioned address

I.4)Type of the contracting authority

Other type: Agencia

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

T-MG7139/CSV0: Servicios de mantenimiento del sistema de protección contra incendios y del sistema de ventilación del túnel del Metropolitano de Granada

Reference number: T-MG7139/CSV0

II.1.2)Main CPV code

50413200 Repair and maintenance services of firefighting equipment

II.1.3)Type of contract

Services

II.1.4)Short description:

T-MG7139/CSV0: Servicios de mantenimiento del sistema de protección contra incendios y del sistema de ventilación del túnel del Metropolitano de Granada

II.1.5)Estimated total value

Value excluding VAT: 376 234.71 EUR

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.3)Place of performance

NUTS code: ES614 Granada

Main site or place of performance:

Granada

II.2.4)Description of the procurement:

T-MG7139/CSV0: Servicios de mantenimiento del sistema de protección contra incendios y del sistema de ventilación del túnel del Metropolitano de Granada

II.2.5)Award criteria

Criteria below

Price

II.2.6)Estimated value

Value excluding VAT: 376 234.71 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 36

This contract is subject to renewal: no

II.2.10)Information about variants

Variants will be accepted: no

II.2.11)Information about options

Options: no

II.2.13)Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

II.2.14)Additional information

Section IV: Procedure

IV.1)Description

IV.1.1)Type of procedure

Open procedure

IV.1.3)Information about a framework agreement or a dynamic purchasing system

IV.1.8)Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: no

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 21/01/2022

Local time: 12:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Spanish

IV.2.6)Minimum time frame during which the tenderer must maintain the tender

Duration in months: 6 (from the date stated for receipt of tender)

IV.2.7)Conditions for opening of tenders

Date: 28/01/2022

Local time: 09:30

Place:

Agencia de Obra Pública de la Junta de Andalucía.

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no

VI.3)Additional information:

VI.4)Procedures for review

VI.4.1)Review body

Official name: Tribunal Administrativo de Recursos Contractuales
Town: Sevilla
Country: Spain

VI.5)Date of dispatch of this notice:

22/12/2021



Permalink


Syco Integracion de Sistemas and Gestion de energia, Seguridad Srl from Seville have secured the EUR247,000 contract, excluding VAT. This is for the maintenance of the firefighting and ventilation equipment in the 3 km underground section between Mendez Nunez and Alcazar Genil station on the Granada metro light line. Contact Agencia de Obra Publica de la Junta de Andalucia, attn Victoria Zambrana, Madrid, tel +34 955007400, fax +34 955007477, email contratacion@aopandalucia.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=322055-2022. Ref.n. T-MG7139/CSV0. 25/22. 



Permalink

Spain, Andalusia - es/148

Water

Open invitation to tender, deadline 19th May, 2008 for construction of a water supply pipeline from Beas dam to El Conquero treatment plant in Huelva province. The project is divided in four sections. The second section is a 2,323 m tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=84978-2008, OJ S 63, or contact Hidroguadiana, Merida, fax +34 924302203. E-mail manuela.murillo@hidroguadiana-sa.es 15/08.Open invitation to tender, deadline 5th June, 2008 for detailed design of the dualling of the San Silvestre water tunnel in Huelva province. The existing tunnel is 7,594 m long and features a 4.70 sq m horse shoe-shaped cross-section. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102921-2008, OJ S 76, or contact Agencia Andaluza del Agua, Seville, fax +34 955625293. E-mail juan.jimenez.garcia@juntadeandalucia.es 19/08.FCC pocketed a EUR11.8 million contract to construct a water supply pipeline from Beas dam to El Conquero treatment plant in Huelva province. The project is divided in four sections. The second section is a 2,323 m tunnel. Visit www.fcc.es 29/08.



Permalink


Prior information notice for the construction of a 7.55 km long tunnel with an internal diameter of 3.6 m, parallel to the existing San Silvestre tunnel and with an interdistance of 30 cm. The tunnel will be built with a double shielded TBM and will be lined with HM-40 concrete segments reinforced with steel fiber. The project intends to increase the 10 m3/s  maximum capacity of the San Silvestre tunnel, which is currently a bottleneck for the needs of the Andevalo and Chanza basins, as the upstream and downstream infrastructures allow passage of up to 20 m3/s . 

Estimated date of publication of contract notice: 01/10/2021. Contract value EUR 52.76 million, excluding VAT. Duration of the contract will be 36 months. Contact Ministerio para la Transicion Ecologica y el Reto Demografico, attn Fernando Munoz de Rivera Aguilera, Madrid, tel +34 915976224, fax +34 915975909, email fmrivera@miteco.es . For further on TED tender, please click here. Ref.n. 04.199-0042/2111. 22/21. 

 




Permalink


Open invitation to tender, deadline 13/12/2022, for the construction of a 7.55 km long tunnel with an internal diameter of 3.6 m, parallel to the existing water San Silvestre tunnel. For tender documents, please click here. The contract value is EUR 60.76 million, excluding VAT. Duration of the contract will be 30 months. Contact Direccion General del Agua, Madrid, tel +34 915976363, fax +34 915975909, email bzn-licitacionessgpe@miteco.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=622032-2022. Ref.n. 04.199-0042/2112. 45/22. 

 

España-Madrid: Trabajos de construcción de túneles

2022/S 216-622032

Anuncio de licitación

Obras

Base jurídica:
Directiva 2014/24/UE

Apartado I: Poder adjudicador

I.1)Nombre y direcciones
Nombre oficial: Dirección General del Agua
Número de identificación fiscal: S2817039G
Dirección postal: Plaza de San Juan de la Cruz
Localidad: Madrid
Código NUTS: ES300 Madrid
Código postal: 28071
País: España
Persona de contacto: Dirección General del Agua
Correo electrónico: bzn-licitacionessgpe@miteco.es
Teléfono: +34 915976363
Fax: +34 915975909
Direcciones de internet:
Dirección principal: http://www.miteco.es
Dirección del perfil de comprador: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=v3x9SDwisxEQK2TEfXGy%2BA%3D%3D
I.3)Comunicación
Acceso libre, directo, completo y gratuito a los pliegos de la contratación, en: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=WfCecxPO1r4SugstABGr5A%3D%3D
Puede obtenerse más información en la dirección mencionada arriba
Las ofertas o solicitudes de participación deben enviarse a la dirección mencionada arriba
La comunicación electrónica exige que se utilicen herramientas y dispositivos no disponibles de forma general. Es posible acceder de forma libre, directa, completa y gratuita a estas herramientas y dispositivos, en: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=v3x9SDwisxEQK2TEfXGy%2BA%3D%3D
I.4)Tipo de poder adjudicador
Ministerio o cualquier otra autoridad nacional o federal, incluidas sus delegaciones regionales o locales
I.5)Principal actividad
Medio ambiente

Apartado II: Objeto

II.1)Ámbito de la contratación
II.1.1)Denominación:

Contratación de obra para proyecto de desdoblamiento tunel de San Silvestre (Huelva).

Número de referencia: 04.199-0042/2112
II.1.2)Código CPV principal
45221240 Trabajos de construcción de túneles
II.1.3)Tipo de contrato
Obras
II.1.4)Breve descripción:

Contratación de obra para proyecto de desdoblamiento tunel de San Silvestre (Huelva).

II.1.5)Valor total estimado
Valor IVA excluido: 60 758 282.85 EUR
II.1.6)Información relativa a los lotes
El contrato está dividido en lotes: no
II.2)Descripción
II.2.3)Lugar de ejecución
Código NUTS: ES615 Huelva
II.2.4)Descripción del contrato:

Contratación de obra para proyecto de desdoblamiento tunel de San Silvestre (Huelva).

II.2.5)Criterios de adjudicación
los criterios enumerados a continuación
Criterio de calidad - Nombre: Oferta técnica. Apartado 17.2 del cuadro de características del Pliego de Cláusulas Administrativas Particulares y anejos. / Ponderación: 45
Precio - Ponderación: 55
II.2.6)Valor estimado
Valor IVA excluido: 60 758 282.85 EUR
II.2.7)Duración del contrato, acuerdo marco o sistema dinámico de adquisición
Duración en meses: 30
Este contrato podrá ser renovado: no
II.2.10)Información sobre las variantes
Se aceptarán variantes: no
II.2.11)Información sobre las opciones
Opciones: no
II.2.13)Información sobre fondos de la Unión Europea
El contrato se refiere a un proyecto o programa financiado con fondos de la Unión Europea: no
II.2.14)Información adicional

Apartado III: Información de carácter jurídico, económico, financiero y técnico

III.1)Condiciones de participación
III.1.1)Habilitación para ejercer la actividad profesional, incluidos los requisitos relativos a la inscripción en un registro profesional o mercantil
Lista y breve descripción de las condiciones:

Capacidad de obrar

III.1.2)Situación económica y financiera
Lista y breve descripción de los criterios de selección:

- A5-6

Otros

III.1.3)Capacidad técnica y profesional
Lista y breve descripción de los criterios de selección:

- A5-6

- Otros

III.2)Condiciones relativas al contrato
III.2.2)Condiciones de ejecución del contrato:

Consideraciones de tipo medioambiental. Descripción: Ver apartado 26 1 B del cuadro de características del Pliego de cláusulas administrativas particulares

Consideraciones de tipo social. Descripción: Ver apartado 26 1 C del cuadro de características del Pliego de cláusulas administrativas particulares

Apartado IV: Procedimiento

IV.1)Descripción
IV.1.1)Tipo de procedimiento
Procedimiento abierto
IV.1.3)Información sobre un acuerdo marco o un sistema dinámico de adquisición
IV.1.8)Información acerca del Acuerdo sobre Contratación Pública
El contrato está cubierto por el Acuerdo sobre Contratación Pública: sí
IV.2)Información administrativa
IV.2.2)Plazo para la recepción de ofertas o solicitudes de participación
Fecha: 13/12/2022
Hora local: 15:00
IV.2.3)Fecha estimada de envío a los candidatos seleccionados de las invitaciones a licitar o a participar
IV.2.4)Lenguas en que pueden presentarse las ofertas o las solicitudes de participación:
Español
IV.2.7)Condiciones para la apertura de las plicas
Fecha: 16/02/2023
Hora local: 09:30
Lugar:

MINISTERIO PARA LA TRANSICIÓN ECOLÓGICA Y EL RETO DEMOGRÁFICO

Datos de Dirección:

Calle: Plaza San Juan de la Cruz

CP: 28003

Población: Madrid

País: España

Información sobre las personas autorizadas y el procedimiento de apertura:

Descripción: Por emplearse medios electrónicos y de acuerdo con lo dispuesto en la LCSP, la Mesa Única de Contratación del Ministerio para la Transición Ecológica y el Reto Demográfico acuerda: este acto no será presencial

Apartado VI: Información complementaria

VI.1)Información sobre la periodicidad
Se trata de contratos periódicos: no
VI.3)Información adicional:
VI.4)Procedimientos de recurso
VI.4.1)Órgano competente para los procedimientos de recurso
Nombre oficial: Tribunal Administrativo Central de Recursos Contractuales
Dirección postal: Avenida General Perón, 38, planta 8
Localidad: Madrid
Código postal: 28020
País: España
VI.5)Fecha de envío del presente anuncio:
04/11/2022



Permalink

Spain, Catalonia - es/147

Road

Open invitation to tender, deadline 20th May, 2008 for design of a 2.8 km bypass to road N-152 in Ribes de Freser in Girona province. The road currently crosses the municipality and a new road has to be designed. It includes a 1,520 m bidirectional single bore tunnel, with two 3.5 m lanes, two 1 m shoulders and a 0.75 berm. Read E-News Weekly 5/2005 & 7/2003. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=67661-2008, OJ S 49, or contact Ministry of development, Madrid, fax +34 915978547 or 915978470. E-mail jmmendoza@fomento.es or cpublic@fomento.es 14/08.Open invitation to tender, deadline 23rd June, 2008 to design the 18.2 km Ribes de Freser bypass road-La Molina section on road N-152 in Girona province. The section includes the 1,790 m Toses tunnel, a single bore bidirectional tunnel for two 3.5 m lanes, two shoulders and a berm. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=91926-2008, OJ S 68, or contact Ministry of development, Madrid, fax +34 915978547 or 915978470. E-mail jmmendoza@fomento.es or cpublic@fomento.es 16/08.Apia XXI partnered with Geoplank to win a EUR1.9 million contract to design the 18.2 km Ribes de Freser bypass road-La Molina section on road N-152 in Girona province. The section includes the 1,790 m Toses tunnel, a single bore bidirectional tunnel for two 3.5 m lanes, two shoulders and a berm. Visit www.apiaxxi.es and www.geoplank.es 42/08.



Permalink

Spain, Catalonia - es/146

Railway

Open call for tenders, deadline 13th May, 2008 for construction supervision of the Figueras railway bypass on the Barcelona-Portbou conventional line. This 9,276 m project includes a 1,186 m tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=78662-2008, OJ S 58, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es or cpublic@fomento.es 14/08.



Permalink

Open invitation to tender, deadline 12.08.2009, for GSM-R (Global System Mobile-Railways) installation on local railways of Adif in Barcelona. The project involves about 500 line km, of which 57 km is in tunnel. Contract value EUR 18 million, duration 32 months. Time limit for receipt of requests for documents or for accessing documents: 31.07.2009. Contact Seitt, Madrid, attn: Jose Manuel Dorrego Iglesias, tel +34 9159166-29, fax -30, e-mail jmdorrego@seitt.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=166237-2009 26/09.



Permalink

Prior information notice without call for competition for the environmental impact assessment (EIA) and for the construction works and installations project ifor the El Garraf railway tunnels on the Madrid (Chamartín)-Barcelona-France line in Barcelona,. Has to adapt to EU regulation n. 1303/2014. Contract value EUR4.5 million, excluding VAT. Duraton of the contract 20 months. Contact Adif, Madrid, email gestionadministrativaAV@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 081098-2019. 12/19.



Permalink

The JV Tuneles del Garraf from Madrid secured the EUR3.09 million contract, excluding VAT, for the environmental impact assessment (EIA) and for the construction works and installations project for the El Garraf railway tunnels on the Madrid (Chamartin)-Barcelona-France line in Barcelona. Has to adapt to EU regulation n. 1303/2014. Contact Adif, Madrid, tel +34 917674241, email mgracia@adif.es. For further information please click here. Ref.n. 3.19/27507.0005.  48/19.



Permalink


Open invitation to tender, deadline 25/04/2022,  for the construction of the construction projects for the undergrounding of the Barcelona suburban line R2 as it passes through the urban area of Montcada i Reixac (Barcelona) and for the construction of the new station. It will be a 3 track tunnel (4 km). Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154327-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=107854-2022. Ref.n. 3.22/06110.0016– ON 003/22. 12/22.


Spain-Madrid: Railway tunnel construction work

2022/S 060-154327

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2022/S 042-107854)

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: ADIF
National registration number: Q2801660H
Postal address: Avda. Pío XII, 110 – Caracola 16
Town: MADRID
NUTS code: ES300 Madrid
Postal code: 28036
Country: Spain
E-mail: contrataciondcc@adif.es
Telephone: +34 917744804
Fax: +34 917674490
Internet address(es):
Main address: www.adif.es

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Ejecución de las obras de los proyectos de construcción del soterramiento de la línea R2 de cercanías de Barcelona a su paso por el casco urbano de Montcada i Reixac (Barcelona) y de la nueva estación

Reference number: 3.22/06110.0016– ON 003/22
II.1.2)Main CPV code
45221242 Railway tunnel construction work
II.1.3)Type of contract
Works

Section VI: Complementary information

VI.6)Original notice reference
Notice number in the OJ S: 2022/S 042-107854

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 28/03/2022
Local time: 13:00
Read:
Date: 25/04/2022
Local time: 13:00
Section number: IV.2.7
Instead of:
Date: 12/05/2022
Local time: 10:00
Read:
Date: 09/06/2022
Local time: 10:00
VII.2)Other additional information:



Permalink


Adif has suspended the submission of offers for the open procedure, deadline 25/04/2022, relating to the undergrounding, with a tunnel of about 4 km with 3 tracks, of the conventional line R2 Barcelona-Portbou as it crosses the urban area of Montcada i Reixac (Barcelona) and the construction of the new station. The new dates will be published later. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=211249-2022. Ref. n. 3.22/06110.0016– ON 003/22. 17/22.



Permalink


The open invitation to tender, deadline 25/04/2022, for the undergrounding of the Barcelona suburban line R2 as it passes through the urban area of Montcada i Reixac (Barcelona) and for the construction of the new station, has been interrupted and the contract was not awarded. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=680390-2022. Ref.n. 3.22/06110.0016– ON 003/22. 49/22. 



Permalink


Open invitation to tender, deadline 02/02/2023, for the execution of the works for the construction projects of the undergrounding of the Barcelona suburban line R2 as it passes through the urban area of Montcada i Reixac (Barcelona) and the new station. It will be a 3 track tunnel (4 km). Click here for tender documents and here where tenders must be sent. The value of the contract is EUR 515.99 million, excluding VAT. The duration of the contract will be 72 months. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=695551-2022. Ref.n. 3.22/06110.0199. 50/22. 

 

España-Madrid: Trabajos de construcción de túneles de ferrocarril


2022/S 241-695551

Anuncio de licitación

Obras

Base jurídica:
Directiva 2014/24/UE

Apartado I: Poder adjudicador

I.1)Nombre y direcciones
Nombre oficial: ADIF
Número de identificación fiscal: Q2801660H
Dirección postal: Avda. Pío XII, 110 – Caracola 16
Localidad: MADRID
Código NUTS: ES300 Madrid
Código postal: 28036
País: España
Correo electrónico: contrataciondcc@adif.es
Teléfono: +34 917744804
Fax: +34 917674490
Direcciones de internet:
Dirección principal: www.adif.es
I.3)Comunicación
Acceso libre, directo, completo y gratuito a los pliegos de la contratación, en: http://contrataciondelestado.es/wps/portal/perfilContratante
Puede obtenerse más información en la dirección mencionada arriba
Las ofertas o solicitudes de participación deben enviarse por vía electrónica a: https://elicitadores.adif.es/pdl_gdtel/index.action
Las ofertas o solicitudes de participación deben enviarse a la dirección mencionada arriba
I.4)Tipo de poder adjudicador
Organismo de Derecho público
I.5)Principal actividad
Servicios públicos generales

Apartado II: Objeto

II.1)Ámbito de la contratación
II.1.1)Denominación:


Ejecución de las obras de los proyectos de construcción del soterramiento de la línea R2 de cercanías de Barcelona a su paso por el casco urbano de Montcada i Reixac (Barcelona) y de la nueva estación


Número de referencia: 3.22/06110.0199–ON 020/22
II.1.2)Código CPV principal
45221242 Trabajos de construcción de túneles de ferrocarril
II.1.3)Tipo de contrato
Obras
II.1.4)Breve descripción:


Ejecución de las obras de los proyectos de construcción del soterramiento de la línea R2 de cercanías de Barcelona a su paso por el casco urbano de Montcada i Reixac (Barcelona) y de la nueva estación de Montcada i Reixac


II.1.5)Valor total estimado
Valor IVA excluido: 515 988 878.65 EUR
II.1.6)Información relativa a los lotes
El contrato está dividido en lotes: no
II.2)Descripción
II.2.2)Código(s) CPV adicional(es)
45234000 Trabajos de construcción de vías férreas y sistemas de transporte por cable
45213320 Trabajos de construcción de edificios relacionados con el transporte ferroviario
II.2.3)Lugar de ejecución
Código NUTS: ES España
II.2.4)Descripción del contrato:


Ejecución de las obras de los proyectos de construcción del soterramiento de la línea R2 de cercanías de Barcelona a su paso por el casco urbano de Montcada i Reixac (Barcelona) y de la nueva estación de Montcada i Reixac


II.2.5)Criterios de adjudicación
los criterios enumerados a continuación
Criterio de calidad - Nombre: Memoria y Programa de trabajo / Ponderación: 28
Criterio de calidad - Nombre: Calidad / Ponderación: 6
Criterio de calidad - Nombre: Programa de actuaciones medioambientales / Ponderación: 6
Criterio de calidad - Nombre: Memoria Seguridad y Salud / Ponderación: 6
Criterio de calidad - Nombre: Tecnología e I+D+i / Ponderación: 3
Precio - Ponderación: 51
II.2.6)Valor estimado
Valor IVA excluido: 515 988 878.65 EUR
II.2.7)Duración del contrato, acuerdo marco o sistema dinámico de adquisición
Duración en meses: 72
Este contrato podrá ser renovado: no
II.2.10)Información sobre las variantes
Se aceptarán variantes: no
II.2.11)Información sobre las opciones
Opciones: no
II.2.13)Información sobre fondos de la Unión Europea
El contrato se refiere a un proyecto o programa financiado con fondos de la Unión Europea: no
II.2.14)Información adicional

Apartado III: Información de carácter jurídico, económico, financiero y técnico

III.1)Condiciones de participación
III.1.1)Habilitación para ejercer la actividad profesional, incluidos los requisitos relativos a la inscripción en un registro profesional o mercantil
Lista y breve descripción de las condiciones:


Clasificación:


A-5-6


B-2-6


C-4-6


D-4-1


III.1.2)Situación económica y financiera
Criterios de selección indicados en los pliegos de la contratación
III.1.3)Capacidad técnica y profesional
Criterios de selección indicados en los pliegos de la contratación
III.2)Condiciones relativas al contrato
III.2.2)Condiciones de ejecución del contrato:


Las establecidas en el Pliego de cláusulas administrativas particulares


Apartado IV: Procedimiento

IV.1)Descripción
IV.1.1)Tipo de procedimiento
Procedimiento abierto
IV.1.3)Información sobre un acuerdo marco o un sistema dinámico de adquisición
IV.1.8)Información acerca del Acuerdo sobre Contratación Pública
El contrato está cubierto por el Acuerdo sobre Contratación Pública: no
IV.2)Información administrativa
IV.2.2)Plazo para la recepción de ofertas o solicitudes de participación
Fecha: 02/02/2023
Hora local: 13:00
IV.2.3)Fecha estimada de envío a los candidatos seleccionados de las invitaciones a licitar o a participar
IV.2.4)Lenguas en que pueden presentarse las ofertas o las solicitudes de participación:
Español
IV.2.6)Plazo mínimo durante el cual el licitador estará obligado a mantener su oferta
Duración en meses: 4 (a partir de la fecha declarada de recepción de ofertas)
IV.2.7)Condiciones para la apertura de las plicas
Fecha: 02/03/2023
Hora local: 10:00
Lugar:


Acto Privado


Apartado VI: Información complementaria

VI.1)Información sobre la periodicidad
Se trata de contratos periódicos: no
VI.2)Información sobre flujos de trabajo electrónicos
Se aceptará la facturación electrónica
VI.3)Información adicional:
VI.4)Procedimientos de recurso
VI.4.1)Órgano competente para los procedimientos de recurso
Nombre oficial: Tribunal Administrativo Central de Recursos Contractuales (TACRC)
Localidad: Madrid
Código postal: 28036
País: España
Fax: +34 917674490
VI.4.2)Órgano competente para los procedimientos de mediación
Nombre oficial: ÓRGANO DE CONTRATACIÓN DE ADIF
Dirección postal: Avda. Pío XII, 110 – Caracola 16
Localidad: MADRID
Código postal: 28036
País: España
Teléfono: +34 917744804
Fax: +34 917674490
VI.5)Fecha de envío del presente anuncio:
09/12/2022



Permalink


The Joint Venture MONTCADA, composed of FERROVIAL CONSTRUCCION SA from Madrid (33,34%), COMSA SAU from Madrid (33,33%) and FCC CONSTRUCCION SA  from Madrid  (33,33%) secured the EUR 446,61 million contract, excluding VAT, for  the implementation of works for the construction projects to reconstruct underground  the Barcelona suburban line R2 as it passes through the urban area of Montcada i Reixac (Barcelona) and the new station. It will be a 3-track tunnel (4 km). Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=668786-2023. Ref.n. 3.22/06110.0199. 48/23.  



Permalink

Spain, Andalusia - es/145

Railway

Negotiated invitation to tender, deadline 22nd April, 2008 for construction of lots A and B of the Las Lagunas-Cala de Mijas section on the Costa del Sol rail line. This section includes a 2 x 4 km tunnel. The two parallel tunnels will be bored using a pair of TBMs working towards La Cala de Mijas from the Fuengirola river. The time frame to complete the two contracts is 42 months. The first contract includes a shaft for the two TBMs, the electrical supply of the TBMs, the seaside, left tunnel, the cross passages to the parallel tube, a ventilation shaft, UIC track laying in the two tunnels and environmental restauration works. The second contract involves the hillside, right tunnel, the diaphragm wall station box for the future underground station in La Cala de Mijas, its internal structure and the external urban arrangements.The Costa del Sol rail line will enable high capacity trains with speeds of 220 to 250 km/h and suburban trains. The high capacity trains will provide very competitive services compared to private vehicles, with just 11.5 minutes from Estepona to Marbella and 10 minutes from Marbella to Fuengirola. The Ministry of development is responsible for the Fuengirola-Malaga section. So far, two thirds of the 30.4 km existing line has been dualled. The Andalusian regional government is in charge of the 56.6 km Estepona-Fuengirola section, which will run in majority underground in dense urban areas. Read E-News Weekly 10/2007, 50/2003. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=52060-2008 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=52059-2008, OJ S 38, or contact Ferrocarriles de la Junta de Andalucí­a, Sevilla, fax +34 955007573. E-mail carmen.camacho@ferrocarrilesdeandalucia.es 12/08.Open invitation to tender, deadline 20th May, 2008 for site supervision during construction of the Las Lagunas-Cala de Mijas section on the Costa del Sol rail line, including a 2 x 4 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=66452-2008, OJ S 48, or contact Ferrocarriles de la Junta de Andalucí­a, Sevilla, fax +34 955007573. E-mail carmen.camacho@ferrocarrilesdeandalucia.es 12/08.



Permalink


Open invitation to tender, deadline 05/10/2022, for renovation works of the Jabugo section -km96+430 on the Zafra-Huelva line.  For tender documents please click here and here, where tenders must be sent. Value of the contract is EUR19.27 million, excluding VAT. Duration of the contract is 9 months. Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=525668-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=419471-2022. Ref.n. 3.22/27507.0171. 40/22. 

 

Spain-Madrid: Railway construction works


2022/S 186-525668

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2022/S 147-419471)

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS
National registration number: Q2801660H
Postal address: AVENIDA PIO XII, 110 - EDIFICIO 16 (ESTACION DE CHAMARTIN)
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28036
Country: Spain
E-mail: elopez@adif.es
Telephone: +34 647304758
Internet address(es):
Main address: www.adif.es
Address of the buyer profile: https://contrataciondelestado.es/wps/portal/perfilContratante

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


EJECUCIÓN DE LAS OBRAS DE RENOVACIÓN INTEGRAL DE INFRAESTRUCTURA Y VÍA. TRAMO: JABUGO-96+430. LÍNEA ZAFRA-HUELVA


Reference number: 3.22/27507.0171
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:


EJECUCIÓN DE LAS OBRAS DE RENOVACIÓN INTEGRAL DE INFRAESTRUCTURA Y VÍA. TRAMO:JABUGO-96+430. LÍNEA ZAFRA-HUELVA


Section VI: Complementary information

VI.5)Date of dispatch of this notice:
22/09/2022
VI.6)Original notice reference
Notice number in the OJ S: 2022/S 147-419471

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 26/09/2022
Local time: 13:00
Read:
Date: 05/10/2022
Local time: 13:00
VII.2)Other additional information:



Permalink


Open invitation to tender, deadline 05/10/2022, for renovation works of km 96+430 -Calana section on Zafra-Huelva line.  For tender documents please click here and here, where tenders must be sent. Value of the contract is EUR 54.84million, excluding VAT. Duration of the contract  is 375 days. Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=528340-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=419472-2022. Ref.n. 3.22/27507.0177. 40/22. 

                       

Spain-Madrid: Railway construction works

2022/S 147-419472

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS
National registration number: Q2801660H
Postal address: AVENIDA PIO XII, 110 - EDIFICIO 16 (ESTACION DE CHAMARTIN)
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28036
Country: Spain
E-mail: elopez@adif.es
Telephone: +34 647304758
Internet address(es):
Main address: www.adif.es
Address of the buyer profile: https://contrataciondelestado.es/wps/portal/perfilContratante
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/portal/perfilContratante
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://elicitadores.adif.es
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: ADIF

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

EJECUCIÓN DE LAS OBRAS DEL PROYECTO DE CONSTRUCCION DE RENOVACIÓN INTEGRAL DE INFRAESTRUCTURA Y VÍA. TRAMO: 96+430 CALAÑAS. LÍNEA ZAFRA-HUELVA

Reference number: 3.22/27507.0177
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

EJECUCIÓN DE LAS OBRAS DEL PROYECTO DE CONSTRUCCION DE RENOVACIÓN INTEGRAL DEINFRAESTRUCTURA Y VÍA. TRAMO: 96+430 CALAÑAS. LÍNEA ZAFRA-HUELVA

II.1.5)Estimated total value
Value excluding VAT: 54 843 783.24 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
45221242 Railway tunnel construction work
45234116 Track construction works
II.2.3)Place of performance
NUTS code: ES61 Andalucía
Main site or place of performance:

HUELVA

II.2.4)Description of the procurement:

EJECUCIÓN DE LAS OBRAS DEL PROYECTO DE CONSTRUCCION DE RENOVACIÓN INTEGRAL DE INFRAESTRUCTURA Y VÍA. TRAMO: 96+430 CALAÑAS. LÍNEA ZAFRA-HUELVA

II.2.5)Award criteria
Criteria below
Quality criterion - Name: Criterios evaluables mediante un juicio de valor. Ponderación (PCJV): / Weighting: 49%
Cost criterion - Name: Criterios cuantificables mediante fórmulas. Ponderación (PCCF): / Weighting: 51%
II.2.6)Estimated value
Value excluding VAT: 54 843 783.24 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 375
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:

Va a ser financiado por la Unión Europea – NextGenerationEU.

II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.2)Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3)Technical and professional ability
Selection criteria as stated in the procurement documents

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Open procedure
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 29/09/2022
Local time: 13:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish
IV.2.7)Conditions for opening of tenders
Date: 10/11/2022
Local time: 10:00
Place:

LICITACIÓN ELECTRÓNICA

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Tribunal Administrativo Central de Recursos Contractuales
Postal address: Avenida General Perón, 38, 8ª planta
Town: Madrid
Postal code: 28020
Country: Spain
E-mail: tribunal_recursos.contratos@hacienda.gob.es
Telephone: +34 913491319
VI.4.4)Service from which information about the review procedure may be obtained
Official name: ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS (SUBDIRECCIÓN DE CONTRATACIÓN DE MANTENIMIENTO)
Postal address: AVENIDA PIO XII, 110 - EDIFICIO 16
Town: Madrid
Postal code: 28036
Country: Spain
E-mail: cfernandez@adif.es
Telephone: +34 913007005
Internet address: www.adif.es
VI.5)Date of dispatch of this notice:
28/07/2022



Permalink


Postponed to 13/10/2022 the deadline of the open invitation to tender, for renovation works on the km 96+430 -Calana section of the Zafra-Huelva line.  For tender documents please click here and here, where tenders must be sent. Value of the contract is EUR 54.84million, excluding VAT. Duration of the contract is 375 days. Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=542711-2022. Ref.n. 3.22/27507.0177. 41/22. 

 




Permalink


Postponed to 13/10/2022 the deadline of the open invitation to tender for renovation works of the Jabugo section -km96+430 on the Zafra-Huelva line.  For tender documents please click here and here, where tenders must be sent. Value of the contract is EUR19.27 million, excluding VAT. Duration of the contract is 9 months. Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=542710-2022. Ref.n. 3.22/27507.0171. 41/22. 

 




Permalink


Postponed to 14/10/2022 the deadline of the open invitation to tender, for renovation works of km 96+430 -Calana section on Zafra-Huelva line.  For tender documents please click here and here, where tenders must be sent. Value of the contract is EUR 54.84million, excluding VAT. Duration of the contract is 375 days. Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=554961-2022. Ref.n. 3.22/27507.0177. 41/22. 

 




Permalink


The Joint Venture Sacyr Construccion SA (70%)/Sacyr Neopul SA (30%) have secured the EUR 13.24 million contract, excluding VAT, for  renovation works of the Jabugo section -km96+430 on the Zafra-Huelva line.  For further information click here. Contact Adif, Madrid, tel +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=041735-2023. Ref.n. 3.22/27507.0171. 04/23.  

 




Permalink


Additional information on the contract  for renovation works of km 96+430 -Calana section on Zafra-Huelva line.  Click here for the 11 offers received and opened from 29/11/2022. Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=037538-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=661953-2022. Ref.n. 3.22/27507.0177. 04/23. 

 

 




Permalink


The Joint Venture Renovacion Calanas from Seville and composed of AZVI SAU and Martin Casillas SLU, secured the EUR38.72 million contract, excluding VAT, for renovation works of km 96+430 -Calana section on Zafra-Huelva line.  Contact Adif, Madrid, +34 647304758, email elopez@adif.es. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221360-2023. Ref.n. 3.22/27507.0177. 15/23.  



Permalink

Spain, Extremadura - es/144

Motorway

Open call for tenders, deadline 14th March, 2008 for upgrade of the equipment in the Miravete tunnel on the A-5 in Caceres province. The Miravete tunnel consists of two tubes of 1,141 m and 1,154 m. Read E-News Weekly 1/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10956-2008, OJ S 10, or contact Ministry of development, Madrid, fax +34 915978547 or 915978470. E-mail jmmendoza@fomento.es or cpublic@fomento.es 05/08.Ferrovial Agroman with Grupisa Infraestructuras has been awarded the EUR5.6 million contract to upgrade equipment in the twin-tube 1.15 km-long Miravete tunnel on the A5 motorway in Caceres province. Visit www.ferrovial.es and www.grupisa.es 45/08.Open invitation to tender, deadline 06.02.2009, for supervision of modernization works on the 1.15 km-long twin tube Miravete tunnel on the A5 motorway in Caceres province. Contact J M Mendoza at Ministry of Public Works, Madrid, fax +34 915978547, e-mail jmmendoza@fomento.es. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313716-2008 51/08.



Permalink

JV Geocontrol SA and Emilio Gonzalez Zamora SL secured the contract, value EUR264,258, for supervision of modernization works on the 1.15 km-long twin tube Miravete tunnel on the A5 motorway in Caceres province. Contact Ministry of Public Works, Madrid, tel +34 915978-341, -547, e-mail aggonzalez@fomento.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=178954-2009. 28/09.



Permalink

La Joint Venture formada por Geocontrol SA y Emilio González Zamora SL ha conseguido el contrato por valor de 264.258 euros para los trabajos de supervisión y remodelación del túnel de Miravete, de doble tubo y 1,15 Km de longitud, en la autopista A5 dentro de la provincia de Cáceres. Contacte con el Ministerio de Obras Públicas, Madrid teléfono: +34 915978-341, -547, correo electrónico: aggonzalez@fomento.es. Visite http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=178954-2009. 28/09.



Permalink